Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.4 LAdmitted-Finance GOHLAD MENDHAR | MENDHAR | POONCH | JAMMU KASHMIR | -33.00% | ₹5.4 L | L1 | Admitted-Finance |
| 2 | L2₹5.6 L+₹24,000 (4.48%)Admitted-Finance | -30.00% | ₹5.6 L+₹24,000 (4.48%) | L2 | Admitted-Finance |
| 3 | L3₹5.9 L+₹56,000 (10.4%)Admitted-Finance | -26.00% | ₹5.9 L+₹56,000 (10.4%) | L3 | Admitted-Finance |
| 4 | L4₹6.0 L+₹60,000 (11.2%)Admitted-Finance | -25.50% | ₹6.0 L+₹60,000 (11.2%) | L4 | Admitted-Finance |
| 5 | L5₹6.4 L+₹1.0 L (19.4%)Admitted-Finance | -20.00% | ₹6.4 L+₹1.0 L (19.4%) | L5 | Admitted-Finance |
Tender Value
₹8 L
EMD Value
₹16,000
Closing Date
15 Jan 2026, 6:55 pmClosed
EXECUTIVE ENGINEER PWD RB DIVISION MENDHAR
EXECUTIVE ENGINEER PWD RB DIVISION MENDHAR
Please refer to BOQ
2026_PWDJK_299935_8
e-NIT No 96 of 2025-26 Dated 06-01-2026
Open Tender
Civil Works
Percentage
90 days
MENDHAR
Please refer to Technical Bid as per conditions of e-NIT.
2 documents required · 2 mandatory
₹300
Sub Treasurey Mendhar
₹16,000
9 Feb 2026
6 Jan 2026
16 Jan 2026
6 Jan 2026
15 Jan 2026
6 Jan 2026
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: 2.9.1 All kinds of soil :
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form work for: 1 Foundations, footings, bases for columns
Dumping stone including cost of stones. in Horizontal on level
Carriage of material by mechanical transport including loading/unloading and stacking complete from source to site of work sand Lead 50 kms avg
Carriage of material by mechanical transport including loading/unloading and stacking complete from source to site of work stone agg.below 40 mm Lead 05 kms avg
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.39 MB
BOQ_973226.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .