Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.7 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹6.2 L+₹44,100.05 (7.67%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹8.2 L+₹2.5 L (42.6%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
6 Jul 2026, 6:00 pmClosed
Er. Raman Kumar (Xen PWD Chenani)
PWD OFFICE CHENANI
Refer to BOQ
2026_PWDJK_313869_3
e-NIT No. 21 of 2026-27 Dated 27-06-2026
Open Tender
Civil Works
Percentage
30 days
Chenani
Refer to e-NIT/SBD
2 documents required · 2 mandatory
₹600
XEN PWD CHENANI
₹20,000
10 Jul 2026
27 Jun 2026
7 Jul 2026
27 Jun 2026
6 Jul 2026
27 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 105 | cum | 256.85 | ₹26,969.25 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 3.6 | cum | 5,202.9 | ₹18,730.44 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:
1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 11.47 | cum | 4,826.5 | ₹55,359.96 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:
1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 44.41 | cum | 5,733.6 | ₹2,54,629.18 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 250.8 | sqm | 286.35 | ₹71,816.58 |
| 6 | 12mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 coarse sand) | 137 | sqm | 266.2 | ₹36,469.4 |
| 7 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 50 mm thick with 20mm nominal size stone aggregate. | 148.8 | sqm | 562.15 | ₹83,647.92 |
| 8 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with. 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | 15.2 | cum | 7,504.6 | ₹1,14,069.92 |
| 9 | Dry random rubble masonry with hard stone in foundation and plinth: Nallah | 43.56 | cum | 3,262.1 | ₹1,42,097.08 |
| 10 | Dumping of stones filling behind R/Wall including supply of stone in horizontal on level. | 24 | cum | 937.9 | ₹22,509.6 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
BOQ_1015982.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .