| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.7 LAccepted-AOC 47 ABC TARUN NAGAR BY LANE 6 BY LANE 6 GUAWHATI KAMRUP ASSAM 781005 | KAMRUP METRO | ASSAM | 781005 | L1 | Accepted-AOC Accept | |
| 2 | L2₹7.1 L+₹37,782.77 (5.64%)Rejected-AOC | L2 | Rejected-AOC Reject | |
| 3 | L3₹7.4 L+₹67,643.88 (10.1%)Rejected-AOC | L3 | Rejected-AOC Reject | |
| 4 | L4₹8.0 L+₹1.3 L (19.4%)Rejected-AOC | L4 | Rejected-AOC Reject |
Tender Value
₹7.1 L
EMD Value
₹14,280
Closing Date
11 Sept 2021, 2:00 pmClosed
Executive Engineer, M/Garh Canal W/S Division, NNL
Executive Engineer, M/Garh Canal W/S Division, Narnaul
Construction of new boundary wall in open space and dismantling of 4th class Tyype Quarter F-1 to F-5 in Canal Colony, Narnaul
2021_HRY_186024_2
No. 3258-75/6A Dated 27/08/2021
Open Tender
Civil Works
Item-rate/Agreement basic
90 days
NARNAUL
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
₹14,280
Yes
22 Sept 2021
2 Sept 2021
13 Sept 2021
2 Sept 2021
11 Sept 2021
2 Sept 2021
Amount
Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead :Of area 3 sq. metres and below (HSR No. 5.29.1)
Demolishing brick tile covering in terracing including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. (HSR 5.14)
Demolishing R.C.C. work by mechanical means and stockpiling at designated locations and disposal of dismantled materials, stacking serviceable and unserviceable material separately including cutting reinforcement bars. ( HSR 5.25)
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In cement mortar (HSR 5.7.4)
Dismantling cement conglomerate / terrazzo floors 25 mm to 50 mm manually/ by mechanical means and disposal of material within standard lead as per direction of Engineer- in-charge.(HSR 5.42)
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. All kinds of soil (HSR 4.14.1)
1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) ( HSR 6.1.6).
Brick work with common burnt clay non modular bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:4 (1 cement : 4 coarse sand)(HSR 7.20.1).
Providing and laying damp-proof course with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III): 4 graded stone aggregate 12.5mm nominal size)40 mm thick and Providing & applying a coat of residual petroleum bitumen of grade of VG-10 of approved quality using 1.7kg per square metre on damp proof course after cleaning the surface with brushes and finally with apiece of cloth lightly soaked in kerosene oil.(HSR 6.8.2 + 6.10)
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.(HSR. 13.28).
Painting the wooden / metal surface with synthetic enamel paint of approved brand and manufacture to give an even shade :Two or more coats on new work(HSR No. 11.82.1)
12 mm cement plaster of mix :1:4 (1 cement: 4 coarse sand)(HSR 11.8.1)
Finishing walls with water proofing cement paint of required shade : New work (Two or more coats applied @ 3.84 kg/10 sqm)(HSR 11.93.1)
Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 1 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.(HSR 4.33)
Credit of Bricks. (Note:-Rate should not less than DTR)
Credit of Steel. (Note:-Rate should not less than DTR)
Credit of Wooden Items. (Note:-Rate should not less than DTR)
Sachin Sharma
Rohit Kumar, Contractor
Ashok Kaushik, Contractor
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .