Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical ACCEPTED |
| 2 | Accepted-Technical | Accepted-Technical ACCEPTED |
Tender Value
₹8.4 L
EMD Value
₹8,384
Closing Date
21 Sept 2026, 5:00 pmClosed
EXECUTIVE ENGINEER
TOWN HALL CHHATRAPATI SAMBHAJINAGAR
Providing Patchwork of Existing Various Road in Zone No. 10.
2026_AMCA_1339868_1
CSMC/Dy. Eng./Zone No.(10)/2026/335
Open Tender
Civil Works
Percentage
90 days
TOWN HALL CHHATRAPATI SAMBHAJINAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
₹8,384
6 Oct 2026
18 Sept 2026
22 Sept 2026
18 Sept 2026
21 Sept 2026
18 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for roadway in earth, soil of all sorts, sand, gravel or soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m. and spreading for embankment or stacking as directed. As Per SSR Item No. 2.11. | 18 | Cu.M | 124.77 | ₹2,245.86 |
| 2 | Conveying materials obtained from road cutting including all lifts, laying in layers of20cm to 30cm. breaking clods, dressing to the required lines, curves, grades and section, watering and compacting to not less than 97% of standard Proctor density for a lead of over 5 KM. inclusive from the site of excavation to the site of deposition as directed. As Per SSR Item No. 2.25 | 18 | Cu.M | 264.45 | ₹4,760.1 |
| 3 | Providing earth work in embankment with approved materials obtained from departmental land or other sources upto lead of 50m. including all lifts, laying in layers of 20cm. to 30cm. thickness breaking clods, dressing to the required lines, curves, grades and section, watering and compaction with vibratory roller with V-Sat attachment to achieve not less than 97 % of standard proctor density etc. complete. As Per SSR Item No. 2.27. | 33.05 | Cu.M | 629.35 | ₹20,801.59 |
| 4 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader / Paver on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 -- Plant Mix Method and Grading - II Material. As Per SSR Item No. 3.02. | 16.66 | Cu.M | 2,663.4 | ₹44,368.78 |
| 5 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. Laying By Grader/Paver. As Per SSR Item No. 3.23 | 52.58 | Cu.M | 2,640.95 | ₹1,38,871.71 |
| 6 | Providing and laying bituminous macadam using crushed aggregate of Grading 1, premixed with bituminous binder, transported at site with VTS, laid over a previously prepared surface , finished to the required grade ,level, alignment,and rolling to achieve the desired density for 80/100 mm compacted thickness with drum mix type hot mix plant with SCADA having complying essential features of Hot mix plant as per IRC-27 2009 specified conditions and attachments such as electronic load sensor based belt conveyers,automatic synchronization of bitumen and aggregate fedder,built in dust controller system and PLC for Drum Mix plant , Sensor paver,and Vibratory roller excluding prime/Tack coat etc. complete --Bitumen 3.30% of specified grade (VG-30 bulk bitumen rates are considered to arrive at rates) As Per SSR Item No. 3.42. | 34.12 | Cu.M | 8,278.31 | ₹2,82,462.56 |
| 7 | Providing and applying tack coat on the prepared surface heating by fames in Boiler and spraying bitumen set footed in bitumen boller on B.T. surface 2.5 kg/10 sqm.(VG-30 bulk bitumen rates are considered to arrive at rates) . As Per SSR Item No. 3.30. | 1,717.24 | Sq.M | 19.85 | ₹34,087.21 |
| 8 | Providing and laying bituminous concrete using crushed aggregate of grading 1, premixed with bituminousbinder @5.40% by weight of total mix and filler, transported at site with VTS, laid over a previously prepared surface, finished to the required grade ,level, alignment, and rolling to achieve the desired density for 50mm compacted thickness with drum mix plant with SCADA, Sensor paver and Vibratory roller excluding prime/Tack coat etc. complete --Bitumen of specified grade with stone dust filler. (VG-30 bulk bitumen rates are considered to arrive at rates). As Per SSR Item No. 3.50. | 25.76 | Cu.M | 12,064.62 | ₹3,10,767.72 |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
BOQ_2290691.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .