| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹98.9 LAccepted-AOC NO 129 INDIRA NAGAR ATTIPATTU CHENNAI 120 | CHENNAI | 120 | ₹98.9 L Quoted ₹1.1 Cr | L1 | Accepted-AOC L1 bidder |
| 2 | Rejected-Technical | - | - | Rejected-Technical BQR condition not satisfied |
| Sl No | Description | Qty | Unit | ADHITHAN L1 |
|---|---|---|---|---|
| 1.00 | Maintenance, Testing and Calibration of pressure and temperature gauges, pressure, temperature, level and flow transmitters/switches, RTD, Thermocouples and ON/OFF Solenoid valves etc. | 975 | Nos | 690 ₹7,93,845 |
| 2.00 | Calibration of pneumatic control valves operated by I/P positioners, smart positioners and Hydraulic valves operated by I/H converters and LVDTs, Calibration of CEMS analyzer | 55 | Nos | 1,950 ₹1,26,555 |
| 3.00 | Daily Walk down and visual inspection of field instruments | 270 | Nos | 1,100 ₹3,50,460 |
| 4.00 | Cleaning and terminal tightness checking of Pressure/ temperature/ flow/level Transmitters, switches, signal conditioners & sensors, Junction Boxes, On/Off valve Actuator etc. impulse line flushing and leak attending work | 350 | Nos | 640 ₹2,64,320 |
| 5.00 | Cleaning, terminal tightness checking and leakage arresting of Pressure/ Temperature gauges Thermocouples, RTD, SOV, Limit switches and SWAS & CEMS equipment’s etc. | 350 | Nos | 520 ₹2,14,760 |
| 6.00 | Control valve positioner/air filter regulator/airlock relay/Volume booster etc. cleaning and leak attending work | 50 | Nos | 825 ₹48,675 |
| 7.00 | GT ABB DCS, STG Siemens DCS, DM Plant Modicon PLC modules, Woodward Governing, TSI system, FIM cleaning and terminal tightness checking work | 100 | Nos | 590 ₹69,620 |
| 8.00 | Other PLC in IA/PA, IP/LP Injection, ETS, N2 system, etc. module cleaning & terminal tightness checking work | 30 | Nos | 219 ₹7,752.6 |
| 9.00 | GT, STG, DM plant OWS and EWS & Server system cleaning work | 16 | Nos | 330 ₹6,230.4 |
| 10.00 | GTG & STG Startup activities | 12 | Nos | 2,600 ₹36,816 |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
31 Oct 2025, 2:00 pmClosed
CE MTS GTS
144,Anna Salai, Chennai-600002
Routine, periodical and breakdown maintenance contract works in Electrical Division at Kuttalam GTPS for a period of one year during 2025-26
2025_EB_612454_1
SE/GTS/OT- 06 /2025-26
Open Tender
Electrical and Maintenance Works
365 days
Kuttalam GTPS, Kuttalam
As per specification
4 documents required · 4 mandatory
₹0
₹1 L
Yes
14 Jan 2026
10 Oct 2025
1 Nov 2025
10 Oct 2025
31 Oct 2025
14 Oct 2025
10 Oct 2025 - 27 Oct 2025
Amount
Maintenance, Testing and Calibration of pressure and temperature gauges, pressure, temperature, level and flow transmitters/switches, RTD, Thermocouples and ON/OFF Solenoid valves etc.
Calibration of pneumatic control valves operated by I/P positioners, smart positioners and Hydraulic valves operated by I/H converters and LVDTs, Calibration of CEMS analyzer
Daily Walk down and visual inspection of field instruments
Cleaning and terminal tightness checking of Pressure/ temperature/ flow/level Transmitters, switches, signal conditioners & sensors, Junction Boxes, On/Off valve Actuator etc. impulse line flushing and leak attending work
Cleaning, terminal tightness checking and leakage arresting of Pressure/ Temperature gauges Thermocouples, RTD, SOV, Limit switches and SWAS & CEMS equipment’s etc.
Control valve positioner/air filter regulator/airlock relay/Volume booster etc. cleaning and leak attending work
GT ABB DCS, STG Siemens DCS, DM Plant Modicon PLC modules, Woodward Governing, TSI system, FIM cleaning and terminal tightness checking work
Other PLC in IA/PA, IP/LP Injection, ETS, N2 system, etc. module cleaning & terminal tightness checking work
GT, STG, DM plant OWS and EWS & Server system cleaning work
GTG & STG Startup activities
Replacement / Releasing and re-fixing of pressure / temperature / flow / level transmitters & switches and other field instruments etc., for defect and mechanical co-ordination work
Replacement/Releasing and re-fixing of field instruments such as gauges, RTD, Thermocouple, manifolds and impulse line except turbine area.
Replacement/Releasing and re-fixing of ON/OFF valves/Actuators, Limit switches, Pilot actuators, Air regulators, O-ring and gaskets etc. for defect and mechanical co-ordination
Replacement/Releasing and re-fixing of Pneumatic control valve's positioner, position transmitter, airlock relay, volume booster, limit switches etc, vibration sensors, speed sensors, thermocouples/ RTDs in Gas and steam turbine area. for defect and other Mechanical co-ordination work
Assistantship in DCS control loop checking of signals and cable healthiness checking, spare cable tracing etc. and Electrical co-ordination work
Replacement/healthiness checking of ABB Symphony harmony/Siemens DCS, Modicon PLC, Woodward Governing system modules & other PLC cards and FIM replacement etc.
Functional checking of pressure/ temperature transmitters/switches /RTD/ Thermocouple/ flame scanner, Transducers etc. with DCS, vibration measurement of motors/pumps and operational checking of ON/OFF solenoid valves and limit switches Pneumatic control valves.
Assistantship in check measurement of new materials
Periodical cleaning, inspection and defective replacement of all Local Area Network Accessories like Ethernet switches, Ethernet cables & its jacks, Media Converters, Racks and Power packs.
Calibration of voltmeter / Ammeters /Timers includes safe release of meter/timer from panel / testing of meter & meter and physical verification, cleaning attending minor defects, repairs /adjustments, refixing of meter/timer, checking for correctness and restoring normalcy, handling of testing kits / equipments and maintaining of registers etc, as directed by the engineer in charge.
Calibration of KW/KVAR/PF/KWh/ Trivector Meter and all transducers including safe release of meter/ transducer from panel/testing and physical verification, cleaning attending minor defects, repair/ adjustment, refixing, checking for correctness and restoring normalcy, handling of testing kits/equipment and maintaining of registers etc., as directed by the engineer in charge.
Calibration of Bimetallic relays Electromagnetic relays and static relays including safe release of relay from panel/testing relay and physical verification, cleaning attending minor defects, repair/adjustment, refixing, checking for correctness and restoring normalcy, handling of testing kits/equipment and maintaining of registers etc, as directed by the engineer in charge.
Testing of Numerical relays, CT,PT,CVT,Surge Arrester/Capacitors (HV/EHV) including safe release of relay from panel/testing of relay and physical verification, cleaning attending minor defects, repairs/ adjustments, refixing of relay, checking for correctness and restoring normalcy, handling of testing kits/ equipments and maintaining of registers etc, as directed by the engineer in charge.
Testing of AVR, Generators, Power transformers, 110KV and 11KV Circuit Breakers handling of testing kits/ equipments and maintaining of registers, etc, as directed by the engineer in charge.
Testing and Troubleshooting of breakers upto 6.6KV rating, lighting transformers, HT and LT Motors, handling of testing/equipments and maintaining of registers etc, as directed by engineer in charge.
Lubricating, Cleaning and checking of control circuit tightness and healthiness in both end (local/Module), disconnection and reconnection of control cables on Motor operated valve and Laying of 10 meter LAN cable, CCTV cable and telephone cable and maintaining of registers etc, as directed by engineer in charge.
Limit setting of torque and limit switch of motorized valve checking of control circuits and Laying of 10 meter 1.5/2.5Sq.mm control cable upto 17 core UG Cable maintaining of registers etc, as directed by engineer in charge
Troubleshooting of control circuits problems in all type of LT & HT modules, Checking for tightness healthiness cleaning of all type of control and relay panels, UPS, Chargers, LT & HT module, control and annunciation panels, fire panels, fire detectors and CO2 fire protection etc, and maintaining of registers etc, as directed by engineer in charge.
Troubleshooting, cleaning and Routine maintenance of CCTV
Assistance to the maintenance Engineers during GTG & STG startup and shutdown, commissioning of new equipment & other activities as directed by engineer in charge.
Monitoring, taking daily walk down check list of all important parameters in the station, checking of all fire systems and checking of all intercom connection healthiness.
Maintenance of LT Modules below 45KW rating & breakdown works (once in 3 months).
Maintenance of LT LT Breakers, 45 KW & above rating rugular (once in 3 Months) & breakdown works
Maintenance of LT Motors below 25HP/18.5KW rating regular & breakdown works (once in 3 months).
Maintenance of LT Motors above 25HP/18.5KW regular & breakdown works (once in 3 months).
Maintenance of HT motors regular & breakdown works (once in 3 months).
Maintenance of HT circuit breakers regular & breakdown works (once in 3 months).limited to 75
Maintenance of Intercom, limited to 24
Monitoring taking daily walk down check list of all important equipments.
Painting of Electrical equipments motors below 6 Feet
Painting of Electrical equipments motors above 6 Feet height
Replacement of worn-out bearings in LT Motors below 18.5KW.
Replacement of worn-out bearings in LT motors above 18.5KW to 45KW.
Replacement of worn-out bearings in LT motors above 45KW to 150KW.
Co-ordination work with MRT for testing of Generators and HT motors includes disconnection and reconnection of Links to isolate the equipments for testing purpose.
Vertical Motors Releasing and Re-fixing due to Unexpected motor winding burnout and Mechanical Co-ordination works.
Releasing, unloading, loading and Re-fixing due to unexpected breakdown works of 100HP/75KW, ACC Fan Motors.
Rectification of indoor and outdoor lighting such as tube light fittings, LED normal/flood Light fittings etc., below 4.5mtrs height.
Rectification of indoor and outdoor lighting such as tube light fittings, LED flood Light & street light fittings etc., above 4.5mtrs height.
Maintenance of 110 KV isolators, CTs, CVTs, LAS,SF 6 gas top up, earth pit maintenance, earth switches, etc., Regular (once in 3 months) & Break down.
Maintenance of 110KV circuit Breakers routine (once in 3 months)
Maintenance of GTG/STG Transformers and Auxiliary Transformers like UAT’s, APT’s, Rectifier Transformer and Lighting Transformers once in 3 months.
Maintenance of Battery cells and once in a week.
Extension of temporary supply.
Painting of Electrical equipments such as breakers, MOM Box sets, CT’s sets, CVT sets, and PT’s sets at 110KV switchyard & local control boxes below 6 Feet
Painting of Electrical equipments such as breakers, MOM Box sets, CT’s sets, CVT sets, and PT’s sets at 110KV switchyard & local control boxes above 6 Feet height.
Pre checks and Assistance during GTG and STG Startup, shutdown actives.
Co-ordination work with MRT for testing of Transformers & 110KV CT’s, PT’s & Circuit Breakers.
Electrical Maintenance in Quarters
Main Control Room: – Carrying out assistance operation works in taking periodical readings, Battery and Battery charger readings and in operating manual valves / breakers etc., and also in start-up and shutdown activities of unit etc.,
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
SPECOT06.pdf
Tender Documents • 1.21 MB
BOQ_731823.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid