Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.2 LAdmitted-Finance | -42.60% | ₹5.2 L | L1 | Admitted-Finance |
| 2 | L2₹5.2 L+₹4,411.30 (0.85%)Admitted-Finance | -42.11% | ₹5.2 L+₹4,411.30 (0.85%) | L2 | Admitted-Finance |
| 3 | L3₹5.3 L+₹13,503.98 (2.61%)Admitted-Finance | -41.10% | ₹5.3 L+₹13,503.98 (2.61%) | L3 | Admitted-Finance |
| 4 | L4₹5.5 L+₹35,560.47 (6.88%)Admitted-Finance | -38.65% | ₹5.5 L+₹35,560.47 (6.88%) | L4 | Admitted-Finance |
| 5 | L5₹7.0 L+₹1.8 L (35.5%)Admitted-Finance | -22.24% | ₹7.0 L+₹1.8 L (35.5%) | L5 | Admitted-Finance |
Tender Value
₹9.0 L
EMD Value
₹18,005
Closing Date
20 Jun 2026, 6:00 pmClosed
Executive Engineer I and FC poonch
Office of the Executive Engineer I and FC poonch
Restoration Improvement of Damaged spots of Sarar main khul
2026_IFC_311691_2
e-NIT No.09 of 2026-27 Dated 06-06-2026
Open Tender
Civil Works - Canal
Percentage
POONCH
as per NIT
2 documents required · 2 mandatory
₹600
Office of the Executive Engineer I and FC poonch
₹18,005
Office of the Executive Engineer I and FC poonch
2 Jul 2026
6 Jun 2026
22 Jun 2026
6 Jun 2026
20 Jun 2026
6 Jun 2026
16 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : | 99.46 | cum | 479.3 | ₹47,671.18 |
| 2.01 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 5.19 | cum | 5,202.9 | ₹27,003.05 |
| 3.01 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size): PCC | 47.39 | cum | 5,733.6 | ₹2,71,715.3 |
| 4.01 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: 7.1.1 Cement mortar 1:6 (1 Cement : 6 coarse sand) | 74.2 | cum | 5,402.9 | ₹4,00,895.18 |
| 5.01 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4(1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size): | 3.98 | cum | 6,591.25 | ₹26,233.18 |
| 6.01 | Centering and shuttering including strutting, propping etc. and removal of form work | 160.2 | sqm | 286.35 | ₹45,873.27 |
| 7.01 | Supply of stones : qty. @ 0.85 vide item no 4 | 63.07 | cum | 700 | ₹44,149 |
| 8.01 | Carriage of Sand & aggr. By an average distance of by 100 m by HL only . | 105.12 | cum | 244.36 | ₹25,687.12 |
| 9.01 | Carriage of Aggr. 40 mm by an average distance of by 100 M by Hl only . | 0.37 | cum | 264.17 | ₹97.74 |
| 10.01 | Carriage of stones by an average distance of 2km by MT only . | 63.07 | cum | 173.46 | ₹10,940.12 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.61 MB
BOQ_1009186.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .