Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹3.1 L+₹14,244.05 (4.82%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹3,100
Closing Date
27 Aug 2024, 2:00 pmClosed
Chief Engineer TTPS TTN 4
Office of the SE Civil TTPS TTN 4
Repair and Maintenance of flood damaged compound wall from 26 to 50 m opposite to Type 4 Quarters Block No.3 at Thermal Nagar
2024_EB_471262_1
CE SE C TTPS Spec. No 166 24 25
Open Tender
Civil Works - Others
Item Rate
30 days
TTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3,100
Yes
9 Nov 2024
8 Aug 2024
28 Aug 2024
8 Aug 2024
27 Aug 2024
8 Aug 2024
Providing two legged scaffolding using 10 to 13cm dia casurina posts of best quality,the distance between the two rows being 1.25m and the spacing of posts being 2m in both the rows with horizontal posts with 0.5m overlap on either side and braces at 2m,c/c including longitudinal and transverse middle braces to step up and providing a platform with country wood planks of 40mm thick and 1m width,etc.,in a complete form using coir and nails including cost of all materials, lead, lift, etc., complete.
Providing RCC 1:1.5:3 using OP/PP cement with 12 to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete - excluding cost of reinforcement and form work.
Supplying and providing RTS reinforcement including cost ofall materials, labour, lead, lift, etc., complete.
Providing centering and shuttering arrangement for supporting the R.C.C.sunshade,slab, columns etc.,including cost of all materials, labour, lead, lift, etc., complete.
R.R.Masonry in C.M.1:5 including cost of all materials, labours, lead, lift, curing, etc. complete. (Rough stone 25% available at Camp-I will be supplied by Department)
Collection and insertion of glass pieces over the top surface of compound wall for safety purpose including cost of glass pieces,labour,lead,lift,etc., complete.
Pointing with C.M 1:3 to RR Masonry, including cost of all materials, labours, lead, lift, curing, etc. complete.
Hollow block masonry using hollow block of size (16'' x 8'' x8'') in CM 1:5 including cost of all materials, labours, lead, lift, curing, etc. complete.
Engaging a JCB for using in transporting purpose of old roughstone and leveling the near compound wall at Camp-I area rate including hire charges of JCB, labour, T&P, etc., complete.
Providing Brick work in CM 1:5 using the Fly Ash Bricks including cost of all materials, labour, lead, lift, curing, etc. complete.
Plastering with CM 1:5, 12mm thick for wall surface including cost of all materials, labour lead and lift etc., complete.
MAHARASI ENTERPRISES (BID ID -1117295)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .