Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.1 LAdmitted-Finance | -3.00% | ₹12.1 L | L1 | Admitted-Finance |
| 2 | L2₹12.7 L+₹62,483.81 (5.15%)Admitted-Finance | +2.00% | ₹12.7 L+₹62,483.81 (5.15%) | L2 | Admitted-Finance |
| 3 | L3₹12.9 L+₹74,980.58 (6.19%)Admitted-Finance | +3.00% | ₹12.9 L+₹74,980.58 (6.19%) | L3 | Admitted-Finance |
Tender Value
₹12.5 L
EMD Value
₹24,994
Closing Date
21 Jul 2026, 3:00 pmClosed
CHIEF ENGINEER
1 SAROJINI NAYDU MARG CIVIL LINE PRAYAGRAJ
Zone-08 Ward-75 Kohna antargat Awas Vikas Yojana-03 me Chandra Prakash Tiwari se Arun Kumar Tiwari hote hue Vijayam Sadan tak kshatigrast sadak aur nali ka sudhar karya.
2026_NNAMC_1169078_23
21.07.2026
Open Tender
Civil Works
Percentage
60 days
CIVIL LINE
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,535
AS PER DOCS
₹24,994
15 Sept 2026
16 Jul 2026
21 Jul 2026
16 Jul 2026
21 Jul 2026
16 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentling of existin enchrochment like ramp, platform etc monolethic structure and inding stacking of materials with all complete work | 322.5 | Sqm | 51 | ₹16,447.5 |
| 2 | Earth work Exavation in Ordinary soil lead lift &30 m lead with aqll complete work (S.I.No.251) | 91.8 | cum | 160 | ₹14,688 |
| 3 | PCC 1:6:12 cement sand and 40mm brick ballast and all compelte the work (s.I.No.-273) | 16.32 | Cum | 3,500 | ₹57,120 |
| 4 | Earth work in cutting filling in ordinary soil etc all complete work | 210.38 | Cum | 87.3 | ₹18,366.17 |
| 5 | M-150 brick work (1:4) cement sand mortor including all complete work (S.I.No.303) | 46.97 | cum | 5,300 | ₹2,48,941 |
| 6 | Flush pointing (1:2) cement sand mortor including all complete the work (S.I.NO.575) | 76.5 | Sqm | 166 | ₹12,699 |
| 7 | Struck Pointing (1:2) cement sand mortor including all complete work (S.I.No.574) | 255 | sqm | 197 | ₹50,235 |
| 9 | Construction of Granular Sub base (G.S.B) by providing closed graded material mixing by mix in place method including water and compacting with vibratory rollers as per MORT& H specification401 | 70.13 | cum | 1,654.8 | ₹1,16,051.12 |
| 10 | Providing &laying of Rubber molded reflective Zig-Zag 80 mm thick Interlocking tiles of precast compressive strength I.S.I marked. In gray based Including joints filled and bedding 5cm. With local sand leveling dressing of surface required level &slop and also including all materail labour T&p loading unloading stacking cartage and all taxes required for proper completion of work as per MORD specification No.1500 | 701.25 | sqm | 930.3 | ₹6,52,372.88 |
| 11 | R.CC work (1:1.5:3) with cement course sand &20mm the stone grit including all complete work (S.I.No.279B) | 2.25 | Cum | 9,300 | ₹20,925 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.07 MB
Tendernotice_2.pdf
PDF • 1.47 MB
BOQ_2194584.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .