Tender ID
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.5 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹12.7 L+₹14,079.91 (1.12%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹13.4 L+₹84,479.45 (6.74%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹28,000
Closing Date
10 Mar 2026, 10:00 amClosed
PRINCIPAL
NUNWAN PAHALGAM
as per tender document
2026_Tourm_304831_1
construction of lavatory block at jim sonamarg
Open Tender
Civil Works
Percentage
30 days
Sonamarg
as per tender document
2 documents required · 2 mandatory
₹1,000
Principal JIM AND WS
₹28,000
12 Mar 2026
28 Feb 2026
10 Mar 2026
28 Feb 2026
10 Mar 2026
1 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All kinds of soil | 55.15 | CUM | 496 | ₹27,354.4 |
| 2 | P/L dry Stone Soling duly hand packed & consolidated with hand rammers incl .all carriages and head load complete Job | 4.75 | CUM | 3,279 | ₹15,575.25 |
| 3 | Providing and laying in position cement concrete of 1:2:4 ratio excl cost of centering shuttering and carraige all work in foundation using coarse sand and 20 mm nominal size aggregates including carriage of materials and head load complete job. | 10.57 | CUM | 8,474 | ₹89,570.18 |
| 4 | Providing and laying in position Reinforced cement concrete in 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size) crushed. | 2.96 | CUM | 9,712 | ₹28,747.52 |
| 1900-01-04T00:00:00Z | Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete. Thermo mechanically treated bars | 325.56 | KG | 129 | ₹41,997.24 |
| 6 | Centering and shuttering i/c strutting propping etc and removal of formwork complete job | 44.8 | SQM | 296 | ₹13,260.8 |
| 7 | Brick work class designation 75 in foundation and plinth in cement mortar 1:4 ( 1 cement: 4 coarse sand) including carriage of all materials complete job. | 7.43 | CUM | 9,828 | ₹73,022.04 |
| 8 | Dry random rubble masonry with hard stone Mixed in foundation and plinth | 17.93 | CUM | 5,728 | ₹1,02,703.04 |
| 9 | 12 mm thick cement plaster of 1:6 mix ( 1 cement: 6 coarse sand) on walls. | 42.94 | SQM | 275 | ₹11,808.5 |
| 10 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 50 mm thick. | 8.92 | CUM | 582 | ₹5,191.44 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
BOQ_990193.xls
BOQ • 0.37 MB
date.pdf
PDF • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .