| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.4 LAccepted-AOC | ₹28.4 L | L1 | Accepted-AOC The lowest bidder L1 is accepted |
| 2 | L2₹28.7 LRejected-AOC | ₹28.7 L | L2 | Rejected-AOC The lowest bidder L2 is rejected |
| 3 | L3₹28.8 LRejected-AOC | ₹28.8 L | L3 | Rejected-AOC The lowest bidder L3 is rejected |
Tender Value
₹28.4 L
EMD Value
₹56,772
Closing Date
16 Jan 2026, 9:30 amClosed
EE AED
EE AED Kalimpong
Construction of Jeepable Road from Mangarjung Road to Coffee Plantation at Mangarjung, Munsong Cinchona Plantation.
2025_GTA_980535_2
08/EE/AED/KPG/GTA/2025-26
Open Tender
CIVIL WORKS
90 days
Munsong
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,000
₹56,772
6 Feb 2026
29 Dec 2025
19 Jan 2026
30 Dec 2025
16 Jan 2026
30 Dec 2025
Earthwork in cutting to form road section in correct profile including removal of spoils not exceeding initial lead of 50m and initial lift of 1.5m in mixed soil. (iii) In mixed hhard soil.
Earthwork in cutting to form road section in correct profile including removal of spoils not exceeding initial lead of 50m and initial lift of 1.5m in mixed soil. (iii) In mixed hhard soil. (i) In ordinary soil
Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or tacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge.
Providing and laying Design Mix concrete for plain / reinforced concrete work in any part of bridge (excluding bottom plugging) with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete but excluding cost of labour and materials for formwork & reinforcement works. M-25 Grade
Providing and laying Design Mix concrete for plain /reinforced concrete work in any part of bridge (excluding bottom plugging) with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete but excluding cost of labour and materials for formwork & reinforcement works. M-15 Grade
Supplying, fitting and placing HYSD bar reinforcement in Bridge Super-structure including initial straightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite length bending, binding with annealed wire not less than 1 mm in size and conforming to IS 280 at every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unloading, carriage of all steel materials complete as per drawing and technical specifications.
Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, cross-drain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction. (b) Where staging is not required.
Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, cross-drain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction. (a) Where staging is required.
Plum Concrete work with cement concrete (1:3:6) with 30mm down graded stone metal 40% and stone boulders of size 150mm above placed in position as directed excluding shuttering.
Rubble masonry in cement (1:6) with hard dressed stones from approved quarries and clean, coarse and washed sand including carriage of all materials to site a) In Road and Jhora Work
Dry Rubble Masonry with hard dressed stone from approved quarries including all carriage of materials
Hand Packed rough dressed boulder wall with boulders from approved quarries including all carriage of all materials to site.
Providing weep holes in Brick masonry / Plain / Reinforced concrete abutment, wing wall / return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing face. Complete as per drawing and Technical specifications.
Earth filling on the backside of the abutment, wingwalls etc.
Plaster with sand & cement motar including rounding of corners or chamfering corners as directed and including raking out joints 20mm th.plaster in 4:1 cement motar.
Providing and laying Filter media with granular materials/stone crushed bed materials satisfying the requirements laid down in clause 2504.2.2 of MorTH's
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.63 MB
Tendernotice_2.pdf
PDF • 0.75 MB
BOQ_2390908.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid