| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.0 CrAccepted-AOC 28 29 GALI NO 05 MAHABIR PARK 124507 | BAHADURGARH | JHAJJAR | HARYANA | 124507 | ₹5.0 Cr | 1 | Accepted-AOC DUE TO LOWER SIDE |
| 2 | 2₹5.2 Cr+₹17.9 L (3.58%)Rejected-AOC NEAR SHIV MANDIR VILLAGE RAJPURA KHARKARI TEHSIL AND DISTRICT BHIWANI 127031 | BHIWANI | HARYANA | 127031 | ₹5.2 Cr+₹17.9 L (3.58%) | 2 | Rejected-AOC DUE TO HIGHER SIDE |
| 3 | 3₹5.7 Cr+₹69.8 L (14.0%)Rejected-AOC HOUSE NO 3000 SECTOR 15 HOUSING BOARD COLONY SONIPAT 131001 | SONIPAT | SONIPAT | HARYANA | 131001 | ₹5.7 Cr+₹69.8 L (14.0%) | 3 | Rejected-AOC DUE TO HIGHER SIDE |
| 4 | 4₹7.3 Cr+₹2.3 Cr (46.3%)Rejected-AOC HOUSE NO 953 SECTOR 23 HUDA BHIWANI TEHSIL AND DISTRICT BHIWANI | BHIWANI | BHIWANI | HARYANA | ₹7.3 Cr+₹2.3 Cr (46.3%) | 4 | Rejected-AOC DUE TO HIGHER SIDE |
| 5 | 5₹8.7 Cr+₹3.7 Cr (74.6%)Rejected-AOC HSVP PANCHKULA | PANCHKULA | HARYANA | 133301 | ₹8.7 Cr+₹3.7 Cr (74.6%) | 5 | Rejected-AOC DUE TO HIGHER SIDE |
Tender Value
₹6.1 Cr
EMD Value
₹12.1 L
Closing Date
15 Feb 2022, 2:00 pmClosed
EXECUTIVE ENGINEER
EXECUTIVE ENGINEER PUBLIC HEALTH ENGINEERING DIVISION NO 2 HISAR
Const of 400 mm dia RCC Pipe IC 1 No RCC SS Tanks Const of 1point50 MLD WTP 2 No RCC CWT RCC Suction Well for RW RCC Scour Well for Clear water1 No PC Dewatering Dismantling of Old Structures removing Development of WW B wall Iron Gate pipe line
2022_HRY_207431_1
2192 dated 04.02.2022
Open Limited
Civil Works
Works
7 days
HISAR
Please refer Tender documents.
3 documents required · 3 mandatory
₹20,000
₹12.1 L
Yes
1 Apr 2022
9 Feb 2022
15 Feb 2022
9 Feb 2022
15 Feb 2022
9 Feb 2022
Amount
Construction of 1.50 MLD water purification plant Scada Based at Water works, comprising of labor for DI pipe form existing Raw water main/pump , inlet box, inlet channel, Alum dozing, Flash mixing, Tapered flocculate Rectangular setting tank, filter box over head reservoir for back wash including pump sets and electric control panel covers, air scour equipment, chemical house including chlorination equipment and arrangement of flow measurement and sand bed complete in all respect as per DNIT . Labour rate for fixing DI Specials/ fitting, Fitting, ISI marked PN 1.6 sluice valves including cost of excavation, laying cutting, jointing threading and jointing material in horizontal length including connection complete in all respect. From existing raw water main pump to inlet box of filter unit to clear water tank, Note- DI pipe will be supplied by the department free of cost. (Sluice valve of make IVC/ VAG ) BASED ON SCADA SYSTEM-1.50 MLD WTP
Supply & erection of Horizontal spindle split casing type pumping sets minimum Four (4) Star rating duties coupled to AC squrrel cage induction type motor with 1440 RPM, 3 phase 50 Hz and accessories as described in Schedule No.II complete in all respect with priming arrangement with complete base frame as per IS marked complete in all respect A) Raw water pump set Raw Water Pump set 3700 LPM 12 Mtrs Head at Raw water pumping station
Supply, erection, testing and commissioning of wall mounted electrical panel board, fabricated from 16 SWG CRCA sheet duly stouted with suitable angle iron frame work and completely powder coated of approximate size 1200x900 mm having following items. (A) For Raw Water Pump set 3700 LPM 12 Mtrs Head 2 Nos. at water works a) Main switch a100 Amp2 No.(L&T Siemens, ABB) b) Volt meter 100x100 mm range 0 to 500 volt 1 No.(AE/KAPPA/L&T) C) Amp meter 100X100mm range 0 to 100 Amp 2 Nos. (AE/KAPPA/L&T) D) CT 100/ 3 Nos. (AE/KAPPA/L&T) E) VSS 1 No.& ASS 2 No. each of approved make F) SPP 1 No. of approved make g) Motor starter, Star delta 2 No.for 3700 LPM 12 Mtr head motor (L&T, Simens,AAB) H) Capacity KVAR as per site requirement 2 No. I) Indicating Lamp - One Set J) Change Over switch 100 Amp. as required = 1 No.
(B) For Clear Water Pump Sets for 2000 LPM x 40 Mtrs. Head, = 2 Nos at water works a) Main switch 100 Amp 2 No.(L&T Siemens, ABB) b) Volt meter 100x100 mm range 0 to 500 volt 1 No.(AE/KAPPA/L&T) C) Amp meter 100X100mm range 0 to 100 Amp 2 Nos. (AE/KAPPA/L&T) D) CT 100/ 3 Nos. (AE/KAPPA/L&T) E) VSS 1 No.& ASS 2 No. each of approved make F) SPP 1 No. of approved make g) Motor starter, Star delta 2 No.for 2000 LPM 40 Mtr H) Capacity KVAR as per site requirement 2 No. I) Indicating Lamp - One Set J) Change Over switch 100 Amp. = 1 No.
(C) For Clear Water Pump set 1800 LPM x30 Mtrs Head 2 Nos. at W/W for filling of B/Stn. a) Main switch 100 Amp.2 No.(L&T Siemens, ABB) b) Volt meter 100x100 mm range 0 to 500 volt 1 No.(AE/KAPPA/L&T) C) Amp meter 100X100mm range 0 to 100 Amp 2 Nos. (AE/KAPPA/L&T) D) CT 100/ 3 Nos. (AE/KAPPA/L&T) E) VSS 1 No.& ASS 2 No. each of approved make F) SPP 1 No. of approved make g) Motor starter, Star delta 2 No.for 1800 LPM 30 Mtr H) Capacity KVAR as per site requirement 2 No. I) Indicating Lamp - One Set J) Change Over switch 100 Amp. = 1 No.
(D) For Clear Water Pump set 1100 LPM x 35 Mtrs Head 2 Nos. at B/Stn. Bhagana Road a) Main switch 100 Amp. 2 No.(L&T Siemens, ABB) b) Volt meter 100x100 mm range 0 to 500 volt 1 No.(AE/KAPPA/L&T) C) Amp meter 100X100mm range 0 to 100 Amp 2 Nos. (AE/KAPPA/L&T) D) CT 100/ 3 Nos. (AE/KAPPA/L&T) E) VSS 1 No.& ASS 2 No. each of approved make F) SPP 1 No. of approved make g) Motor starter, Star delta 2 No.for 1100 LPM 35 Mtr H) Capacity KVAR as per site requirement 2 No. I) Indicating Lamp - One Set J) Change Over switch 100 Amp = 1 No.
(E) For Clear Water Pump set 800 LPM 35 Mtrs Head 2 Nos. (At Boosting Station Ladwa Road) a) Main switch 100 Amp 2 No.(L&T Siemens, ABB) b) Volt meter 100x100 mm range 0 to 500 volt 1 No.(AE/KAPPA/L&T) C) Amp meter 100X100mm range 0 to 100 Amp 2 Nos. (AE/KAPPA/L&T) D) CT 100/ 3 Nos. (AE/KAPPA/L&T) E) VSS 1 No.& ASS 2 No. each of approved make F) SPP 1 No. of approved make g) Motor starter, Star delta 2 No.for 800 LPM 35 Mtr H) Capacity KVAR as per site requirement 2 No. I) Indicating Lamp - One Set J) Change Over switch 100 Amp = 1 No.
Supplying erection, testing of ISI marked copper wire for 6 Nos. motors with under ground system in PVC and flexible pipes copper wire size complete in all respects i) 6 sq mm 3 core
ii) 10 sq mm 3 core
iii) 16 sq mm 3 core
Providing erection, testing of reputed make LED light 100 watts with fitting and accessories complete in all respect
Supply erection, testing of light fittings including wire in the Pump Chamber with material upto 10 points including switch, button, plug, PVC conduit pipe & copper wire etc. as per approved specifications complete in all respects
Lowering of sub-soil water level upto bottom of the foundation concrete of the Structures by providing well point system on both side of the trench including cost of 100 mm dia boring. Providing and installing pipes 100 mm dia for the bore developing for a successful bore, providing and installation of pumping machinery, suction/delivery pipes, disposal of water 20 mtr away from bore point including cost of repair maintenance, running cost machinery, and diesel oil charges, consumable items, pay of the operational staff, and dismantling of the pumping machinery, and filling the bores with sand after use and reinstallation the same to the next site for repeating of the above process of well point system, if required complete construction/testing of the structures under dry condition Nothing extra will be paid for any difficulties met with during execution/construction, This, item is only payable for after Completion of Structures and notihing shall be payable if the water table is lowered and construction work is delayed or not done due to any reason what so far. For Const of S S Tank at Water works
For Const of S S Well at Water works
For Const of Clear water Tank at Water works
For Const of Clear water Tank at B/Stn.
Less Credit of old material Bricks
Bricks bats
RCC pipe 400mm i/d
Credit of Old Pumping Machinery Raw Water = 2000 LPM x 12 Mtr Head
Clear Water = 600 LPM x 40 Mtr Head = 1 700 LPM x 40 Mtr Head = 2 3000 LPM x 45 Mtr Head = 1 1600 LPM x 45 Mtr Head = 1
Operation and mantenence of WTP complete scope of work ( Distiction Material Supplied by the PHED) as per schedule - iv for a period of 5 year after 12 months during defect liability period and 3 months trial run period ( wil be charged to a/mtc. estimate. Complete in all respect Operation and mantenence during defect liability period ( Operation Only ) after 3 months trial run period
For 1st Year Operation and Maintenance after defect liability period
For 2nd Year Operation and Maintenance after defect liability period
For 3rd Year Operation and Maintenance after defect liability period
For 4th Year Operation and Maintenance after defect liability period
For 5th Year Operation and Maintenance after defect liability period
Bidder Name
Amount
Ravinder Sharma Contractor(GSTN-06APJPR8270D1ZO)
suresh kumar(GSTN-06AIPPK4333B1ZJ)
Jaiveer Singh Contractor(GSTN-06ATQPS8420H1Z8)
ROHTASH KUMAR CONTRACTOR(GSTN-NA)
MAHA LAXMI CONSTRUCTION COMPANY(GSTN-NA)
suresh kumar
Jaiveer Singh Contractor
MAHA LAXMI CONSTRUCTION COMPANY
ROHTASH KUMAR CONTRACTOR
Ravinder Sharma Contractor
Jaiveer Singh Contractor
MAHA LAXMI CONSTRUCTION COMPANY
ROHTASH KUMAR CONTRACTOR
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .