| 1 | L1₹70.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹73.2 L+₹2.4 L (3.45%)Rejected-Finance | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | N.MUTHUKUTTI L1 | SHREE SAI PARVATHY CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.001) Renewal of Ayansingampatti Kasamadasamy koil Road (0/0 1/07) (using plastic waste) | |||||
| 2.00 | Clearing Scrub Jungle without alignment for the widening of the formation of the road cutting of trace up to 30mm girth products the cleaning are to be stocked in such a place as ordered by the departmental officer and the ground shall be left in a perfectly clean condition. All holes of hollows whether original, existing (or) produced by digging of roots shall than be carefully filled up the earth well rammed and leveled of and the entire work completed in all respect. | 758.81 | sqm | 6.2 ₹4,704.62 Lowest | 7.5 ₹5,691.08 |
| 3.00 | Collection and supply of carted from approved quarry an average lead 1km including cost and conveyance of all materials to site any labour charges etc | 126.47 | cum | 140.3 ₹17,743.74 Lowest | 150 ₹18,970.5 |
| 4.00 | Collection and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS | 126.47 | cum | 340.4 ₹43,050.39 Lowest | 380 ₹48,058.6 |
| 5.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 12.9 | cum | 2,394.8 ₹30,892.92 Lowest | 2,450 ₹31,605 |
| 6.00 | Applying PRIMECOAT over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion ncluding cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification. | 129 | sqm | 84.8 ₹10,939.2 Lowest | 90 ₹11,610 |
| 7.00 | Providing and laying Tack coat over WMM surface (Treated with Primer)using 2.50 Kg of bitumen emulsion RS-1 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat by bitumen sprayer | 129 | sqm | 19.75 ₹2,547.75 Lowest | 25 ₹3,225 |
| 8.00 | Providing and laying TACK COAT over BT surface using 3 Kg of RS-1 Bitumen Emulsion/ 10 sq.m for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery,fuel and all other incidental charges etc complete.including labour for spraying, hire charges for bitumen sprayer etc. Comp. | 3,081 | sqm | 33.4 ₹1,02,905.4 Lowest | 36 ₹1,10,916 |
| 9.00 | BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 80.78 | cum | 11,479.5 ₹9,27,314.01 Lowest | 11,800 ₹9,53,204 |
| 10.00 | Providing Rumble Strips covered with Bituminous Concrete Bituminous 20mm high at center,250mm vide placed at 1m center to center at approved locatioons to control speed marked with white strips of road marking paint. | 2.25 | sqm | 380.5 ₹856.13 Lowest | 410 ₹922.5 |
Tender Value
₹76.8 L
EMD Value
₹77,000
Closing Date
3 Sept 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Director
DRDA, Tirunelveli
Renewal of 2 roads in Ambasamudram block
2025_RDTN_594231_3
DIPR/4437/TENDER/2025
Open Tender
Civil Works
Item Rate
120 days
Tirunelveli District
As per Pre-Qualification details
5 documents required · 5 mandatory
₹0
₹77,000
DRDA, Tirunelveli
10 Oct 2025
18 Aug 2025
3 Sept 2025
18 Aug 2025
3 Sept 2025
26 Aug 2025
26 Aug 2025
Amount
1) Renewal of Ayansingampatti Kasamadasamy koil Road (0/0 1/07) (using plastic waste)
Clearing Scrub Jungle without alignment for the widening of the formation of the road cutting of trace up to 30mm girth products the cleaning are to be stocked in such a place as ordered by the departmental officer and the ground shall be left in a perfectly clean condition. All holes of hollows whether original, existing (or) produced by digging of roots shall than be carefully filled up the earth well rammed and leveled of and the entire work completed in all respect.
Collection and supply of carted from approved quarry an average lead 1km including cost and conveyance of all materials to site any labour charges etc
Collection and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion ncluding cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying Tack coat over WMM surface (Treated with Primer)using 2.50 Kg of bitumen emulsion RS-1 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat by bitumen sprayer
Providing and laying TACK COAT over BT surface using 3 Kg of RS-1 Bitumen Emulsion/ 10 sq.m for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery,fuel and all other incidental charges etc complete.including labour for spraying, hire charges for bitumen sprayer etc. Comp.
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Providing Rumble Strips covered with Bituminous Concrete Bituminous 20mm high at center,250mm vide placed at 1m center to center at approved locatioons to control speed marked with white strips of road marking paint.
Provision for HM stones
Provision forKM stones
Construction of retaining wall @ Ch. 600, 795, 870m
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B etc
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for Levelling course
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for foundation
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and superstructure for Abutment /pier using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying withstandard specifications and as directed by departmental officers etc. Below Ground level
2) Renewal of Black Topping to Nattaslai Nalayairuthamman koil road Km0/0-0/650 (using plastic waste)
Clearing Scrub Jungle without alignment for the widening of the formation of the road cutting of trace up to 30mm girth products the cleaning are to be stocked in such a place as ordered by the departmental officer and the ground shall be left in a perfectly clean condition. All holes of hollows whether original, existing (or) produced by digging of roots shall than be carefully filled up the earth well rammed and leveled of and the entire work completed in all respect.
Earth work excavation and depositing on Bank initial lead and lift in hard gravally soil for cutting side drain etc compl as per SS20A
Collection and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Advance patch work for making up the undulation in the existing B.T. surface to an average thickness of 50mm using 45mm IRC size HBG metal including cost of bitumen and all labour charges
Providing and laying TACK COAT over BT surface using 3 Kg of RS-1 Bitumen Emulsion/ 10 sq.m for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery,fuel and all other incidental charges etc complete.including labour for spraying, hire charges for bitumen sprayer etc. Comp.
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Providing Rumble Strips covered with Bituminous Concrete Bituminous 20mm high at center,250mm vide placed at 1m center to center at approved locatioons to control speed marked with white strips of road marking paint.
Provision for HM stones
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SHREE SAI PARVATHY CONSTRUCTION (BID ID -1448440)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .