Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 CrAdmitted-Finance | -31.76% | ₹1.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.4 Cr+₹5.3 L (3.85%)Admitted-Finance | -29.13% | ₹1.4 Cr+₹5.3 L (3.85%) | L2 | Admitted-Finance |
| 3 | L3₹1.6 Cr+₹19.1 L (14.0%)Admitted-Finance | -22.21% | ₹1.6 Cr+₹19.1 L (14.0%) | L3 | Admitted-Finance |
| 4 | L4₹1.9 Cr+₹54.1 L (39.6%)Admitted-Finance | -4.71% | ₹1.9 Cr+₹54.1 L (39.6%) | L4 | Admitted-Finance |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
Tender Value
₹2.0 Cr
EMD Value
₹4.0 L
Closing Date
6 Aug 2026, 6:00 pmClosed
EO MUNICIPAL BOARD MERTA CITY
EO MUNICIPAL BOARD MERTA CITY
Construction of Road and Nala from Malkot to Nayko ka Chowk
2026_DLB_578834_1
NIT-NO-09/2026-27 EO MUNICIPAL BOARD MERTA CITY
Open Tender
Civil Works
Percentage
180 days
Merta City
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
EO MUNICIPAL BOARD MERTA CITY/MD RISL JAIPUR
₹4.0 L
Yes
11 Aug 2026
29 Jul 2026
7 Aug 2026
29 Jul 2026
6 Aug 2026
29 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per MoRT&H specification clause 301.In all type of soil | 1,312.5 | Cum | 235.5 | ₹3,09,093.75 |
| 2 | Carriage of Materials by mechanical transport including loading, unloading and stacking ::earth additional 2km lead | 1,312.5 | Cum | 185.54 | ₹2,43,521.25 |
| 3 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to a lead of 50 metres from road boundary including removal and disposal of top organic soil not exceeding 150 mm in thickness as directed by Engineer. | 0.72 | Ha | 61,600 | ₹44,352 |
| 4 | Supplying and stacking good earth at site of work | 2,625 | Cum | 324.5 | ₹8,51,812.5 |
| 5 | carriage of earth material, lead - Beyond 10 Km. upto 20 Km. per Km. | 2,625 | Cum | 491.77 | ₹12,90,896.25 |
| 6 | Providing and laying lean cement concrete 1:4:8 in Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing complete as per clause 601, 112 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. | 880 | Cum | 3,070 | ₹27,01,600 |
| 7 | Providing and laying un-reinforced, plain cement concrete mix withConcrete Mixer & vibrator pavement over a prepared sub base with43 grade cement , coarse and fine aggregate conforming to IS: 383, maximum size of coarse aggregate not exceeding 25 mm, mixed asper approved mix design, laid, spread, compacted and finished in acontinuous operation including provision of contraction, expansion,construction and longitudinal joints etc including all material, labour,machinery, lighting, guarding and maintenance of diversion. PCC M-20 | 1,317.5 | Cum | 6,340 | ₹83,52,950 |
| 8 | Silt clearance of drains, channels and canals with lift 1.5 Mtr and lead up to 50 Mtr | 253.13 | Cum | 384.5 | ₹97,326.56 |
| 9 | Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per MoRT&H specification clause 301.In all type of soil | 1,215 | Cum | 235.5 | ₹2,86,132.5 |
| 10 | Carriage of Materials by mechanical transport including loading, unloading and stacking ::earth additional 2km lead | 1,468.13 | Cum | 185.54 | ₹2,72,395.91 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.24 MB
BOQ_1028667.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .