| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.2 LAdmitted-Finance THE CHEVISH CO OP L AND C SOCIETY LTD ALAWLA VPO ALAWLA TEHSIL ASSANDH DISTRICT KARNAL 132036 | ALAWLA | KARNAL | HARYANA | 132036 | -12.92% | ₹8.2 L | L1 | Admitted-Finance |
| 2 | L2₹9.7 LAdmitted-Finance 26 B AVTAR COLONY KARNAL 132001 | KARNAL | KARNAL | HARYANA | 132001 | +2.26% | ₹9.7 L | L2 | Admitted-Finance |
| 3 | L3₹10.4 LAdmitted-Finance 49 EMPLOYEE COLONY KHURANA ROAD KAITHAL 136027 | KAITHAL | KAITHAL | HARYANA | 136027 | +10.33% | ₹10.4 L | L3 | Admitted-Finance |
Tender Value
₹9.5 L
EMD Value
₹18,900
Closing Date
20 Aug 2026, 5:00 pmClosed
Smt Priyanka Saini
Municipal Corporation Karnal
Providing and fixing of Mild Steel Gazibo in Various Parks of Ward No. 11 and 12, M.C. Karnal. (Only for L/c societies )
2026_HRY_540700_1
2026EB476ACA 1A54 4F34 9DDB C4EB8ED85B68747ULB
Open Tender
Civil Works
Works
60 days
Karnal
2 documents required · 2 mandatory
₹1,000
₹18,900
Yes
27 Aug 2026
13 Aug 2026
21 Aug 2026
13 Aug 2026
20 Aug 2026
13 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate] | 24.91 | cum | 1,863 | ₹46,407.33 |
| 2 | [10.37.1]Providing and fixing of Kota stone slab flooring over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab, including rubbing and polishing complete with base of cement mortar 1 : 4 (1 cement : 4 coarse sand) : 1. 25 mm thick [Through Rate] | 104.52 | Sqm | 790 | ₹82,570.8 |
| 3 | [10.38]Providing and fixing of Kota stone slabs 20 mm thick in risers of steps, skirting, dado and pillars laid on 12 mm (average) thick cement mortar 1:3 (1 cement: 3 coarse sand) and jointed with grey cement slurry mixed with pigment to match the shade of the slabs, including rubbing and polishing complete. [Through Rate] | 15.7 | Sqm | 836 | ₹13,125.2 |
| 4 | [11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [Through Rate] | 15.7 | Sqm | 113 | ₹1,774.1 |
| 5 | [13.30.2]Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. 2. Hot finished seamless type tubes [Through Rate] | 4,209.8 | Kg. | 118 | ₹4,96,756.4 |
| 6 | [34.50]Painting on Steel Surfaces Providing and applying two coats of ready mix paint of approved brand on steel surface after through cleaning of surface to give an even shade [Through Rate] | 209.03 | Sqm | 60 | ₹12,541.8 |
| 7 | [4.14.1]Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil. [Through Rate] | 35.03 | cum | 83 | ₹2,907.49 |
| 8 | [6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) [Through Rate] | 11.11 | cum | 3,476 | ₹38,618.36 |
| 9 | [6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) [Through Rate] | 5.32 | cum | 4,374 | ₹23,269.68 |
| 10 | [6.30.1]Centering and shuttering including strutting, propping etc. and removal of form for 1. Foundations, footings, bases of columns, etc. for mass concrete [Through Rate] | 47.45 | Sqm | 156 | ₹7,402.2 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_620068.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].