| Sl No | Description | Qty | Unit | JAI ENGINEERING L1 |
|---|---|---|---|---|
| 1.00 | Dismantling of existing RCC structure, various equipment plinth and pole casting yard at the time of earthwork excavation removing away from site dismantling materials including cost of all T&P, labour for transport, lead, lift etc., complete and as directed by the Department Enigneer at site. | 9 | M3 | 4,000 ₹36,000 Lowest |
| 2.00 | Earthwork excavation and depositing on bank with initial lead of 10m and lift of 2m in hard stiff clay, shales, murram including cost of all labour, materials, lead, lift, etc., complete and as directed by the Department Engineer at site. | 1,114 | M3 | 150 ₹1,67,100 Lowest |
| 3.00 | Labour charges for supplying and filling of M sand including cost of filling charges, curing, labour, lead, lift, etc., complete and as directed by the Department Engineer at site. | 84 | M3 | 2,000 ₹1,68,000 Lowest |
| 4.00 | Labour charges for laying PCC 1:3:6 using 40mm HBG metal for foundation matt concrete including cost of all labour, materials, lead, lift, etc., complete and as directed by the Department Engineer at site. | 84 | M3 | 7,000 ₹5,88,000 Lowest |
| 5.00 | Labour charges for laying RCC 1:1.5:3 using 12-20mm HBG metal for foundation raft concrete including cost of all labour, materials, lead, lift, etc., complete and as directed by the Department Engineer at site. With out form work | 168 | M3 | 13,000 ₹21,84,000 Lowest |
| 6.00 | Labour charges for laying RCC 1:1.5:3 using 12-20mm HBG metal for wall concrete including cost of all labour, materials, lead, lift, etc., complete and as directed by the Department Engineer at site. With form work | 282 | M3 | 24,000 ₹67,68,000 Lowest |
| 7.00 | Labour charges for laying RCC 1:1.5:3 using 12-20mm HBG metal for salb concrete including cost of all labour, materials, lead, lift, etc., complete and as directed by the Department Engineer at site. With form work | 56 | M3 | 21,000 ₹11,76,000 Lowest |
| 8.00 | Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binidng wire , etc., complete and as directed by the Department Engineer at site. | 46 | MT | 65,000 ₹29,90,000 Lowest |
| 9.00 | Supplying, fabricating in GI angles/flats incuding cost of MS angle, flats, as per drawing and specification and galvanising placing in position including cost of all materials, galvanizing charges, transportation, labour, lead, lift, etc., complete and as directed by the Department Engineer at site. | 8,547 | kgs | 60 ₹5,12,820 Lowest |
| 10.00 | Plastering with CM 1:5-12mm thick for concrete works including cost of all materials lead lift etc complete. and as directed by the Department Engineer at site. | 1,612 | M2 | 350 ₹5,64,200 Lowest |
Tender Value
₹1.7 Cr
EMD Value
₹1.6 L
Closing Date
8 Jul 2025, 2:30 pmClosed
CE/TP-I/CNI
Guindy 230kV GIS SS campus 3rd floor, Guindy, Chennai
Providing 33kV 11kV interlinking RCC cable duct at proposed Avadi 230 110kV SS
2025_EB_574237_1
TP1-20/2025-26 OF CE/TP-I/CNI
Open Tender
Civil Works
Works
120 days
Avadi
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.6 L
11 Dec 2025
26 Jun 2025
9 Jul 2025
26 Jun 2025
8 Jul 2025
26 Jun 2025
Amount
Dismantling of existing RCC structure, various equipment plinth and pole casting yard at the time of earthwork excavation removing away from site dismantling materials including cost of all T&P, labour for transport, lead, lift etc., complete and as directed by the Department Enigneer at site.
Earthwork excavation and depositing on bank with initial lead of 10m and lift of 2m in hard stiff clay, shales, murram including cost of all labour, materials, lead, lift, etc., complete and as directed by the Department Engineer at site.
Labour charges for supplying and filling of M sand including cost of filling charges, curing, labour, lead, lift, etc., complete and as directed by the Department Engineer at site.
Labour charges for laying PCC 1:3:6 using 40mm HBG metal for foundation matt concrete including cost of all labour, materials, lead, lift, etc., complete and as directed by the Department Engineer at site.
Labour charges for laying RCC 1:1.5:3 using 12-20mm HBG metal for foundation raft concrete including cost of all labour, materials, lead, lift, etc., complete and as directed by the Department Engineer at site. With out form work
Labour charges for laying RCC 1:1.5:3 using 12-20mm HBG metal for wall concrete including cost of all labour, materials, lead, lift, etc., complete and as directed by the Department Engineer at site. With form work
Labour charges for laying RCC 1:1.5:3 using 12-20mm HBG metal for salb concrete including cost of all labour, materials, lead, lift, etc., complete and as directed by the Department Engineer at site. With form work
Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binidng wire , etc., complete and as directed by the Department Engineer at site.
Supplying, fabricating in GI angles/flats incuding cost of MS angle, flats, as per drawing and specification and galvanising placing in position including cost of all materials, galvanizing charges, transportation, labour, lead, lift, etc., complete and as directed by the Department Engineer at site.
Plastering with CM 1:5-12mm thick for concrete works including cost of all materials lead lift etc complete. and as directed by the Department Engineer at site.
Colour washing two coats using white cement mixed with approved asian exterior emulsion paint or asian oil paints including cost of all materials, labour, lead, lift, etc. complete. and as directed by the Department Engineer at site.
Backing filling the excavation earth completing with standard specification for filling, watering and compaction in layers for filling in foundation including cost of labour, lead, lift, etc, complete. and as directed by the Department Engineer at site.
Removal of surplus earth from the site and putting in to low lying area inside the yard.including cost of all materials lead lift etc complete. and as directed by the Department Engineer at site.
CGST in % (For Bidders inside TamilNadu)
SGST in % (For Bidders inside TamilNadu)
IGST in % (For Bidders outside TamilNadu)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .