| Sl No | Description | Qty | Unit | IRSHAD AHMAD LONE L1 | AL FALAH ELECTRICAL WORKS L3 | M/S MALIK CONSTRUCTIONS AND SUPPLIERS L2 |
|---|---|---|---|---|---|---|
| 1.00Shifting/Re-alignment of HT/LT Network along with Sub-Stations from Budiwudder to Kreshbal for road widening to be carried by Executive Engineer, Division Ganderbal PMGSY (JKRRDA) falling under the jurisdiction of ESD Nawakadal, ED-3rd (Turnkey Basis). | ||||||
| 1.01 | Supply, Installation, Testing and commissiong of S.T. poles 9.0 Meter long swaged Type conforming to ST 410 SP-33, IS: 2713 amended up-to date well finished and coated with black bituminous paint upto plant depth and Red-Oxide coated above ground level with earthing arrangement through bolt welded on pole of 14mm diameter, provided at height of 300mm above the planting depth which should be 1.5ms (SP 33). Top plate 3mm thick fully welded & bottom plate 35cm*35cm, 5mm thick fully welded. | 20 | No. | 13,762.47 ₹2,75,249.4 Lowest | 15,500 ₹3,10,000 | 17,000 ₹3,40,000 |
| 1.02 | Supply, installation, testing and commissioning of 11 KV Gapless Surge Arrestor,9 kV, 10 kA, LA with polymer housing, Stn. Type conforming to IEC-99-4 Capable of withstanding Maximum continuous operating voltages (M.C.O.V) | 2 | set | 2,000 ₹4,000 Lowest | 4,000 ₹8,000 | 3,000 ₹6,000 |
| 1.03 | Supply, installation, testing and commissioning of 11 KV Horn, Gap (fuse 3-phase 200A) as per Relevant IS. | 2 | Set | 3,200 ₹6,400 Lowest | 3,500 ₹7,000 | 3,500 ₹7,000 |
| 1.04 | Supply, installation, testing and commissioning of 11KV 200 Amperes, Triple pole switches Gang Operated (G.O. Set) conforming: IS-2544, IS: 5340 (Part-III) and SS: 9921 (Part-I -V) | 2 | Set | 7,700 ₹15,400 Lowest | 11,900 ₹23,800 | 11,000 ₹22,000 |
| 1.05 | Supply, installation, testing and commissioning of 400 mm2 XLPE LT Cable Single Core, Un-Armoured, XLPE lnsulated Stranded Conductor FRLS type including lugs/clamps/thimbles. | 100 | Mtr | 950 ₹95,000 | 800 ₹80,000 | 700 ₹70,000 Lowest |
| 1.06 | Supply, Fabrication and fixing of GI Channel/Angle/Flat of sizes including clamps /Collars 50x8mm | 870 | Kg | 112 ₹97,440 | 110 ₹95,700 Lowest | 135 ₹1,17,450 |
| 1.07 | Supply, Installation, Testing and commissiong of 11kV Polymeric composite Pin Insulator with pins 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm | 66 | No. | 190 ₹12,540 Lowest | 240 ₹15,840 | 200 ₹13,200 |
| 1.08 | Supply, Installation, Testing and commissiong of 11KV Disc Insulators (Polymer Type) 12 KV, 45KN Complete with fittings (Lighting Impulse 75 KV positive and 80 KV negative , creepage distance 320 mm) | 12 | No. | 230 ₹2,760 | 200 ₹2,400 Lowest | 600 ₹7,200 |
| 1.09 | Proving and laying of Pole Earthing Complete by GI Pipe 40 mm 3mtr long through GI Strip 25x3 mm | 34 | No. | 890 ₹30,260 | 550 ₹18,700 Lowest | 800 ₹27,200 |
Tender Value
₹16.7 L
EMD Value
₹33,320
Closing Date
2 Sept 2026, 4:00 pmClosed
Executive Engineer, ED-3rd Srinagar
Executive Engineer, ED-3rd Srinagar
Shifting/Re-alignment of HT/LT Network along with Sub-Stations from Budiwudder to Kreshbal for road widening to be carried by Executive Engineer, Division Ganderbal PMGSY (JKRRDA)
2026_PDD_321349_1
ED-III /15 of 2026-27, Dated - 19/08/2026
Open Tender
Electrical Works
Turn-key
15 days
Office of Executive Engineer, ED-3rd Srinagar
Refer SBD, Technical Specifications and Drawings
7 documents required · 7 mandatory
₹1,000
Executive Engineer, ED-3rd Srinagar
₹33,320
8 Sept 2026
19 Aug 2026
3 Sept 2026
19 Aug 2026
2 Sept 2026
22 Aug 2026
22 Aug 2026 - 25 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Shifting/Re-alignment of HT/LT Network along with Sub-Stations from Budiwudder to Kreshbal for road widening to be carried by Executive Engineer, Division Ganderbal PMGSY (JKRRDA) falling under the jurisdiction of ESD Nawakadal, ED-3rd (Turnkey Basis). | |||||
| 1.01 | Supply, Installation, Testing and commissiong of S.T. poles 9.0 Meter long swaged Type conforming to ST 410 SP-33, IS: 2713 amended up-to date well finished and coated with black bituminous paint upto plant depth and Red-Oxide coated above ground level with earthing arrangement through bolt welded on pole of 14mm diameter, provided at height of 300mm above the planting depth which should be 1.5ms (SP 33). Top plate 3mm thick fully welded & bottom plate 35cm*35cm, 5mm thick fully welded. | 20 | No. | 17,512.38 | ₹3,50,247.6 |
| 1.02 | Supply, installation, testing and commissioning of 11 KV Gapless Surge Arrestor,9 kV, 10 kA, LA with polymer housing, Stn. Type conforming to IEC-99-4 Capable of withstanding Maximum continuous operating voltages (M.C.O.V) | - | set | 8,538.73 | - |
| 1.03 | Supply, installation, testing and commissioning of 11 KV Horn, Gap (fuse 3-phase 200A) as per Relevant IS. | - | Set | 5,897.38 | - |
| 1.04 | Supply, installation, testing and commissioning of 11KV 200 Amperes, Triple pole switches Gang Operated (G.O. Set) conforming: IS-2544, IS: 5340 (Part-III) and SS: 9921 (Part-I -V) | - | Set | 12,322.45 | - |
| 1.05 | Supply, installation, testing and commissioning of 400 mm2 XLPE LT Cable Single Core, Un-Armoured, XLPE lnsulated Stranded Conductor FRLS type including lugs/clamps/thimbles. | - | Mtr | 965.01 | - |
| 1.06 | Supply, Fabrication and fixing of GI Channel/Angle/Flat of sizes including clamps /Collars 50x8mm | - | Kg | 153.67 | - |
| 1.07 | Supply, Installation, Testing and commissiong of 11kV Polymeric composite Pin Insulator with pins 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm | - | No. | 272.32 | - |
| 1.08 | Supply, Installation, Testing and commissiong of 11KV Disc Insulators (Polymer Type) 12 KV, 45KN Complete with fittings (Lighting Impulse 75 KV positive and 80 KV negative , creepage distance 320 mm) | - | No. | 736.45 | - |
| 1.09 | Proving and laying of Pole Earthing Complete by GI Pipe 40 mm 3mtr long through GI Strip 25x3 mm | 34 | No. | 2,272.05 | ₹77,249.7 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.36 MB
SBD15.pdf
Tender Documents • 1.10 MB
BOQ_1073820.xls
BOQ • 0.33 MB
Combineapprovedkpdcl.pdf
Other Document • 28.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .