| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹94,270Accepted-AOC | L-1 | Accepted-AOC L-1 Bidder | |
| 2 | L-2₹1.5 L+₹54,835 (58.2%)Rejected-Finance | L-2 | Rejected-Finance L-2 Bidder | |
| 3 | L-3₹1.5 L+₹55,196 (58.6%)Rejected-Finance | L-3 | Rejected-Finance L-3 Bidder | |
| 4 | L-4₹1.5 L+₹55,433 (58.8%)Rejected-Finance | L-4 | Rejected-Finance L-4 Bidder |
Tender Value
₹1.5 L
EMD Value
₹1,500
Closing Date
9 Jun 2020, 12:00 pmClosed
SE, ETC, Varanasi
Bhikaripur, DLW, Varanasi
220 KV, 132 KV AND 33 KV MAIN BUS SPLITTING
2020_UPTCL_447025_1
Short Term e-tender no. 197/2019-20/ETC/VNS
Open Tender
Electrical Works
Item Wise
5 days
220 KV Substation Gajokhar
Fee/EMD/PAN/GST Registration and experience for execution of work as per specification
2 documents required · 2 mandatory
₹177
SE, ETC, Varanasi
₹1,500
16 Feb 2021
11 Mar 2020
10 Jun 2020
11 Mar 2020
9 Jun 2020
12 Mar 2020
Amount
Erection of Auxiliary Structures (BCT-03 Nos., CBTA-01 set ,BBL-02 sets, ABL-01 sets ) as per drawing using proper size Nuts/Bolts/Washers(Which will be Provided by UPPTCL) including shifting of structure/equipments from storage place to erection site with all other associated works for satisfactory completion of the job including the cost of men, misc consumables and T&P required for the Job.
Shifting from store to erection site and Erection of 220 KV Bus Section Isolator on already erected Structure and alignment of the same for the smooth operation.
Shfting from store to erection site and Erection of 132 KV Bus Section Isolator on already erected Structure and alignment of the same for the smooth operation.
Shifting from store to erection site and Erection of 33 KV Bus Section Isolator on already erected Structure and alignment of the same for the smooth operation.
Jumpering of different rating Section Isolators with the respective 220,132 &33 KV Bus bar and 220 kV CVT with bus bar by moose conductor with all associated work required for the satisfactory completion of work including the cost of men, misc consumables and T&P required for the Job.(1 Job for each Jumpering)
Shifting from store to erection site and Erection of 220 KV CVT/PT (R,Y& B Phase) on already erected BCT Structure and CVT Junction BOX.
Connection of 220 kV CVT for metering and protection circuit of 220/132 KV 160 MVA Transformer-II control panel and protection panel by the way of Laying New Cable and ferruling, glanding, termination of New Cable with all the Cost of Men, Misc Consumables(including ferrules, gland, lugs etc) and T&P required for the Job.
Cutting Straightening laying of 700 mm below inside ground and above ground of M.S. flat of Size 50x6 mm (MS flat Cost included) and as per requirement for earthing of auxiliary structure, equipments and cable trenches including welding, painting etc. with all other associated works for satisfactory completion of the job
IRA ENTERPRISES
M/S P B ENTERPRISES
M/S Jay Enterprises
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .