| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 LAccepted-Finance | L1 | Accepted-Finance Being the lowest bidder L1 | |
| 2 | L2₹3.9 L+₹503.81 (0.13%)Accepted-Finance | L2 | Accepted-Finance L2 | |
| 3 | L3₹4.0 L+₹7,086.31 (1.81%)Accepted-Finance | L3 | Accepted-Finance L3 | |
| 4 | L4₹4.0 L+₹12,310.57 (3.14%)Accepted-Finance | L4 | Accepted-Finance L4 | |
| 5 | L5₹4.1 L+₹20,983.51 (5.36%)Accepted-Finance | L5 | Accepted-Finance L5 |
Tender Value
₹6.3 L
Closing Date
24 Jul 2023, 4:00 pmClosed
DFO Doda
Forest Complex Doda
Installation and survey of Boundary Pillers, 81 BPs in Kulhand Forest of Kuntwara Range in Forest Division Doda under CAMPA 2023-24
2023_FD_218527_1
e NIT 36 of 2023-24 dtd. 24-06-2023
Open Tender
Civil Works
Item Rate
90 days
Kuntwara Range
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
DFO Doda
Exempted
26 Jul 2023
24 Jun 2023
25 Jul 2023
24 Jun 2023
24 Jul 2023
24 Jun 2023
Amount
Earth providing work in excavation by manual means in trenches for foundations drains, pipes cables, etc. (Not exceeding 1.5 mte width) and for shafts, wells, cesspits and the like not exceeding 10sq in plane. Depth height upto 1 mtr from cutting edge, disposal earth is to leveled and neatly dressed. All kind of soil. 81 numbers sides = 1.00 with dimensions 2.5 x 1.50 x 3.25 = 987.188 cft.
Providing and lying in position cement concrete of specified grade exclusing the cost of centering and shuttering. All work upto plinth level 1:3:6 ( 1 cement and 3 coarse sand 6 graded stone aggregate 20 mm nominal size) crused of (i) 81 numbers of sides = 1.00 with dimensions 2.5 x1.50 x 2.00 = 607.50 cft, (ii) 81 numbers of sides = 1.00 with dimensions 1.5 x 0.50 x 2.00 = 121.50 cft and (iii) 81 numbers of side 1.00 with dimension 2.50 x 1.50 x 0.25 = 75.94 cft.
Filling available excavated earth ( Excluding rock) in trenches plinth sides foundation etc in layers not exceeding 20 cm depth consolidating layer by remaining and watering load upto 50 mtr and lift upto 1.5 m of (i) 81 numbers of sides = 1.00 with dimensions 2.5 x 1.50 x 1.00 = 303.75 cft and (ii) 81 numbers of sides = 1.00 with dimensions 1.5 x 0.50 x 1.00 = 60.75 cft
Reinforced cement concrete work in walls ( any thickness) including attached pllasters buttresses, plinth and string courses fillets, columns, pillars, fillets, piers, abutments, posts and struts etc upto floor five level excluding cost of cetering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement 1.5 coarse sand 3 graded crushed stone aggregate 20 mm nominal size.) of 81 numbers of sides = 1.00 with dimensions 1.5 x 0.50 x 6.00 = 364.50 cft
Reinforcement for RCC work including straightening,cutting bening, placing in position and binding all complete cold twisted cold twisted bars having 81 numbers (i) 4 numbers of Iron bars having length 6 feet = 1944 feet = 592.68 mtr which includes Weight Kg/mtr = 0.62 = total weight = 367.46 Kg (ii) 8 numbers of Iron bars having length 1.5 feet = 972 feet = 296.34 mtr which includes Weight Kg/mtr = 0.39 = total weight = 115.57 Kg
Painting of pillars (with superior and exterior paint) including costs of labour charges incliuding painting of forest department logo and the front phase of the pillar with stencil for mainline BPs Red shade. Adventure 2189 (Nerolac) and for chak BPsYellow shade. Bumble bee 2014 (Nerolac) Exterior Emulsion paint is recommended. Solicon and acrylic emulsion based.
Centering and shuttering including shuttering propping etc and removal of form work for columns piers abutments pillers posts and struts for (i) 81 number having 2 sides of length 1.50 feet x depth height 6.00 feet = 1458 sft. = 135.50 Sqm (ii) 81 number having 2 sides of length 0.50 feet x depth height 6.00 feet = 486 sft = 45.17 Sqm.
Carriage of material from source to site of work by M.T and H.L av for Bajri av. M.T 22 Km and H.L 5150 mtr
Add for Repedite
Providing labour for bush clearance and materials like paint brush, measuring taps, etc. to the Forest Survey team consitituted by the Forest Departmenton account of Survey of 81 Nos. Boundary Pillars.
Carriage of material from source to site of work by M.T and H.L av for Sand av. M.T 22 Km and H.L 5150 mtr
MOHD ASLAM
MANZOOR AHMED
ABDUL RASHID BATT
MOHD ARIF BUTT
KASHMIR SINGH
ASHWANI KUMAR
JAVEED IQBAL
ASHFAQ AHMED
SHABIR AHMED
SHAZIA AZIZ
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .