| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹4.9 L+₹14,233.43 (3.00%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹5.1 L+₹33,211.33 (7.00%)Rejected-Finance VILL P O AMJAI BARDHAMAN BARDHAMAN 713203 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713203 | L3 | Rejected-Finance L3 |
Tender Value
₹4.7 L
EMD Value
₹6,000
Closing Date
7 May 2024, 11:00 amClosed
AREA ENGINEER EnM, JHANJRA AREA
OFFICE OF THE GENERAL MANAGER, JHANJRA AREA, PO-LAUDOHA, BO, DIST. - PASCHIM BARDHAMAN, PIN-713385
Dismantling, transportation, installation, commissioning and trial run including necessary fabrication jobs (including civil works) of one 800mm width, 1x 75KW, 550v, PVC belt conveyor for a length of 60m in 1100 m of new incline (along the incline)
2024_ECL_307080_1
ECL/GM/JNR/EnM/A2/24-25/01 Dated 23.04.2024
Open Tender
Miscellaneous Works
Item Rate
15 days
JHANJRA UNDERGROUND
Please refer Tender documents.
4 documents required · 4 mandatory
₹6,000
16 Sept 2024
26 Apr 2024
8 May 2024
26 Apr 2024
7 May 2024
27 Apr 2024
26 Apr 2024 - 3 May 2024
Amount
PART A E&M WORKS
Dismantling of -4FL belt at 40D(ie discharge(1.37MT), drive head including motor and gear box(6.5MT), tail end(0.87MT), 60 mtrs structure(3.17MT))
Transportation and Installation of 1x75KW, 550V, Drive Head unit Complete with Drive Drum, Driven Drum, Gear Box, Motor, Coupling, Bearing Block etc. after loading it on MUV.
Transportation and Installation of Discharge Unit Complete with Cleaner after loading it on MUV.
Transportation (manually and by MUV) and Installation of Tail-end Unit Complete, after loading it on MUV.
Transportation and Installation of 60 meters of 800 mm belt structure, after loading it on MUV.
Transporting, laying, lapping & jointing of 126 meters of 800 mm belting.
Laying/placement of starter, ACB, cables and lock out devices and 80 mtr 70 sqmm armoured cable from -4FL/40D to proposed site .
PART B CIVIL WORKS
Recess cutting in stone
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1½ :3 (1 Cement: 1½ coarse sand(zone-III): 3 graded stone aggregate 20 mm nominal size).
1:3:6 (1 Cement: 3 coarse sand(zone-III): 6 graded stone aggregate 20 mm nominal size).
Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns, etc. for mass concrete
Brick work with Fly ash bricks of class desgn 75 in foundation and plinth in: CM 1:6 (1 cement: 6 coarse sand)
12 mm cement plaster of mix:1:6 (1 cement: 6 fine sand)
Loading material(sand and, stone aggregate below 40 mm nominal size) into MUV and unloading at UG
Loading material (cement) into MUV and unloading at UG
Loading material (bricks) into MUV and unloading at UG(1000 NOS)
Total impact of GST for the purpose of CTC
K R ENTERPRISE
F.R. ENTERPRISE
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .