Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹4.1 L+₹21,175.10 (5.49%)Admitted-Finance | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SRI SHUBHAM CONSTRUCTION L2 | Prasath G L1 |
|---|---|---|---|---|---|
| 1.00Providing CC Pavement in Sathiram Street (Pandiyan House to SKP Mandabam) at Minnal Village H/O Minnal Panchayat | |||||
| 2.00 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundasan | 10.26 | Cum | 133 ₹1,365 | 130.8 ₹1,342 Lowest |
| 3.00 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 18.81 | Cum | 6,000 ₹1,12,860 | 5,984.4 ₹1,12,567 Lowest |
| 4.00 | Supply and errecton of sheet centring with out scupolding including all charges etc completed. | 68.19 | Sqm | 185 ₹12,615 | 182 ₹12,411 Lowest |
| 5.00 | Cement Concrete 1:3:6 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 3.93 | Cum | 6,800 ₹26,724 | 6,741.5 ₹26,494 Lowest |
| 6.00 | Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 23.63 | Cum | 8,000 ₹1,89,040 | 7,293.5 ₹1,72,345 Lowest |
| 7.00 | Provision for Bitumen pad. | 1 | Nos | 2,000 ₹2,000 | 1,500 ₹1,500 Lowest |
| 8.00 | Providng Name board charges | 1 | Nos | 500 ₹500 Lowest | 500 ₹500 Lowest |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 62,118.72 ₹62,118.72 | 58,888.62 ₹58,888.62 Lowest |
Tender Value
₹3.9 L
EMD Value
₹3,900
Closing Date
15 Sept 2026, 3:00 pmClosed
BDO BP AKM
Panchayat Union Arakkonam
Providing for CC Pavement in Sathiran Street (Pandiyan House to SKP Mandabam) Minnal Village at Minnal Panchayat
2026_RDTN_700180_1
A2/2445/2026
Open Tender
Civil Works
Item Rate
180 days
Panchayat Union Arakkonam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3,900
Yes
29 Sept 2026
1 Sept 2026
15 Sept 2026
1 Sept 2026
15 Sept 2026
1 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing CC Pavement in Sathiram Street (Pandiyan House to SKP Mandabam) at Minnal Village H/O Minnal Panchayat | - | - | - | - |
| 2 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundasan | 10.26 | Cum | 131.89 | ₹1,353.19 |
| 3 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 18.81 | Cum | 5,985.47 | ₹1,12,586.69 |
| 4 | Supply and errecton of sheet centring with out scupolding including all charges etc completed. | 68.19 | Sqm | 182.5 | ₹12,444.68 |
| 5 | Cement Concrete 1:3:6 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 3.93 | Cum | 6,742.53 | ₹26,498.14 |
| 6 | Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 23.63 | Cum | 7,294.57 | ₹1,72,370.69 |
| 7 | Provision for Bitumen pad. | 1 | Nos | 1,500 | ₹1,500 |
| 8 | Providng Name board charges | 1 | Nos | 500 | ₹500 |
| 9 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | - | GST Amount | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.45 MB
1.pdf
Tender Documents • 0.41 MB
BOQ_841627.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .