Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 LAccepted-Finance | ₹2.3 L | L1 | Accepted-Finance Being L1 |
| 2 | L2₹2.4 LRejected-Finance | ₹2.4 L | L2 | Rejected-Finance Highest rate from L2 |
| 3 | L3₹2.5 LRejected-Finance | ₹2.5 L | L3 | Rejected-Finance Highest rate from L2 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Required work order not submitted. Hence technically not Accepted. |
| 5 | Rejected-Technical | - | - | Rejected-Technical Document not submited by contractor. Hence Technically not Accepted. |
| Sl No | Description | Qty | Unit | KARTIK ENTERPRISES L1 | M/S S L CONSTRUCTION L2 | M/s QUALITY INFRABUILD PVT LTD L3 |
|---|---|---|---|---|---|---|
| 1.00Execution of work | ||||||
| 1.01 | Complete maintenance of the entire INTENSIVE garden features having as per yard stick in the garden area i.e. lawn trees, shrubs, herbs, edge, flower beds, foliage, creepers etc. including hoeing, weeding, pruning, replacement of plants, gap filling, watering, mowing of lawn, grass cutting by lawn mower and brush cutter, sweeping of lawns, picking of dry leaves, papers, plastic bottles, remove litter, removal of garden waste, applying insecticide, pesticide &fertilizers (whenever required) top dressing of lawn with good earth and manure and maintenance of other garden related works as directed by office-in-charge (Cost of Good Earth, Manure, Fertilizer, Insecticide, Pesticide will be provided by the1 Department & lawnmower and brush cutter with fuel and other T & P material/articles shall be provided by the contractor.) and as per direction of officer in charge.
(Total Area of the Garden = 3203.81 Sqm X 08 Months = 25630.48 Sqm. ) | 25,630.48 | Sqm | 7.4 ₹1,89,665.55 | 8 ₹2,05,043.84 | 5.8 ₹1,48,656.78 Lowest |
| 1.02 | Preparation of beds for hedging and shrubbery by excavating 60 cm deep and trenching the excavated base to a further depth of 30 cm, refilling the excavated earth after breaking clods and mixing with sludge or manure in the ratio of 8:1 (8 parts of stacked volume of earth after reduction by 20% : one part of stacked volume of sludge or manure after reduction by 8%) flooding with water, filling with earth if necessary, watering and finally fine dressing, levelling etc. including stacking and disposal of, materials declared unserviceable and surplus earth by spreading and levelling as directed, within a lead of 50 m, lift up to 1.5 m complete ( Cost of sludge, manure or extra earth to be paid for separately). | 38.61 | Cum | 360 ₹13,899.6 | 345 ₹13,320.45 Lowest | 500 ₹19,305 |
| 1.03 | Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2: 1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts ( Cost of manure, sludge or extra good earth if needed to be paid for separately) 60 cm dia and 60 cm deep. | 60 | Nos | 45 ₹2,700 Lowest | 48 ₹2,880 | 120 ₹7,200 |
| 1.04 | Supplying of Cow Dung Manure ( 8 % of Stack Measurement will be reduce for payment) | 7.9 | Cum | 735 ₹5,806.5 Lowest | 735 ₹5,806.5 Lowest | 2,500 ₹19,750 |
| 1.05 | Supplying of Good earth / Soil ( 20% of Stack Measurement will be reduce for payment) | 20.56 | Cum | 820 ₹16,859.2 Lowest | 820 ₹16,859.2 Lowest | 2,500 ₹51,400 |
Tender Value
₹2.3 L
EMD Value
₹4,593
Closing Date
5 Aug 2026, 2:00 pmClosed
Superintending Archaeologist
Office of the Superintending Archaeologist, Archaeological Survey of India, Jhansi Circle, Rani Mahal, Jhansi, Uttar Pradesh 284002
As per tender details
2026_ASI_917328_1
5-7/03/2026-27-JHI-G
Open Tender
Civil Works
Works
240 days
Jhansi
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹4,593
Yes
25 Aug 2026
14 Jul 2026
6 Aug 2026
14 Jul 2026
5 Aug 2026
14 Jul 2026
14 Jul 2026 - 28 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Execution of work | |||||
| 1.01 | Complete maintenance of the entire INTENSIVE garden features having as per yard stick in the garden area i.e. lawn trees, shrubs, herbs, edge, flower beds, foliage, creepers etc. including hoeing, weeding, pruning, replacement of plants, gap filling, watering, mowing of lawn, grass cutting by lawn mower and brush cutter, sweeping of lawns, picking of dry leaves, papers, plastic bottles, remove litter, removal of garden waste, applying insecticide, pesticide &fertilizers (whenever required) top dressing of lawn with good earth and manure and maintenance of other garden related works as directed by office-in-charge (Cost of Good Earth, Manure, Fertilizer, Insecticide, Pesticide will be provided by the1 Department & lawnmower and brush cutter with fuel and other T & P material/articles shall be provided by the contractor.) and as per direction of officer in charge.
(Total Area of the Garden = 3203.81 Sqm X 08 Months = 25630.48 Sqm. ) | 25,630.48 | Sqm | - | - |
| 1.02 | Preparation of beds for hedging and shrubbery by excavating 60 cm deep and trenching the excavated base to a further depth of 30 cm, refilling the excavated earth after breaking clods and mixing with sludge or manure in the ratio of 8:1 (8 parts of stacked volume of earth after reduction by 20% : one part of stacked volume of sludge or manure after reduction by 8%) flooding with water, filling with earth if necessary, watering and finally fine dressing, levelling etc. including stacking and disposal of, materials declared unserviceable and surplus earth by spreading and levelling as directed, within a lead of 50 m, lift up to 1.5 m complete ( Cost of sludge, manure or extra earth to be paid for separately). | 38.61 | Cum | - | - |
| 1.03 | Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2: 1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts ( Cost of manure, sludge or extra good earth if needed to be paid for separately) 60 cm dia and 60 cm deep. | 60 | Nos | - | - |
| 1.04 | Supplying of Cow Dung Manure ( 8 % of Stack Measurement will be reduce for payment) | 7.9 | Cum | - | - |
| 1.05 | Supplying of Good earth / Soil ( 20% of Stack Measurement will be reduce for payment) | 20.56 | Cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
tenderdocument.pdf
Tender Documents • 4.16 MB
BOQ_964017.xls
BOQ • 0.23 MB
letter.pdf
Additional Documents • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].