Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 2 ARYA NAGAR NARMADA ROAD JABALPUR 482001 | JABALPUR | JABALPUR | MADHYA PRADESH | 482001 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Rejected-Technical 6TH FLOOR CG HOUSE DR ANNIE BESANT ROAD WORLI MUMBAI MAHARASHTRA 400030 | MUMBAI | MAHARASHTRA | 400030 | Rejected-Technical Do not meet tender requirements |
Tender Value
Refer Docs
EMD Value
₹73.2 L
Closing Date
14 Jun 2021, 3:30 pmClosed
CE(Procurement)
Block no.3 Shakti Bhawan MPPTCL Jabalpur
Procurement of 400/220/33KV 315MVA Power Transformer
2021_MPPTC_139560_1
TR-12/2021
Open Tender
Electrical Goods/Equipments
365 days
MPPTCL site
As per Tender specification
3 documents required · 3 mandatory
₹22,400
Yes
₹73.2 L
Yes
23 Sept 2021
12 Apr 2021
15 Jun 2021
12 Apr 2021
14 Jun 2021
14 May 2021
Electrical Items :
315MVA, 400/220/33KV, Three phase ONAN/ ONAF cooled auto transformer including unloading on plinth at site fitted with RIP Bushings (HV/IV/LV/ Neutral RIP Bushings) as described in cl 11.13(B), air cell, NIFPS as described in cl 20.9, on line monitoring device as described in cl.20.10, Surge Capacitor with structure as described in cl.20.12, self re-generating breather as per cl.no. and all accessories/ fittings including OLTC as described under Annexure-II duly passed all routine additional routine and acceptance tests as per IS-2026 with one set of tools as per Annexure-X but without first filling of oil and meeting all technical requirement as per specification and Annexure I of Volume-II. The transformers shall be supplied fitted with Impact Recorder (on returnable basis) during transportation of Transformers and Vehicle tracking system (GPRS/ GPS/ GSM based) to track the exact position of the vehicle during transportation of Transformers as per clause no. 36 of Volume-II
Unit price of following items included in the Offered cost of transformer mentioned above shall be Offered separately.
a) On Line Monitoring Device
b) Complete System of Nitrogen Injection Drain and Stir Method type fire prevention and extinguishing system (NIFPS) including required Nitrogen cylinders dully filled, all piping works, Civil works with material etc.
c) Surge capacitor with structure
d) Self-re-generating maintenance free breathers
Charges for conducting Type test as per clause 24.3 of Volume-II
Temperature rise test (Heat run test)
Vacuum and pressure test on tank
ii. Charges for conducting Special test as per clause 24.4 of Volume-II
Measurement of zero seq. impedance as per cl.16.10 of IS-2026 Part I
Measurement of acoustic noise level as per cl.16.12 of IS:2026 part I
Measurement of power taken by fans as per clause 16.14 of IS-2026 Part I
Measurement of harmonic level of no load current as per clause 16.13 of IS 2026 Part I
IP:55 test on one cooler control cabinet & OLTC cabinet for transformer in accordance with IS : 2147
Test to prove over fluxing capability of transformer.
Cost of Set of RIP Bushings ( 420kV – 3nos, 245kV – 3nos & 72.5kV - 4nos including Neutral Bushing)
Cost of Set of OIP Condenser Bushings draw rod type (DR) (420kV – 3nos, 245kV – 3nos & 72.5kV - 4nos including Neutral Bushing)
Transformers and Rectifiers India Ltd.
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid