Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-Finance 00 OPP RASHMI HOSPITAL RAYA ROAD LAXMI NAGAR MATHURA UTTAR PRADESH 281204 | MATHURA | UTTAR PRADESH | 281204 | L1 | Accepted-Finance QUALIFIED FINANCIAL SUMMARY | |
| 2 | L1₹4.9 LAccepted-Finance | L1 | Accepted-Finance QUALIFIED FINANCIAL SUMMARY |
Tender Value
₹4.9 L
EMD Value
₹4,900
Closing Date
5 Dec 2023, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EDC SPN
KRISHNA NAGAR JAIL ROAD SHAHJAHANPUR
FOR INSTALLATION OF NEW DISTRIBUTION TRANSFORMERS UNDER THE AREA OF EDD-SECOND UNDER EDC-SHAHAJAHANPUR
2023_MVVNL_858796_1
63(W)/EDCS/2023-24
Open Tender
Miscellaneous Works
Item Rate
30 days
SHAHJAHANPUR
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
SE EDC
₹4,900
Yes
10 Dec 2023
2 Nov 2023
5 Dec 2023
2 Nov 2023
5 Dec 2023
2 Nov 2023
Amount
SAFE CARRIAGE OF STP SUPPORT 11.00 METER LONG FROM STORE BYEBAGH TO VARIOUS SITES UNDER EDD JBD INCLUDING LOADING AND UNLOADING BOTH SIDES
SAFE CARRIAGE OF PCC POLE SUPPORT 9 METER LONG FROM STORE BYEBAGH TO VARIOUS SITES UNDER EDD JBD INCLUDING LOADING AND UNLOADING BOTH SIDES
SAFE CARRIAGE OF ACSR WEASEL CONDUCTOR AND OTHER LINE MATERIAL FROM STORE BYEBAGH TO VARIOUS SITES UNDER DISTRIBUTION DIVISION INCLUDING LOADING AND UNLOADING BOTH SIDES
SAFE CARRIAGE OF LT CABLE XLPE 1*400 SQ MM FROM STORE BYEBAGH TO VARIOUS SITES INCLUDING LOADING AND UNLOADING BOTH SIDES
SAFE CARRIAGE OF LT CABLE XLPE 3.5X150 MM SQ MM FROM STORE BYEBAGH TO VARIOUS SITES INCLUDING LOADING AND UNLOADING BOTH SIDES
SAFE CARRIAGE OF THREE PHASE DISTRIBUTION BOX FROM STORE TO SITE
Disc insulator
PIN INSULATOR
11 KV TPMO
11 KV FUSE SET
TOP CHANNEL, 125*65*2240
DROPPER CHANNEL100*50*2028 mm
HOLDING CLAMPS FOR TOP CHANNEL
STONE PAD
LT CLAMPS WITH N&B AND SHACKLE INSULATOR
11 KV TPMO
PG CLAMPS
PIERCING CONNECTOR
ALUMINIUM LUGS 400 SQ MM CABLE
STAY SET WITH COMPLETE JOB
SAFE CARRIAGE OF AB CABLE 3*120 MM SQ MM FROM STORE BYEBAGH TO VARIOUS SITES INCLUDING LOADING AND UNLOADING BOTH SIDES
SAFE CARRIAGE OF AB CABLE 3*95 MM SQ MM FROM STORE BYEBAGH TO VARIOUS SITES INCLUDING LOADING AND UNLOADING BOTH SIDES
SAFE CARRIAGE OF 100 KVA DTR FROM STORE BYEBAGH TO VARIOUS SITES UNDER INCLUDING LOADING AND UNLOADING BOTH SIDES
SAFE CARRIAGE OF 250 KVA DTR FROM STORE BYEBAGH TO VARIOUS SITES UNDER INCLUDING LOADING AND UNLOADING BOTH SIDES
CONCRETING / GROUTING OF PCC 8.5 METER COMPLETE JOB AS PER RESSPO SPECIFICATION. ALL GROUTING MATERIAL WILL BE PROVIDED AND ARRANGED BY THE CONTRACTOR.
EARTHING OF POLES (COMPLETE JOB)
EARTHING OF DISTRIBUTION TRANSFORMER OF 400/250 KVA BY EARTHING CHEMICAL BY DIGGING / DRILLING OF PIT APPROX 10 FIT (L.S.3 MTR) DEPTH AND INSERTING G.I. PIPE OF 1.25" DIA OF 'B' GRADE AND THEN FILL UP THE CHEMICAL WITH WATER AND COMPLETE TO THE REQUIREMENT. TWO NO. OF EARTHING OF EACH TRANSFORMER ONE FOR THE TRANSFORMER NEUTRAL AND ANOTHER FOR TRANSFORMER BODY, DOUBLE POLE & EQUIPMENT ETC. TO BE DONE. THE TOP OF THE INSERTED PIPE TO BE CONNECTED TO THE NEUTRAL AND TRANSFORMER BODY THROUGH G.I. STRIP WITH THE HELP OF NUT AND BOLT OR BY WELDING AS PER DIRECTION OF THE AUTHORISED REPRESENTATIVE OF THE DEPARTMENT. IT INCLUDES THE COST OF ALL MATERIALS, LABOUR, T&P PROVIDE BY THE CONTRACTOR FOR PROPER COMPLETION OF WORK.
CONSTRUCTION OF PLINTH OF SIZE 2.0X2.0X1.5 Mtr. CONSISTING EARTH WORK IN EXCAVATION, C.C. WORK IN RATIO 1:4:8, Ist CLASS BRICK WORKS IN 1:4:6, R.C.C. WORK IN RATIO 1:2:4 AND PLASTER WORK OF 10 MM THICKNESS IN RATIO 1:4. AND MOUNTING OF 100/250/400 KVA NEW TRANSFORMER AT NEWLY CONSTRUCTED PLINTH INCLUDING FIXING ALL REQUIRED ACCESSORIES, MAKING CONNECTION, ENERGISATION, COMPLETE IN ALL RESPECT. (ALL DECENTRALIZED MATERIAL WILL BE PROVIDED ARRANGED BY THE CONTRACTOR)
MAKING OF CAZE WIREMESH FENCING WITH PROVISION OF ENTRY GATE AROUND THE PLINTH (250/400 KVA T/f) ON THAT TOE WALL WITH 01 INCH SQUARE NET TO AVOID ELECTRIAL ACCIDENT OF HUMAN/ ANIMAL WITH PAINTING OF FENCING WITH 02 NO. COAT OF RED OXIDE PAINT AND 01 NO. SILVER PAINT COMPLETE IN ALL RESPECT.
MOUNTING OF 250 KVA NEW TRANSFORMER AT NEWLY CONSTRUCTED PLINTH INCLUDING FIXING ALL REQUIRED ACCESSORIES, MAKING CONNECTION, ENERGISATION, COMPLETE IN ALL RESPECT. (ALL DECENTRALIZED MATERIAL WILL BE PROVIDED ARRANGED BY THE CONTRACTOR)
MOUNTING OF 100 KVA NEW TRANSFORMER AT NEWLY CONSTRUCTED DOUBLE POLE STRUCTURE INCLUDING FIXING ALL REQUIRED ACCESSORIES, MAKING CONNECTION, ENERGISATION, COMPLETE IN ALL RESPECT. (ALL DECENTRALIZED MATERIAL WILL BE ARRANGED BY THE CONTRACTOR)
LAYING OF LT ABC CABLE 3*50SQ MM ON POLE
STRING AND SAGGING OF ACSR WEASEL CONDUCTOR
FIXING OF DANGER BOARD ON PROPER PLACE AS PER RESSPO NORMS.
M/s Shubham Traders
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .