| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.5 LAccepted-AOC | ₹21.5 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹21.6 LRejected-AOC | ₹21.6 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | P GUNASEKARAN L1 | M RAMAKRISHNAN L2 |
|---|---|---|---|---|---|
| 1.001.Construction of 60,000 litres Capacity OHT (12.0 m Staging) @ Thummalapatty H/O Noothlapuram Est RS 21.80 Lakhs | |||||
| 2.00Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete In hard stiff clay, stiff black cotton soil, hard red earth, sales, murrams, gravel, stoney earth, earth mixed with small sized boulders and hard gravelly soil S.S.20B | |||||
| 3.00 | First depth of 0 to 2 m | 59.1 | M3 | 263 ₹15,543.30 | 264 ₹15,602.40 |
| 4.00 | Second depth of 2.0m to 3.0 m | 10.21 | M3 | 276 ₹2,817.96 | 277 ₹2,828.17 |
| 5.00 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 2.92 | M3 | 1,889 ₹5,515.88 | 1,890 ₹5,518.80 |
| 6.00 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 4.37 | M3 | 5,401 ₹23,602.37 | 5,402 ₹23,606.74 |
| 7.00Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | |||||
| 8.00 | Below 1.5m from GL | 9.27 | M3 | 9,278 ₹86,007.06 | 9,280 ₹86,025.60 |
| 9.00 | 0m to 1.50m below GL | 2.53 | M3 | 9,139 ₹23,121.67 | 9,140 ₹23,124.20 |
| 10.00 | 0m to 1.00m above GL | 0.49 | M3 | 9,280 ₹4,547.20 | 9,281 ₹4,547.69 |
Tender Value
₹21.8 L
EMD Value
₹21,800
Closing Date
5 Feb 2026, 3:00 pmClosed
BDO BP
BDO BP UNION OFFICE NILAKOTTAI
TN-05-03-15th fin com (DP) - 60000 OHT-NLK
2026_RDTN_650771_1
TN-05-03-15th fin com (DP) - 60000 OHT-NLK
Open Tender
Civil Works - Water Works
270 days
Thummalapatty
TN-05-03-15th fin com (DP) - 60000 OHT-NLK
4 documents required · 4 mandatory
₹0
₹21,800
Yes
26 May 2026
3 Feb 2026
5 Feb 2026
3 Feb 2026
5 Feb 2026
3 Feb 2026
1.Construction of 60,000 litres Capacity OHT (12.0 m Staging) @ Thummalapatty H/O Noothlapuram Est RS 21.80 Lakhs
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete In hard stiff clay, stiff black cotton soil, hard red earth, sales, murrams, gravel, stoney earth, earth mixed with small sized boulders and hard gravelly soil S.S.20B
First depth of 0 to 2 m
Second depth of 2.0m to 3.0 m
Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Below 1.5m from GL
0m to 1.50m below GL
0m to 1.00m above GL
1.00m to 4.50m above GL
4.50 m to 7.32 m above GL
7.32 m to 10.98 m above GL
10.98 m to 14.64 m above GL
14.64 m to 18.30 m above GL
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)
For Plan surface
Below GL
From GL to 3.30m
From 3.31m to 4.30m
From 5.31m to 6.30m
From 6.31m to 7.30m
From 8.31m to 9.30m
From 9.31m to 10.30m
From 11.31m to 12.30m
Square Column:
Square Column Below GL and upto 3.30m above GL
3.31m to 4.30m ht
4.31m to 5.30m ht
5.31m to 6.30m ht
6.31m to 7.30m ht
7.31m to 8.30m ht
8.31m to 9.30m ht
9.31m to 10.30m ht
10.31m to 11.30m ht
11.31m to 12.30m ht
CURVED SURFACE
Curved Surface - upto 3.30m ht.
Curved Surface - 3.30m to 4.30m ht.
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Providing outside M.S Ladder of 45cm wide made out of 50x50x6mm MS angle for sides and steps fixed at 30 cm centre to centre etc.and providing of Landing slabs with hand rails using 32mm GI pipe and 40mmx6mm MS flat etc. as per approved design
Providing and fixing of RCC inner access ladder in RCC 1:1.5:3 (One cement, one and half sand and three aggregates) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centering shuttering charges, mixing concrete curing etc.,
Providing GI Ventilation arrangement 2 nos mosquito proof nylon net with 65 mm GI pipe and spls as directed by the TWAD Board officers 1 m 65 mm Gi pipe, 4 nos 65 mm Gi elbow , 4nos cutting and 8 nos threading and 2 nos 65 mm GI tee
Providing cut stone slab in CM 1:3 of size 0.3 m x 0.3 m x 0.15 m and as directed by TWAD Board officers
Providing manhole cover of size 0.60 x 0.60M in RCC 1:1.5:3 with suitable reinforcement and 50x50x6mm MS angle fixed along edges and as directed by TWAD Board officers
Provisions for pipe connection arrangements for inlet & outlet scour and overflow etc.,cincluding cost of pipes, specials, valve, labour charges for lifting , aligning, cutting,threading,fixing and painting of GI pipes with two coat of approved quality enamel paint etc.,complete
50mm GI Pipe
50MM GI coupling
50mm GI Elbow
50mm GI Union
50mm GI Hex Nipple
50mm GM Gate Valve
50mm GI Tee
65mm dia GI pipes
65mm dia GI Tee
65mm dia GI Elbow
65mm dia GM Gate valve
65mm dia GI Coupling
65mm GI Dummy (Heavy)
Supply of 90 mm dia PVC pipe 4 Kgs
Earthwork excavation for hard stiff clay and hard rock earth and pipe laying, jointing and refilling the trench with excavation soils for water line
Refilling the foundation with excavated earth including consolidation as directed by the TWAD Board officers
Towards the cost of Providing Name board including cost and conveyance of all materials and all labour charges etc.,complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
Tendernotice_2.pdf
PDF • 0.60 MB
Tendernotice_3.pdf
PDF • 2.79 MB
BOQ_780301.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid