| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9.7 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹10.0 L+₹33,991.55 (3.51%)Admitted-Finance V P O SANGHOLE TEH JAISINGHPUR DISTT KANGRA H P | MANDI | HIMACHAL PRADESH | 175013 | L2 | Admitted-Finance | ||
| 3 | L3₹10.6 L+₹92,021.40 (9.51%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹12.3 L+₹2.6 L (27.4%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹12.8 L+₹3.1 L (32.1%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹15.4 L
EMD Value
₹30,720
Closing Date
2 Sept 2026, 6:00 pmClosed
Executive Engineer PWD RandB PROJECT DIVISION III
Office of the PWD RandB PROJECT DIVISION III JAMMU
Upgradation of Govt. Qtr no 77-M, 93-P, 73-M and 37- G at Poonch House Talab Tillo, Jammu. CNo- 134 P
2026_PWDJK_322523_2
Short e-NIT No. 46 of 2026-2027 Dated 27-08-2026
Open Tender
Civil Works
Percentage
60 days
JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer PWD RandB PROJECT DIVISION III
₹30,720
Office of the PWD RandB PROJECT DIVISION III JAMMU
25 Sept 2026
27 Aug 2026
3 Sept 2026
27 Aug 2026
2 Sept 2026
27 Aug 2026
31 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 15.2.1 | 8.7 | cum | 1,725.2 | ₹15,009.24 |
| 2 | Dismantling old plaster or skirting, raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 meters lead. 15.56 | 109.58 | sqm | 38.9 | ₹4,262.66 |
| 3 | Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge. 15.3 | 0.36 | cum | 2,516.85 | ₹906.07 |
| 4 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with. 1:5:10 (1 cement : 5 coarse sand : 10 graded brick aggregate 40 mm nominal size 4.5.8 | 8.7 | cum | 4,469.25 | ₹38,882.48 |
| 5 | CERAMIC GLAZED TILES Providing and fixing Ist quality ceramic glazed wall tiles conforming to IS : 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer- in-Charge, in skirting, risers of steps and dados over 12 mm thick bed of cement mortar 1:3 ( 1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3 kg per sqm, including pointing in white cement mixed with pigment of matching shade complete. 8.31 | 109.58 | sqm | 1,229.1 | ₹1,34,684.78 |
| 6 | Providing and fixing gang saw cut, mirror polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and similar locations, of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 (1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels (Area of slab over 0.5 sqm) 8.2.2.2.2 | 4.37 | sqm | 2,994.6 | ₹13,086.4 |
| 7 | P/F of 19mm thick ply including Cutting Wastage fevicole, Carriage, etc Complete itom of superior make ( Green Century, Amulya & Archid) Conforming BWP 710 LMR | 704 | sft | 200 | ₹1,40,800 |
| 8 | P/F of 6mm thick ply including Cutting Wastage fevicole, Carriage, etc Complete itom of superior make ( Green Century, Amulya & Archid) Conforming BWP 710 LMR | 192 | sft | 85 | ₹16,320 |
| 9 | P/F of 1mm thick Sunmica including Cutting Wastage fevicole, nail etc Complete itom of superior make ( Green, Amulya & Vigro) LMR | 256 | sft | 100 | ₹25,600 |
| 10 | P/F of 0.85mm thick Sunmica including Cutting Wastage fevicole, nail etc Complete itom of superior make ( Green, Amulya & Vigro) LMR | 896 | sft | 85 | ₹76,160 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.75 MB
BOQ_1082138.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .