Loading…
Loading…
Tender Value
₹1.3 L
EMD Value
₹3,825
Closing Date
1 Sept 2026, 6:00 pm4d left
office of the executive engineer rew ang
office of the executive engineer rew ang
C/O BATHROOM AT MIRISI MOHLA WUZKHA BLOCK CHITTERGUL
2026_RDPR_322433_8
ENIT100of2026-27
Open Tender
Civil Works
Percentage
30 days
anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
office of the executive engineer rew ang
₹3,825
26 Aug 2026
26 Aug 2026
2 Sept 2026
26 Aug 2026
1 Sept 2026
26 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : | 1 | Cum | - | - |
| - | Providing & laying of dry solling hand packing, in foundation & Trecnhes FOR A LEAD OF 3 KM AND HL 300 m | - | Cum | - | - |
| - | P/L in position cement conc. of grade 1:4:8 (1 cement : 4 fine sand : 8 Nallah graded stone agg 40 mm N/s) excl. cost of centering & shuttering in all work upto plinth level | - | Cum | 1 | - |
| - | P/L in position cement conc. of grade 1:3:6 (1 cement : 3 fine sand : 6 stone agg 20 mm N/s) excl. cost of centering & shuttering in all work upto plinth level. | 1 | Cum | - | - |
| - | Brick work with common burnt clay F.P.S. (non-modular) bricks of class designation 75 in foundation & plinth in cement mortar 1:6 (1 Cement : 6 coarse sand) | 1 | Cum | - | - |
| - | Extra for B/W above Plinth Level upto Floor V Level | 1 | cum | - | - |
| - | Centering and Shuttering I/c Strutting, Propping etc & removal of formwork for suspended roofs | - | sqm | - | - |
| - | Centering and Shuttering I/c Strutting, Propping etc & removal of formwork for walls of any thickness plinth | - | sqm | - | - |
| - | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings,balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | Cum | - | - |
| - | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1 | Cum | 1 | ₹1 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.37 MB
BOQ_1080781.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].