| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.0 CrAdmitted-Finance | ₹6.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹6.2 Cr+₹16.2 L (2.69%)Admitted-Finance | ₹6.2 Cr+₹16.2 L (2.69%) | L2 | Admitted-Finance |
| 3 | L3₹6.3 Cr+₹25.0 L (4.15%)Admitted-Finance | ₹6.3 Cr+₹25.0 L (4.15%) | L3 | Admitted-Finance |
| 4 | L4₹6.3 Cr+₹26.3 L (4.35%)Admitted-Finance | ₹6.3 Cr+₹26.3 L (4.35%) | L4 | Admitted-Finance |
| 5 | L5₹6.4 Cr+₹36.2 L (5.99%)Admitted-Finance | ₹6.4 Cr+₹36.2 L (5.99%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | tarmac road and roof builders L11 | M.N.Enterprises L7 | M/S MIR HILAL CONSTRUCTIONS L3 | M/S GHULAM NABI PARAY L6 | HAJI GHULAM RASOOL SHEIKH AND SONS L9 | ESS ESS Enterprises Electronics L8 | M/S MOHD ASHRAF GAMIE L5 | M/S AL-MAIRAJ CONSTRUCTIONS L10 | M/S NASEER AHMAD BHAT L2 | Ghulam Mohammad Bhat L1 | MOHAMMAD AYOUB NAIK L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve including all carriages complete job. | ||||||||||||||
| 1.10 | All works upto plinth level | 110 | Cum | 6,500 ₹7,15,000 | 7,400 ₹8,14,000 | 7,000 ₹7,70,000 | 7,000 ₹7,70,000 | 8,000 ₹8,80,000 | 5,000 ₹5,50,000 | 7,000 ₹7,70,000 | 8,100 ₹8,91,000 | 6,800 ₹7,48,000 | 9 ₹990 Lowest | 7,911 ₹8,70,210 |
| 1.20 | All works above plinth level | 1,560 | Cum | 9,000 ₹1,40,40,000 | 7,400 ₹1,15,44,000 | 8,375 ₹1,30,65,000 | 7,100 ₹1,10,76,000 Lowest | 7,900 ₹1,23,24,000 | 7,700 ₹1,20,12,000 | 8,000 ₹1,24,80,000 | 8,100 ₹1,26,36,000 | 7,900 ₹1,23,24,000 | 7,900 ₹1,23,24,000 | 8,767 ₹1,36,76,520 |
| 2.00Centering and shuttering including strutting, propping etc. and removal of form for : | ||||||||||||||
| 2.10 | Foundations, footings, bases of columns, etc. for mass concrete | 25 | Sqm | 250 ₹6,250 | 250 ₹6,250 | 10 ₹250 | 300 ₹7,500 | 300 ₹7,500 | 200 ₹5,000 | 450 ₹11,250 | 200 ₹5,000 | 175 ₹4,375 | 0.9 ₹22.5 Lowest | 200 ₹5,000 |
| 2.20 | Walls (any thickness) including attached plinth and string courses etc.pilasters, butteresses, | 125 | Sqm | 400 ₹50,000 | 250 ₹31,250 | 50 ₹6,250 | 400 ₹50,000 | 300 ₹37,500 | 400 ₹50,000 | 450 ₹56,250 | 200 ₹25,000 | 200 ₹25,000 | 0.9 ₹112.5 Lowest | 200 ₹25,000 |
| 2.30 | Suspended floors, roofs, landings, balconies and access platform | 5,940 | Sqm | 400 ₹23,76,000 | 250 ₹14,85,000 | 150 ₹8,91,000 | 300 ₹17,82,000 | 300 ₹17,82,000 | 300 ₹17,82,000 | 450 ₹26,73,000 | 350 ₹20,79,000 | 235 ₹13,95,900 | 149 ₹8,85,060 Lowest | 200 ₹11,88,000 |
| 2.40 | Lintels, beams, plinth beams, girders, bressumers and cantilevers | 5,810 | Sqm | 400 ₹23,24,000 | 250 ₹14,52,500 | 150 ₹8,71,500 | 350 ₹20,33,500 | 300 ₹17,43,000 | 300 ₹17,43,000 | 450 ₹26,14,500 | 350 ₹20,33,500 | 235 ₹13,65,350 | 149 ₹8,65,690 Lowest | 200 ₹11,62,000 |
| 2.50 | Columns, Pillars, Piers, Abutments, Posts and Struts | 3,170 | Sqm | 400 ₹12,68,000 | 250 ₹7,92,500 | 125 ₹3,96,250 Lowest | 400 ₹12,68,000 | 300 ₹9,51,000 | 300 ₹9,51,000 | 450 ₹14,26,500 | 350 ₹11,09,500 | 285 ₹9,03,450 | 149 ₹4,72,330 | 200 ₹6,34,000 |
| 2.60 | Stairs, (excluding landings) except spiral-staircases | 280 | Sqm | 400 ₹1,12,000 | 250 ₹70,000 | 10 ₹2,800 Lowest | 450 ₹1,26,000 | 300 ₹84,000 | 400 ₹1,12,000 | 450 ₹1,26,000 | 350 ₹98,000 | 375 ₹1,05,000 | 149 ₹41,720 | 200 ₹56,000 |
Tender Value
₹7.4 Cr
Closing Date
16 Jun 2021, 6:00 pmClosed
DGM Housing Board Unit-I Srinagar
Office of the Deputy General Manager Housing Board Unit-I, Barbar Shah, Srinagar
Construction Of District Court Complex Kulgam ( Main Court Building Super Structure Above Plinth Level ).
2021_HAUDD_125288_1
e-NIT NO 08 OF 2021-22 DATED 24/05/2021
Open Tender
Civil Works
Item Rate
200 days
Kulgam
Please refer Tender documents.
2 documents required · 2 mandatory
₹15,000
Credited in A/c 0361040500004285 (JAKA0RAWWAL)
Exempted
24 Sept 2021
27 May 2021
17 Jun 2021
27 May 2021
16 Jun 2021
27 May 2021
Amount
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve including all carriages complete job.
All works upto plinth level
All works above plinth level
Centering and shuttering including strutting, propping etc. and removal of form for :
Foundations, footings, bases of columns, etc. for mass concrete
Walls (any thickness) including attached plinth and string courses etc.pilasters, butteresses,
Suspended floors, roofs, landings, balconies and access platform
Lintels, beams, plinth beams, girders, bressumers and cantilevers
Columns, Pillars, Piers, Abutments, Posts and Struts
Stairs, (excluding landings) except spiral-staircases
Edges of slab and breaks in floors and walls under 20 cm wide
Steel reinforcement for R.C.C. for Footing, Columns , Beams, Slabs etc including straightening, cutting, bending, placing in position and binding all complete including welding etc of grade FE-500 D including carriages.
Thermo-Mechanically Treated bars
Structural steel work welded in built up section trusses and framed work including cutting hoisting, fixing in position anchor bolts and applying a primer coat of approved steel primer.including carriages.
Providing and fixing plain eves boarding (300mm x 40mm ) first class kal wood fixed with screws etc, including all carraiges .All job completed
P/F of 20 mm thick T&G well planned planks for roof soffits & Ceiling on wood work in false ceiling, partitions sawn and put up in position of Budloo wood (Ceiling Joists) including cost of necessary adhesive & cost of nails etc. with necessary cornice of required size complete job. all complete as approved by Engineer-in-charge (including cost of all material, leads, lifts and carriages etc upto site of work complete). (soffits of Ist Class Kail Wood).as per the directions of Consultant/as per the drawings enclosed
Providing ridges or hips of width 60cm overall width plain G.S. sheets fixed with polymer coated J. or L hooks, bolts and nuts 8mm dia G. I. limpet and bitumen washers complete.0.63mm thick with zinc coating not less than 275gm/m2
Providing valleys of 90cm wide overall in plains G.S. sheets fixed with polymer coated J. or L. hooks, bolts and nuts 8 mm dia G I. limpet and bitumen washers complete.1.60mm thick with zinc coating not less than 350gm/m2
Providing and fixing Track deck CRILL make or equivalent H.I. rib profiled sheets 1000 to 1020 mm cover width 28-35 mm high crests at 250 to 255 mm T.C.T(total coated thickness) high tensile S.M.P Galvalume steel. The sheets shall have wide panes with 3 no stiffing ribs,
Brick work with common burnt clay F.P.S (non modular) bricks of class designation 75 in superstructure above plinth level upto floor V level in all shapes and sizes in :(Cement mortar 1 :6 (1 cement : 6 coarse sand)including carraiges
Half brick masonary with common burnt clay F.P.S ( non modular) brick of class designation 75 in superstructure above plinth level upto floor V level: 1:4(1 cement 4 coarse sand including carriages
P/F of following size of medium class PVC Conduits along with accessories in surface/recess including cutting the wall and making good the same as per requriment.
25mm diameter
40mm diameter
Supply of M.S fan boxes of Heavy duty of approved quality.
Supply and fixing of M.S Junction boxes of Heavy duty of approved quality.
M/S NASEER AHMAD BHAT
M/S MIR HILAL CONSTRUCTIONS
MOHAMMAD AYOUB NAIK
M/S MOHD ASHRAF GAMIE
M/S GHULAM NABI PARAY
M.N.Enterprises
ESS ESS Enterprises Electronics
HAJI GHULAM RASOOL SHEIKH AND SONS
M/S AL-MAIRAJ CONSTRUCTIONS
tarmac road and roof builders
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
Tendernotice_2.pdf
PDF • 2.03 MB
BOQ_245523.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .