| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹98,951.26Accepted-Finance | L1 | Accepted-Finance Generally found in order |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
19 Oct 2023, 2:00 pmClosed
SE/TEDC/TIRUNELVELI
Anna Building, Maharajanagar, Tirunelveli
Execution of works contract for Capital, Improvement, DCW, HT/LT lines and DT maintenance works in Ambai Sub Division of Kallidaikurichi Division in respect of Tirunelveli EDC
2023_EB_378723_1
SE/TEDC/TIN/ET-41/2023-24
Open Tender
Electrical and Maintenance Works
Works
180 days
TIRUNELVELI
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹10,000
Yes
10 Nov 2023
13 Oct 2023
20 Oct 2023
13 Oct 2023
19 Oct 2023
13 Oct 2023
Amount
Normal ground- Excavation of Pole pits (1.25m * 0.5m*1.5m) for 8m 200 Kg PSC poles
Normal ground- Erection of 8m 200 Kg PSC poles
Rocky ground- Excavation of Pole pits (1.25m * 0.5m*1.5m) for 8m 200 Kg PSC poles
Rocky ground- Erection of 8m 200 Kg PSC poles
Hard Rock requring Blasting and Chisseling (Specific approval obtained from EE) - Excavation of Pole pits (1.25m * 0.6m*1.83m) for 8m 200 Kg PSC poles
Hard Rock requring Blasting and Chisseling (Specific approval obtained from EE) - Erection of 8m 200 Kg PSC poles
Normal ground- Excavation of Pole pits (1.25m * 0.6m*1.83m) for 9M 300/ 400 Kg PSC Poles & 9.14M RCC poles
Normal ground- Erection of 9M 300/ 400 Kg PSC Poles & 9.14M RCC poles
Rocky ground- Excavation of Pole pits (1.25m * 0.6m*1.83m) for 9M 300/ 400 Kg PSC Poles & 9.14M RCC poles
Rocky ground- Erection of 9M 300/ 400 Kg PSC Poles & 9.14M RCC poles
Hard Rock requring Blasting and Chisseling (Specific approval obtained from EE) - Excavation of Pole pits (1.25m * 0.6m*1.83m) for 9M 300/ 400 Kg PSC Poles & 9.14M RCC poles
Hard Rock requring Blasting and Chisseling (Specific approval obtained from EE) - Erection of 9M 300/ 400 Kg PSC Poles & 9.14M RCC poles
Normal ground- Excavation of Pole pits (1.25m * 0.6m*2.19m) for above 9.14M poles & 36' /40'/42' length RS Joists
Normal ground- Erection of above 9.14M poles & 36'/40'/42' length RS Joists
Rocky ground- Excavation of Pole pits (1.25m * 0.6m*2.19m) for above 9.14M poles & 36'/40'/ 42' length RS Joists
Rocky ground- Erection of above 9.14M poles & 36' /40'/42' length RS Joists
Hard Rock requring Blasting and Chisseling (Specific approval obtained from EE) - Excavation of Pole pits (1.25m * 0.6m*2.19m) for above 9.14M poles & 36'/40'/ 42' length RS Joists
Hard Rock requring Blasting and Chisseling (Specific approval obtained from EE) - Erection of above 9.14M poles & 36'/40'/ 42' length RS Joists
Transporting of poles from road side to pole pit - 8m PSC pole upto 2 Km
Transporting of poles from road side to pole pit - 9m 300/400 Kg PSC, 9.14m RCC pole upto 2 Km
Transporting of poles from road side to pole pit - RSJ 36'/40' Pole upto 2 Km
Transporting of poles from road side to pole pit - RSJ 42' and above upto 2 Km
Loading and Unloading of poles - 8m PSC Pole
Loading and Unloading of poles - 9m 300/400 Kg PSC, 9.14m RCC
Loading and Unloading of poles - RS Joists, tubular & rail pole (above 9.14m)
Concreting of poles as per Board Standards (2'*2'*5'). The material such as cement, sand, jally, etc., have to be supplied by the contractor (Cement concrete mix 1:4:8 using 40mm hard broken stone including cost of labour charges.for placing Transporting of sand,jally,form box and water curing for 14 days etc,.)
Coping of pole (0.6m*0.6m*0.35m)
Concreting of stay (o.3m * 0.3m * 1.5m) including materials
Coil earthing per pole & pole earthing
Normal ground- Excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (For stay set)
Normal ground- Erection of stay set
Rocky ground- Excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (For stay set)
Rocky ground- Erection of stay set
Hard Rock requring Blasting and Chisseling (Specific approval obtained from EE) - Excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (For stay set)
Hard Rock requring Blasting and Chisseling (Specific approval obtained from EE) - Erection of Stay Set
Loading and Unloading charges of Oil drums (with oil)
Loading and Unloading charges of Oil drums (without oil)
Loading and Unloading charges of Conductor Drum, Cable Drum
Loading and Unloading charges of Line Materials
Loading and Unloading charges of Metering Set
Fixing of V & Channel cross arm 5' including transporting of materials from road side to site
Fixing of V & Channel cross arm 4.5' including transporting of materials from road side to site
Fixing of V & Channel cross arm 3.5' including transporting of materials from road side to site
Fixing of LT 3Phase cross arm including transporting of materials from road side to site
Fixing of LT 1Phase cross arm including transporting of materials from road side to site
Fixing of HT/ LT TI fitting including transporting of materials from road side to site
Erection of HT Side arm with stud including transporting of materials from road side to site
Erection of LT Side arm with stud including transporting of materials from road side to site
Fixing of HT/LT insulator / LT shackle (per location) including transporting of materials from road side to site
Fixing of 11 KV Disc including transporting of materials from road side to site
Fixing of Tapping Channel Cross arm including transporting of materials from road side to site
LT lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/2.50 AAAC
LT/HT lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/3.15 AAAC
HT lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/4.09 ACSR
HT lines - Stringing, Sagging, binding including transporting of materials from road side to site-For Dog Conductor
For LT/HT line clear works (Please mention in % for respective conductor stringing)
Guarding per span length- Spilt Neutral Guarding
Guarding per span length- Flat Guarding (2 wires)
Guarding per span length- Flat Guarding (4 wires)
Guarding per span length- Flat Guarding (6 wires)
Guarding per span length- Cradle Guarding (Fixing of ' X' arm)
Guarding per span length- Fixing of one earthing device with stud
Erection of transformer/dismantling upto 100 KVA
Erection of transformer/dismantling for 250KVA
Erection of transformer/dismantling for 500KVA
Erection of centre support (Including concrete)
Erection of Metering Set
Erection of feeder cable with open type fuse unit per feeder
Erection of feeder cable with open type fuse unit - for each addl feeder
Erection of feeder cable -Bus bar arrangement with open type
Loading & unloading of Distribution transformer below 250KVA
Loading & unloading of Distribution transformer 250KVA
Loading & unloading of Distribution transformer 500KVA
Plinth work for 500KVA DT with construction material
Fabrication, erection and excavation for centre support etc for 250/500 DT including transporting
LED tube light erected in complete set (including transport)
Painting of SC Number including Painting
Manufacturing of clamps 50*8 mm
Manufacturing of clamps 65*10 mm
Alteration of clamps
Street light switching point arrangement
Drilling less than 23mm holes per hole/slotted hole
Cutting of channel
Cutting of Flat
Cutting of Angle
RSJ pole cutting
Tubular pole cutting
Rail pole cutting
Fabrication of lightning arrestor frame
LT-Changing of pin point to cut point
HT-Changing of pin point to cut point
Erection of service connection materials-1Ph service
Erection of service connection materials-3Ph service
Dismantling of deteriorated poles with concrete in damaged condition including grill separation etc.,
Dismantling of poles without concrete in damaged condition including grill separation etc.,
Providing jumpering at cut point
complete replacement of worn out earth wire per structure
Labour for manufacturing of open type fuse unit (Materials supplied by board)
Manufacturing of HG fuse stool (Materials supplied by board)
Tree clearence in HT or LT location
Painting-Double pole Transformer structure materials (Double coat) including material
Painting-Pole (Colour washing with distember) including material
Painting-For transformer only (Double coat with paint)
Numbering of poles with paint (Labour)
Numbering of Distribution Trnasformer (Painting and writing of name board size-1-1/4*1 incl cost of paint and MS sheet
Writing in seating channel with paint
Painting of RCC Strcucture poles all metal parts, snowcem & aluminium paint with paint
Painting of RSJ structure poles & metal parts-aluminium paint with paint
Set right of leaning HT pole/LT pole including x arms, TI fittings
Transformer structure erection-Excavation of structure pole pits ( 2 Nos)
Transformer structure erection-Erection of structure poles (2 Nos)
Transformer structure erection-Excavation of stay pits(4Nos)
Transformer structure erection-Erection of stay set (4Nos)
Transformer structure erection-Concreting of structure poles incl.materials mass concrete with copping
Transformer structure erection-Concreting of stays (4Nos) incl.materials
Erection of Structure materials-Top Channel
Erection of Structure materials-Transformer seating channel and belting angle
Erection of Structure materials-AB switch (Complete)
Erection of Structure materials-HG fuse (Complete)
Erection of Structure materials-Jumpering
Fixing of Structure materials-HT LAS
Fixing of Structure materials-LT LAS
Erection of Structure materials - Transformer LT cable wiring / LT Bus Bar
Erection of LT Open type fuse unit including cable jumbering up to the line including cutting welding bending, fabrication etc
Earthing system-Excavation of 4 Nos. earth pits
Earthing system-Excavation of earth wire trenches and paving of earth wire, Erection of 4 Nos. earth pipe and giving earth connection, Earthing of all metal parts, LAS etc., including central connection
Earthing system-Mason works with brick for earth pits 4 Nos (cement supplied by Contractor)
Earthing system- Transporting of structure materials ABS, HG Fuse, cable etc Except Pole
Earthing system- Fixing of Danger Board (labour Only)
Earthing system-Spreading yard jalli and cut stone and bricks including material
Erection of Tapping structure-Excavation of structure pole pit. 2 Nos
Erection of Tapping structure-Erection of structure pole. 2 Nos
Erection of Tapping structure-Excavation of stay pit. 2 Nos
Erection of Tapping structure-Erection of stay set. 2 Nos
Erection of Tapping structure-Concreting of pole including materials mass concrete with copping 2 Nos
Erection of Tapping structure-Concreting of stay 2 Nos.
Erection of Structure materials-Top channel
Erection of Structure materials-AB switch (complete)
Erection of Structure materials-Assemble, operating pipe fixing etc., fixing of cross bracing
Earthing system-Excavation of 1 No. earth pits Excavation of earth wire trench and paving of earth wire, Erection of 1 No. earth pipe and giving earth connection, Earthing of all metal parts, for tapping structure.
Earthing system-Mason works for earth pit (including material)
Colour coating on poles with iron materials including paint and distember
Transporting of 42' twin RSJ pole from roadside pole pit
Fabrication of 42' Twin RSJ pole, Materials supplied by Board.
Excavation & Erection of Twin 42' fabricated RSJ pole
Concreting of 42' twin RSJ pole
Loading & Unloading of 42' twin RSJ pole
Re-Sagging of Conductor
Dismantling of 8m PSC pole
Dismantling of 9m PSC/ 9.14m RCC Pole/ RSJ
Dismantling of stay set complete
Replacement of detoriated stay rod
Replacement of RSJ/Tubular poles below 30 feet
Replacement of RSJ/Tubular poles above 30 feet
Dismantling of detoriated cables of various size (95,120,185 sq.mm) from DT, LT bushing to LT open type clamp and erection of suitable lug at both ends
Replacement of new 10' earth pipe replacing the corroded earth pipe and renewal of earthing including burying, looping and binding
Mass Concrete for poles (All Materials including) (Ratio 1:2:4) (0.72 m3) (0.65*0.65*1.65 m,0.6*0.6*0.35 Cum)
Sleeve Concrete for poles (All Materials including cement) (Ratio 1:2:4) (0.202) (0.5*0.45*0.9M)
Providing of Spacers in LT Lines
Hiring of JCB
Hiring of Crane
Exceeding 1 Hour for every hour
Transporting Charges for DT / Line materials using private vehicle upto 20 KM (Up and Down)
Beyond 20 KM for every KM
Single pole structure erection- 9.0 mtr RCC POLE (square) -Loading & Unloading of poles
Single pole structure erection- 9.0 mtr RCC POLE (square) -Excavation of pole pit & pole erection
Single pole structure erection- 9.0 mtr RCC POLE (square) -Transporting road side to pole pit
Single pole structure erection-Excavation and erection of stay set complete with stay clamps ( with 16mm stay rod with base plate )
Fixing of single pole structure materials & structure clamps ( Tapping channel - 1 No., Tr.bed, Erection AB switch - 1 set, Erection HG Fuse set - 1 set )
Erection of 16/25 KVA DT
Earthing for 9 mtr RCC structure square pole (3 pits)
Concreting including materials for 9 mtr RCC square pole-Base concreting 1:4:8 500*650*150mm, Pole concreting1:2:4 500*500*1700 & Coping 1:2:4 ( as per actuals )
Erection of LT wiring kit ( Double open type circuit)
Fixing of caution / Danger Board as per drawing
Painting of single pole str including iron materials double coat with painting materials
Maintenance of AB switch-Replacement of male and female one number contact and PTinsulator
Maintenance of AB switch-Cleaning of contacts, lubrication and checking of operating pipe movments
Maintenance of Distribution Transformer-Cleaning of HT/LT Bushings, Oil level checking , Silical gel replacement, Terminal tightness checking, Cleaning of DT yard, earth pit watering and maintenance of open types, Providing of 'g' jumpering etc.,
Dismantling of other line materials - (Please mention In percentage for respective line material errection works)
corroded pole welding with 4 piece of iron
Welding joint for RSJ pole per foot
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .