| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.6 LAccepted-AOC R O RIHAAN VILLA SHAKTI VIHAR PANTHAGHATI SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | ₹26.6 L Quoted ₹31.6 L | L1 | Accepted-AOC The rates quoted by the contractor are lowest, hence accepted |
| 2 | L2₹31.6 LRejected-Finance R O VILLAGE KALYANA P O KANLOG TEHSIL DISTT SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | ₹31.6 L | L2 | Rejected-Finance The rates quoted by the contractor are on the higher side, hence rejected. |
| 3 | L3₹31.6 LRejected-Finance HIMACHAL PRADESH | SOLAN | HIMACHAL PRADESH | 171102 | ₹31.6 L | L3 | Rejected-Finance The rates quoted by the contractor are on the higher side, hence rejected. |
| Sl No | Description | Qty | Unit | Devinder Thakur L3 | ABHISHEK THAKUR L2 | Bhagat Singh Thakur L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material. Hard Roack blasting prohibited and their intermediate classification of soils including, dewatering wherever required, setting of to the required lines, levels as shown on the drawing and directed by the Engineer -in-charge at site, according to the HP.PWD. specification of 1990 (one thousand nine hundred ninety) volume-I (one) and sorting out useful and unuseful material and transportation of the unuseful material for disposing at approved dumping site Bharyal. including head load, animal load or mechanical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour (if required).All useful material such as stones, shingles aggregate and slates shall be properly stacked at site to the maximum possible extent in all leads and lifts through all modes of transportation the usefull stones as per the direction of the Engineer-in-Charge. Any loss to the public and private propriety during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges. | 432 | P.Cum | 985 ₹4.3 L | 982 ₹4.2 L | 980 ₹4.2 L |
| 2.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand): 10 graded stone aggregate 40 mm nominal size) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 89.64 | P.cum | 5,755 ₹5.2 L | 5,752 ₹5.2 L | 5,750 ₹5.2 L |
| 3.00 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 107.64 | P.Cum | 7,800 ₹8.4 L | 7,800 ₹8.4 L | 7,800 ₹8.4 L |
| 4.00 | Centering and shuttering including strutting, propping etc. and removal of form work for : Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 468 | P.sqm | 482 ₹2.3 L | 481 ₹2.3 L | 480 ₹2.2 L |
| 5.00 | Providing and Laying R.C.C half round pipe including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 180 | P.Cum | 600 ₹1.1 L | 600 ₹1.1 L | 600 ₹1.1 L |
| 6.00 | Removal of slips in all kinds of soil (including saturated soil but excluding boulders and rocky portion requiring blasting upto a distance of 20 metres dosposing of un-serviceable materials, stacking serviceable materials and neatly dressing the surface including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 488.25 | P.cum | 380 ₹1.9 L | 380 ₹1.9 L | 380 ₹1.9 L |
| 7.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Mild steel and Medium Tensile steel bars including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 3,229.2 | P.Kg | 98 ₹3.2 L | 98 ₹3.2 L | 98 ₹3.2 L |
| 8.00 | Carriage of material by mechanical transport including Loading & unloading & stacking of Muck/Debries in approved M.C. Dumping site at bharyal (10 km) inc carriage of material in all leads and lift and others incidentail as per direction of Engineer-in-Charge | 920.25 | P.cum | 590 ₹5.4 L | 590 ₹5.4 L | 590 ₹5.4 L |
Tender Value
₹27.4 L
EMD Value
₹54,800
Closing Date
28 Feb 2026, 5:00 pmClosed
Executive Engineer RB MC Shimla
Executive Engineer RB MC Shimla
Construction of Nallah leading to Talland via UD Office from Mall Road in ward No 34 Kanlog RD 00 to 0180
2026_MC_129039_2
357dated16022026
Open Tender
Civil Works
180 days
MC Shimla
Please refer to tender documents
7 documents required · 7 mandatory
₹1,770
Executive Engineer RB MC Shimla
₹54,800
16 May 2026
19 Feb 2026
2 Mar 2026
19 Feb 2026
28 Feb 2026
19 Feb 2026
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material. Hard Roack blasting prohibited and their intermediate classification of soils including, dewatering wherever required, setting of to the required lines, levels as shown on the drawing and directed by the Engineer -in-charge at site, according to the HP.PWD. specification of 1990 (one thousand nine hundred ninety) volume-I (one) and sorting out useful and unuseful material and transportation of the unuseful material for disposing at approved dumping site Bharyal. including head load, animal load or mechanical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour (if required).All useful material such as stones, shingles aggregate and slates shall be properly stacked at site to the maximum possible extent in all leads and lifts through all modes of transportation the usefull stones as per the direction of the Engineer-in-Charge. Any loss to the public and private propriety during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand): 10 graded stone aggregate 40 mm nominal size) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge.
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge.
Centering and shuttering including strutting, propping etc. and removal of form work for : Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge.
Providing and Laying R.C.C half round pipe including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge.
Removal of slips in all kinds of soil (including saturated soil but excluding boulders and rocky portion requiring blasting upto a distance of 20 metres dosposing of un-serviceable materials, stacking serviceable materials and neatly dressing the surface including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Mild steel and Medium Tensile steel bars including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge.
Carriage of material by mechanical transport including Loading & unloading & stacking of Muck/Debries in approved M.C. Dumping site at bharyal (10 km) inc carriage of material in all leads and lift and others incidentail as per direction of Engineer-in-Charge
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.72 MB
Tendernotice_2.pdf
PDF • 0.70 MB
Tendernotice_3.pdf
PDF • 0.35 MB
BOQ_190777.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid