Tender Value
₹5.9 L
EMD Value
₹11,820
Closing Date
3 Sept 2026, 12:00 pm6d left
Er. Shamis Din
Executive Engineer PWD RNB Division Kishtwar
Please Refer BOQ
2026_PWDJK_321877_3
e-NIT No. 52 of 2026-27 Dated 22-08-2026
Open Tender
Civil Works
Percentage
30 days
KISHTWAR
Please Refer NIT
2 documents required · 2 mandatory
₹600
Executive Engineer PWD RNB Division Kishtwar
₹11,820
22 Aug 2026
22 Aug 2026
3 Sept 2026
22 Aug 2026
3 Sept 2026
22 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 33 | cum | 256.85 | ₹8,476.05 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 0.6 | cum | 5,202.9 | ₹3,121.74 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 31 | cum | 5,733.6 | ₹1,77,741.6 |
| 4 | Dry random rubble masonry with hard stone in foundation and plinth:
With bond stone. Labour Rate | 4 | cum | 1,988.8 | ₹7,955.2 |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with
5.3.1 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 0.7 | cum | 9,821.85 | ₹6,875.3 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 30 | sqm | 286.35 | ₹8,590.5 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for: Walls (any thickness) including attached pilasters, buttresses, plinth and
string courses etc. | 52.5 | sqm | 628.95 | ₹33,019.88 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platforms. | 6.3 | sqm | 718.2 | ₹4,524.66 |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 91 | kg | 123.2 | ₹11,211.2 |
| 10 | Steel work in built up tubular (round, square or rectangular hollow tubes
etc.) trusses etc., including cutting , hoisting , fixing in position and
applying a priming coat of approved steel primer, including welding and
bolted with special shaped washers etc. complete. Hot finished welded type tubes | 1,944 | kg | 156.95 | ₹3,05,110.8 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.89 MB
BOQ_1076355.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].