| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.8 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹24.7 L+₹95,701.94 (4.02%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹25.2 L+₹1.4 L (5.87%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | KRISHNA ENTERPRISES L3 | M/S TIYA CONSTRUCTION COMPANY L2 | M/s Raj Brothers and Suppliers Contractor L1 |
|---|---|---|---|---|---|---|
| 1.00Earth Work | ||||||
| 1.10 | Digging of Pond upto 3.00m deep By Excavator Machine (Poclain) and Including Shifting of excavated soil to Bund of Pond by Tractor Trolley. | 19,287.37 | Cum | 87.98 ₹16,96,902.81 | 88 ₹16,97,288.56 | 83 ₹16,00,851.71 Lowest |
| 1.20 | Earth work in manual dressing & Profile making of bund including remming and dressing the surface to required levels and slopes.(15% Earth actual qty for Bund) | 2,893.11 | Cum | 59.78 ₹1,72,950.12 | 55 ₹1,59,121.05 Lowest | 57 ₹1,64,907.27 |
| 1.30 | Dewatering Before and during the digging earth work, by diesel pumpset. | 290 | hours | 208.96 ₹60,598.4 | 209 ₹60,610 | 198 ₹57,420 Lowest |
| 2.00Construction of Inlet | ||||||
| 2.10 | E/W in digging in foundation in ordinery soil. | 12.68 | Cum | 61.78 ₹783.37 | 70 ₹887.6 | 58 ₹735.44 Lowest |
| 2.20 | C.C.1:4:8 in Foundation with cement, Fine sand and 40 mm gauge Brick ballast, including all. | 5.64 | Cum | 3,568 ₹20,123.52 | 3,568.8 ₹20,128.03 | 3,373 ₹19,023.72 Lowest |
| 2.30 | (i) Supply of RCC Hume pipe 900mm dia, NP-3 ISI mark including cartage, loading & Unloading and all tax etc. supply at work site. | 15 | RM | 4,626.16 ₹69,392.4 | 4,627.2 ₹69,408 | 4,373 ₹65,595 Lowest |
| 2.40 | (ii) Laying of 900mm dia Hume pipe including labour and T&P etc. required for proper completion of work. | 15 | RM | 359.92 ₹5,398.8 | 360 ₹5,400 | 340 ₹5,100 Lowest |
| 2.50 | (iii) Fixing of joints in 900mm dia Hume pipe with juit and cement etc. including all | 5 | RM | 569.87 ₹2,849.35 | 570 ₹2,850 | 539 ₹2,695 Lowest |
Tender Value
Refer Docs
EMD Value
₹2.5 L
Closing Date
16 Feb 2021, 11:00 amClosed
SUPERINTENDING ENGINEER, MINOR IRRIGATIO
OFFICE OF SUPERINTENDING ENGINEER, MINOR IRRIGATION CIRCLE, JAGRITI VIHAR, MEERUT
RENOVATION OF POND IN VILLAGE-VIRAMPUR (KASERUWALA POND), BLOCK-SIMBHAOLI, DISTT-HAPUR
2021_UPMID_553123_1
4259/E-6/2020-21
Open Tender
Civil Works - Water Works
Item Rate
30 days
VIRAMPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
EXECUTIVE ENGINEER, MINOR IRRIGATION DIVISION, HAP
₹2.5 L
Yes
17 Feb 2021
9 Feb 2021
16 Feb 2021
9 Feb 2021
16 Feb 2021
9 Feb 2021
Amount
Earth Work
Digging of Pond upto 3.00m deep By Excavator Machine (Poclain) and Including Shifting of excavated soil to Bund of Pond by Tractor Trolley.
Earth work in manual dressing & Profile making of bund including remming and dressing the surface to required levels and slopes.(15% Earth actual qty for Bund)
Dewatering Before and during the digging earth work, by diesel pumpset.
Construction of Inlet
E/W in digging in foundation in ordinery soil.
C.C.1:4:8 in Foundation with cement, Fine sand and 40 mm gauge Brick ballast, including all.
(i) Supply of RCC Hume pipe 900mm dia, NP-3 ISI mark including cartage, loading & Unloading and all tax etc. supply at work site.
(ii) Laying of 900mm dia Hume pipe including labour and T&P etc. required for proper completion of work.
(iii) Fixing of joints in 900mm dia Hume pipe with juit and cement etc. including all
First class Brick work in 1:4 Cement, Sand mortar including all.
C.C.1:2:4 in cement, coarse sand and 10 to 20 mm stone grit, including all.
Cement plaster 1:4 cement, Sand, mortar including all material & labour etc.
Construction work of Outlet
E/W in digging in foundation in ordinery soil.
C.C.1:4:8 in Foundation with cement, Fine sand and 40 mm gauge Brick ballast, including all.
(i) Supply of RCC Hume pipe 900mm dia, NP-3 ISI mark including cartage, loading & Unloading and all tax etc. supply at work site.
(ii) Laying of 900mm dia Hume pipe including labour and T&P etc. required for proper completion of work.
(iii) Fixing of joints in 900mm dia Hume pipe with juit and cement etc. including all
First class Brick work in 1:4 Cement, Sand mortar including all.
C.C.1:2:4 in cement, coarse sand and 10 to 20 mm stone grit, including all.
Cement plaster 1:4 cement, Sand, mortar including all material & labour etc.
Construction work of Ramp
E/W in digging in foundation in ordinery soil.
C.C.1:4:8 in Foundation with cement, Fine sand and 40 mm gauge Brick ballast, including all.
First class Brick work in 1:4 Cement, Sand mortar including all.
C.C.1:2:4 in cement, coarse sand and 10 to 20 mm stone grit, including all.
Cement plaster 1:4 cement, Sand, mortar including all material & labour etc.
M/S TIYA CONSTRUCTION COMPANY
KRISHNA ENTERPRISES
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .