| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 LAccepted-AOC | ₹8.3 L | L1 | Accepted-AOC Low quoted |
| 2 | L2₹8.4 L+₹10,470.01 (1.25%)Rejected-Finance NO 59 SOUTH STREET NAGARAPPADI POST SRIMUSHNAM TALUK CUDDALORE 608703 | SRIMUSHNAM | CUDDALORE | TAMIL NADU | 608703 | ₹8.4 L+₹10,470.01 (1.25%) | L2 | Rejected-Finance high quoted |
| Sl No | Description | Qty | Unit | Kaliyamoorthy L2 | ARIKRISHNAN L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation and depositing on bank with in initial lead of 10 mand initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 19.22 | cum | 300 ₹5,766 | 263 ₹5,054.86 Lowest |
| 2.00 | Supplying and filling in foundation and basement with good sand in layers not more 15 cm thick including ramming, watering and compacting etc.complete complying to standard specification | 3.69 | cum | 3,000 ₹11,070 | 2,425 ₹8,948.25 Lowest |
| 3.00 | Cement Concrete in 1 : 4 : 8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete | 5.46 | cum | 6,500 ₹35,490 | 6,290 ₹34,343.4 Lowest |
| 4.00 | Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate. The binding wire shall be supplied by the Contractor. | 1.25 | MT | 92,000 ₹1,15,000 | 91,963 ₹1,14,953.75 Lowest |
| 5.00 | R.C.C. 1:1.5:3-using 20mm ISS HBGS metal including cost and conveyance of materials and labour charges etc. complete. (Below Basement) | 6.74 | cum | 10,500 ₹70,770 | 10,040 ₹67,669.6 Lowest |
| 6.00 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. Below Basement. | 29.66 | sqm | 547 ₹16,224.02 Lowest | 547 ₹16,224.02 Lowest |
| 7.00 | Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete Upto basement | 3.25 | cum | 6,239 ₹20,276.75 Lowest | 6,239 ₹20,276.75 Lowest |
| 8.00 | Providing & applying 12 mm thick cement plaster in CM 1:5 (1 part of cement: 5 parts of sand) to walls internally in single coat at all levels to correct line and level including chicken wire mesh at all joints of brick and concrete surfaces with minimum overlap of 150 mm in all directions, scaffolding, rounding off or champhering of corners, offsets, fin/ bands, projections, etc. and cleaning of surface, raking out joints, roughening of surface, chiseling the undulated surface wherever necessary and curing, etc., all materials and labour complete in all respects including all lead, lift and descent and as directed. | 211.04 | SQM | 292 ₹61,623.68 Lowest | 292 ₹61,623.68 Lowest |
| 9.00 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. Above Basement | 78.64 | sqm | 1,095 ₹86,110.8 Lowest | 1,095 ₹86,110.8 Lowest |
| 10.00 | Reinforced Cement concrete 1:1.5:3 mix using 20mm ISSHBG metal from approved sources including cost and conveyance of all materials to work site and all labour charges for mixing, laying, and watering etc., complete. Above basement | 6.98 | cum | 10,181 ₹71,063.38 Lowest | 10,181 ₹71,063.38 Lowest |
Tender Value
₹8.4 L
EMD Value
₹8,440
Closing Date
12 May 2026, 4:00 pmClosed
Block Development Office (BP)
Block Development Officer
Construction of kitchen Shed at Mazhavarayanallur High School in Mazhavarayanallur Panchayat in Srimushnam Block Under NP MDMS 2025-26.
2026_RDTN_676357_1
A3/4235/2025 NP MDMS 2025-26
Open Tender
Civil Works - Buildings
Item Wise
Srimushnam
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹8,440
Yes
1 Sept 2026
7 May 2026
12 May 2026
7 May 2026
12 May 2026
7 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation and depositing on bank with in initial lead of 10 mand initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 19.22 | cum | 263.78 | ₹5,069.85 |
| 2 | Supplying and filling in foundation and basement with good sand in layers not more 15 cm thick including ramming, watering and compacting etc.complete complying to standard specification | 3.69 | cum | 2,425.01 | ₹8,948.29 |
| 3 | Cement Concrete in 1 : 4 : 8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete | 5.46 | cum | 6,290.72 | ₹34,347.33 |
| 4 | Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate. The binding wire shall be supplied by the Contractor. | 1.25 | MT | 91,963.6 | ₹1,14,954.5 |
| 5 | R.C.C. 1:1.5:3-using 20mm ISS HBGS metal including cost and conveyance of materials and labour charges etc. complete. (Below Basement) | 6.74 | cum | 10,040.67 | ₹67,674.12 |
| 6 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. Below Basement. | 29.66 | sqm | 547.5 | ₹16,238.85 |
| 7 | Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete Upto basement | 3.25 | cum | 6,239.63 | ₹20,278.8 |
| 8 | Providing & applying 12 mm thick cement plaster in CM 1:5 (1 part of cement: 5 parts of sand) to walls internally in single coat at all levels to correct line and level including chicken wire mesh at all joints of brick and concrete surfaces with minimum overlap of 150 mm in all directions, scaffolding, rounding off or champhering of corners, offsets, fin/ bands, projections, etc. and cleaning of surface, raking out joints, roughening of surface, chiseling the undulated surface wherever necessary and curing, etc., all materials and labour complete in all respects including all lead, lift and descent and as directed. | 211.04 | SQM | 292.48 | ₹61,724.98 |
| 9 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. Above Basement | 78.64 | sqm | 1,095 | ₹86,110.8 |
| 10 | Reinforced Cement concrete 1:1.5:3 mix using 20mm ISSHBG metal from approved sources including cost and conveyance of all materials to work site and all labour charges for mixing, laying, and watering etc., complete. Above basement | 6.98 | cum | 10,181.74 | ₹71,068.55 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
DOC.pdf
Tender Documents • 0.17 MB
BOQ_812764.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .