Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹61.7 LAccepted-AOC | ₹61.7 L | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹62.9 L+₹1.2 L (2.00%)Rejected-Finance | ₹62.9 L+₹1.2 L (2.00%) | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹63.2 L+₹1.5 L (2.50%)Rejected-Finance | ₹63.2 L+₹1.5 L (2.50%) | L-3 | Rejected-Finance L-3 |
| 4 | L-4₹63.5 L+₹1.9 L (3.00%)Rejected-Finance | ₹63.5 L+₹1.9 L (3.00%) | L-4 | Rejected-Finance L-4 |
| 5 | L-5₹63.8 L+₹2.2 L (3.50%)Rejected-Finance | ₹63.8 L+₹2.2 L (3.50%) | L-5 | Rejected-Finance L-5 |
Tender Value
Refer Docs
EMD Value
₹1.3 L
Closing Date
11 Feb 2022, 3:00 pmClosed
PROJECT DIRECTOR PATNA
Sone Bhawan, D P Rai Path Patna-01
Balance utility shifting such as 11KV, LT line and transformer etc. infringing in the alignment of Punpun arm of ROB in lieu of LC-79A and LC-1SPL at Mithapur, Patna, Bihar
2022_IRCON_104548_1
IRCON/2034/E-TENDER/2022/01
Limited
Civil Works
Works
60 days
PATNA
Refer tender document
5 documents required · 5 mandatory
₹10,000
IRCON INTERNATIONAL LIMITED
₹1.3 L
19 May 2022
4 Feb 2022
12 Feb 2022
4 Feb 2022
11 Feb 2022
6 Feb 2022
5 Feb 2022 - 5 Feb 2022
Government eProcurement System Created By: S P Jaiswal Created Date/Time: 12-Feb-2022 03:39 PM Tender Title: Balance utility shifting such as 11KV, LT line and transformer etc. infringing in the alignment of Punpun arm of ROB in lieu of LC-79A and LC-1SPL at Mithapur, Patna, Bihar Tender ID: 2022_IRCON_104548_1
Tender Inviting Authority: Project Director, IRCON INTERNATIONAL LIMITED, 1st Floor, Sone Bhawan, Daroga Prasad Rai Path, Patna – 800001
Name of Work: Balance utility shifting such as 11KV, LT line and transformer etc. infringing in the alignment of Punpun arm of ROB in lieu of LC-79A & LC-1SPL at Mithapur, Patna (Bihar).
Contract No: IRCON/2034/ROB-BIHAR/E-TENDER/2022/01 Dated 04.02.2022
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 M AND R CONSTRUCTION(GSTN-NA) 6168512.00 0.00 6168512.00 Sixty One Lakh Sixty Eight Thousand Five Hundred and Tweleve
2.00 MAHESH SHARMA(GSTN-NA) 6168512.00 2.50 6322724.80 Sixty Three Lakh Twenty Two Thousand Seven Hundred and Twenty Four
3.00 N K ENTERPRISES(GSTN-NA) 6168512.00 3.50 6384409.92 Sixty Three Lakh Eighty Four Thousand Four Hundred and Nine
4.00 VISHAL CONSTRUCTION(GSTN-NA) 6168512.00 3.00 6353567.36 Sixty Three Lakh Fifty Three Thousand Five Hundred and Sixty Seven
5.00 KEDAR CONSTRUCTION(GSTN-NA) 6168512.00 2.00 6291882.24 Sixty Two Lakh Ninty One Thousand Eight Hundred and Eighty Two
Lowest Amount Quoted BY: M AND R CONSTRUCTION(6168512.00)
BOQ Summary Details Tender Title: Balance utility shifting such as 11KV, LT line and transformer etc. infringing in the alignment of Punpun arm of ROB in lieu of LC-79A and LC-1SPL at Mithapur, Patna, Bihar Tender ID: 2022_IRCON_104548_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 M AND R CONSTRUCTION 6168512.00 L1
2 KEDAR CONSTRUCTION 6291882.24 L2
3 MAHESH SHARMA 6322724.80 L3
4 VISHAL CONSTRUCTION 6353567.36 L4
5 N K ENTERPRISES 6384409.92 L5
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .