| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹35.7 LAccepted-AOC | L2 | Accepted-AOC WORK ORDER | |
| 2 | L2₹37.4 LRejected-Finance H 99 6TH CROSS STREET R M COLONY DINDIGUL | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | SIGRUN VERTRAG PROJECTS L2 | SRI SAAI ASSOCIATE L1 |
|---|---|---|---|---|---|
| 1.00Name of the Work :Renewal BT at Kappiliyapatty to Appinaickenpatty Road KM 0/0 - 1/6 Estimate Amount:Rs.40.00 lakhs | |||||
| 2.00 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | 2,304 | Sqm | 6.6 ₹15,206.4 | 6.3 ₹14,515.2 Lowest |
| 3.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 576 | Cum | 145 ₹83,520 | 140 ₹80,640 Lowest |
| 4.00Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal | |||||
| 5.00 | KM 0/0 - 1/0 | 13.25 | Cum | 4,730 ₹62,672.5 | 4,507 ₹59,717.75 Lowest |
| 6.00 | KM 1/0 - 2/0 | 7.86 | Cum | 4,740 ₹37,256.4 | 4,515 ₹35,487.9 Lowest |
| 7.00 | Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat | 6,018.75 | Sqm | 36 ₹2,16,675 | 34.5 ₹2,07,646.88 Lowest |
| 8.00 | BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as
per specification using CMP as per clause 507 of MORTH Rev-5 | 180.57 | Sqm | 12,300 ₹22,21,011 | 11,740.5 ₹21,19,982.08 Lowest |
| 9.00 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS | 192 | Sqm | 358 ₹68,736 | 341 ₹65,472 Lowest |
| 10.00 | Supply of Kilometre stone of size 1.65m x 0.45 x 0.15m including all charges etc., | 1 | Cum | 2,300 ₹2,300 | 2,197 ₹2,197 Lowest |
Tender Value
Refer Docs
EMD Value
₹40,000
Closing Date
24 Feb 2026, 3:00 pmClosed
The Project Director DRDA Dindigul
The Project Director DRDA Dindigul
Strengthening of the road 1 no road works in Dindigul Block MGSMT ( Additional ) 2025-2026 in Dindigul District TN05-28
2026_RDTN_658391_1
DIPR-1084-Tender 2026
Open Tender
Civil Works
Item Wise
180 days
DRDA DINDIGUL
Strengthening of the road 1 no road works in Dindigul Block MGSMT ( Additional ) 2025-2026 in Dindigul District TN05-28
3 documents required · 3 mandatory
₹0
₹40,000
DRDA DINDIGUL
20 Mar 2026
16 Feb 2026
24 Feb 2026
16 Feb 2026
24 Feb 2026
16 Feb 2026
20 Feb 2026
Name of the Work :Renewal BT at Kappiliyapatty to Appinaickenpatty Road KM 0/0 - 1/6 Estimate Amount:Rs.40.00 lakhs
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat
BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Supply of Kilometre stone of size 1.65m x 0.45 x 0.15m including all charges etc.,
Supply of Hectametre stone of size 0.90 x 0.15 x 0.15 metre
Provision for 60 cm Equilateral triangle cautionary Sign Board
Construction of Retaining Wall Ch 550
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete for 10m3
Supplying and Erecting Centering for Drainage side with cost and conveyance of all materials and all labour charges etc., completed.
CC 1:3:6 mix using 40 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.14 MB
Tendernotice_2.pdf
PDF • 0.84 MB
BOQ_789849.xls
BOQ • 0.32 MB
PRICEBIDMGSMT.pdf
PDF • 0.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .