Loading…
Loading…
Tender Value
₹1.1 Cr
EMD Value
₹2.1 L
Closing Date
31 Jul 2026, 2:00 pm
Annual Zonal Contract - Dharur (Excluding) to Wadi (Excluding) (for the Period 01.07.2026 to 30.06.2027).
111_W_SC_26_OT
111_W_SC_26_OT
Open
12 Months
Osmanabad, Maharashtra
₹0
₹2.1 L
6 Jul 2026
6 Jul 2026
17 Jul 2026
C-SCHEDULE-C (DSR -2020 HORTICULTURE & LANDSCAPING ITEMS) 100350.00 Below/P
D-SCHEDULE-D (SUPPLY ITEMS - NS ITEMS) 499996.56 Below/P
Item Breakup - D-SCHEDULE-D (SUPPLY ITEMS - NS ITEMS)
of Portland Cement (OPC-43 Grade) MT including all contractors labour, transportation, lead & lift, taxes, stacking at desired location etc as per as directed by the Engineer In charge at site.
of fine sand (Zone IV) including all cum contractors labour, transportation, lead & lift, taxes, stacking at desired location etc as per as directed by the Engineer In charge at site.
1500.00 with all contractors transportation, lead and lift, Nos. taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
25.00 300 x 16mm etc., with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
25.00 250 x 16mm etc., with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
50.00 etc., with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
25.00 type) 200x10mm, with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
2000.00 all contractors transportation, lead and lift, taxes, Nos. stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
15.00 250x16mm, with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
50.00 type) 100x10mm, with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
50.00 with plate 175x32mm, with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site. SECUNDERABAD DIVISION-ENGG/SOUTH CENTRAL RLY
50.00 with plate 125x32mm, with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
of manufactures, with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
2.00 2124.00 manufactures, with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
10.00 transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
268.00 0.50mm etc., with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
20.00 contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
20.00 contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
10.00 etc., with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
25.00 with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
20.00 both faces 6mm thick etc., with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
180.00 Kg/Cm2) single socketed pipe 75mm dia etc., with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
10.00 Kg/Cm2) single socketed pipe 110mm dia etc., with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
5.00 etc., with all contractors transportation, lead and cudm lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
15.00 basin 630 x 450mm etc., with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site. SECUNDERABAD DIVISION-ENGG/SOUTH CENTRAL RLY
20.00 seat in European W.C. Pan etc., with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
150.00 wash basin 32mm dia with length not less than 700mm i/c PVC waste fittings etc., with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
20.00 wash basin 40mm dia with length not less than 700mm i/c PVC waste fittings etc., with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
3.00 1652.00 nominal size, with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
20.00 4mm (weight not less than 10 Kg/Sqm) including, with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
20.00 5mm (weight not less than 12.50 Kg/Sqm) including, with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
5.00 1121.00 with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site
20000.00 cover and suitable locking arrangement, with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
100.00 brass union 45cm long 15mm bore, with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
10.00 level white with fittings and accessories and flush pipe, with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
10.00 C.P. brass hinges and rubber buffers etc., with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
25.00 floats : 20mm dia etc., with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
20.00 floats: 15mm dia etc., with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site. SECUNDERABAD DIVISION-ENGG/SOUTH CENTRAL RLY
10.00 (screw end) 25mm dia including, with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
15.00 (Screwed end) 25 mm dia with all contractor's transportation, lead & list, Taxes ,stacking at desired location etc as per directed by the Engineer in charge at site.
10.00 wheel of desired brand/make with all contractor's transportation, lead & list, Taxes ,stacking at desired location etc as per directed by the Engineer in charge at site
200.00 flange with all contractor's transportation, lead & list, Taxes ,stacking at desired location etc as per directed by the Engineer in charge at site.
201.00 flange with all contractor's transportation, lead & list, Taxes ,stacking at desired location etc as per directed by the Engineer in charge at site.
25.00 contractor's transportation, lead & list, Taxes, stacking at desired location etc as per directed by the Engineer in charge at site. Total 499996.56
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
TenderScheduleTDUsection.pdf
ATTACHMENT
Annexure-ISupplyItems.pdf
ATTACHMENT
Mastertenderbooklet2ason26.03.2026.pdf
ATTACHMENT
Mastertenderbooklet1ason26.03.2026.pdf
ATTACHMENT
master building conditions
ATTACHMENT
STCablecondiditionsF.pdf
ATTACHMENT
MasterDocumentforSpecialConditionsforcontractsforCivil-Buildingworks-Correctedon10.03.2026.pdf
ATTACHMENT
Download all tender documents and submit your bid