| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
24 Sept 2021, 4:00 pmClosed
Executive Engineer PWD
Executive Engineer PWD
Construction of road from PMGSY road to Jabra via High School Bachianwalii Dachanwali Surankote by way of balance Earth work in Cutting,Cross Drainage,Walling and Providing and Laying 75mm thick WBM Grade-II in Km 1st and Km 2nd.
2021_PWDJK_136074_3
e-NIT No. 95/2021-22 dated 24-08-2021
Open Tender
Civil Works
Item Rate
90 days
Poonch
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
Executive Engineer PWD Poonch
Exempted
6 Oct 2021
25 Aug 2021
25 Sept 2021
25 Aug 2021
24 Sept 2021
25 Aug 2021
Amount
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas ( exceeding 30cm in depth, 1.5 m in width as well as 10 sqm on plan ) including disposal of excavated earth, lead up to 50m and lift upto 1.5 m, as directed by Engineer-in-Charge. Classification of soil : All kinds of Soil 50% ,Ordinary Rock = 30% & Hard rock =20% ( Requiring Blasting)
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. ( not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan,including dressing of sides and ramming of bottom lift upto 1.5m,including getting out excavate earth and disposal of surplus excavated earth as dirested: All kinds of soil .
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering . All work up to plinth level with : 1:5:10 ( 1 cement :5 coarse sand :10 graded stone aggregate 40 mm nominal size ). including all leads /lifts ,carriage, handling and re-handaling ( Complete job)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering .All work up to plinth level with : 1:3:6 with ( 1 cement : 3 coarse sand :6 graded stone aggregate 20 mm nominal size) using 20% stones. including all leads /lifts ,carriage, handling and re-handaling ( Complete job)
Providing and laying cement concrete in retaining walls, return walls,walls (any thickness) including attached pilasters, columns , piers ,abutments,pillars, posts, struts, butteresses , string or lacing courses , parapets ,coping ,bed blocks, anchor blocks , plain window sills ,fillets etc upto floor five level , including curing but excluding the cost of centring, shuttering and finishing with. 1:3:6 with ( 1 cement : 3 coarse sand :6 graded stone aggregate 20 mm nominal size) using 20% stones. including all leads /lifts ,carriage, handling and re-handaling ( Complete job)
Random rubble masonary with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12(1 cement:6 coarse sand:12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 ( 1 cement:6 coarse sand).including curing , all leads /lifts & carriages (Complete job)
Dry random rubble masonary (Nallah) with hard stone in foundation and plinth. Without bond stone. including all leads /lifts ,carriage, handling and re-handaling ( Complete job)
Dumping stone including cost of stones. On Horizontal on level. including all leads /lifts ,carriage, handling and re-handaling ( Complete job)
Centring and shuttering including strutting propping etc. and removal of form for :-
Foundations,footings, bases of columns etc for mass concrete
Walls (any thickness) including attached pilasters,buttreses,plinth and string courses etc.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth,consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Hand-packing stones in zinc coated gabions mechanically woven double twisted hexagonal in shape having wire mesh size of 100x120mm and wire dia 2.70 mm selvedge wire dia 3.4 mm & lacing wire dia 202 mm crates including supply of stones , cost of zinc coated gabions crates. including all leads /lifts ,carriage, handling and re-handaling ( Complete job)
Providing and laying non-pressure NP2 class ( light duty) 900 mm dia R.C.C H.P with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 ( 1 cement :2 fine sand ) including testing of joints ,Cost of pipes etc complete job.
Supply and filling of river bed material in layers not exceeding 20 cm in depth,rolling each layer with power road roller including carriage from source to site of work loading un-loading stacking laying watering ,dressing etc complete job .
Providing and laying WBM-GR- II 150 mm thick with broken Nallah/Crusher stone aggregate of 63 to 45mm size including screening of 13.2 mm size and using good earth as binding material sorting, spreading to template and consolidation with Power Road Roller of 8-10 Tonne capacity including carriages, octroi, sale tax, service tax all leads/lifts , carriages of material upto , loading & unloading ( Complete job)
MOHD IKHLAQ
MOHD SHABIR
Nazir Hussain
ZAFFAR AHMED
KHALIL AHMED
M/s Al Habib Builders & Construction Company
SH NEERAJ KUMAR
Mian Mohd Imran
FARHA ANJUM
Asma Jabeen
Asif Iqbal
MOHD AZIM KHAN
M/s Sehrash Rafiq
Tariq Magray
m/s magray constructions company living
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .