| 1 | L1₹1.1 CrAccepted-AOC NO 262 MOOVENDER NAGAR B B KULAM MADURAI 625 002 | MADURAI | MADURAI | TAMIL NADU | 625002 | ₹1.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.1 Cr+₹4.9 L (4.60%)Rejected-AOC 2 K 625007 | MADURAI | TAMIL NADU | 625007 | ₹1.1 Cr+₹4.9 L (4.60%) | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | P RAMAR PANDI L1 | M ARULRAJ L2 |
|---|---|---|---|---|---|
| 1.01 | Earth work excavation in all kinds of soils except hard rock requiring blasting, inclusive of shoring, strutting and baling out water wherever necessary refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated depositing the surplus earth within compound in places as shown by the deptl.officers, clearing and leveling the site with initial lead of 10M and lift of 2M etc.Comp.SI.No.62-rate for 10m3 - For Entire Road Portion | 815 | M3 | 90.6 ₹73,839 Lowest | 94.8 ₹77,262 |
| 2.01 | Providing and laying, spreading and compacting 0.396m3 of 45-22.40mm & 0.528m3 of 22.40-2.36mm & 0.396m3 of 2.36mm and below metal graded stone aggregate to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in subbase/basecourse on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. MDU-CORP DATA-P-23 -SL No:8 | 815 | M3 | 2,037.2 ₹16,60,318 Lowest | 2,130.9 ₹17,36,683.5 |
| 3.01 | Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev V Specifications MDU Road Data-2020-21-Pg - 21 | 8,148 | M2 | 83.1 ₹6,77,098.8 Lowest | 86.9 ₹7,08,061.2 |
| 4.01 | Providing and laying tack coat of 2.5 kgs/10 sqm over the Prime surface treated with binder using 2.5 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev V Specifications MDU Road Data-2020-21-Pg - 21 | 8,148 | M2 | 17.5 ₹1,42,590 Lowest | 18.3 ₹1,49,108.4 |
| 5.01 | Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25 cum of 13.20-2.36mm and 0.23 cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min. required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20- 30t CMP with bitumen boiler, tipper trucks, Paver Finisher /9m paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5 | 408 | M3 | 9,762.5 ₹39,83,100 Lowest | 10,211.6 ₹41,66,332.8 |
| 6.01 | Providing and laying Bituminous Concrete to 30mm/40mm thick using 0.13 cum of 19.00 - 9.50mm, 0.17cum of 9.50 -2.36mm and 0.26cum of 2.36 and below with 50.30kgs of VG30 / VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5. | 245 | M3 | 10,083.5 ₹24,70,457.5 Lowest | 10,547.3 ₹25,84,088.5 |
| 7.01 | Raising the existing circular manholes in heavy type including removing the existing manhole cover with frame by dismantling the existing cement concrete and tar road surface alround the manhole raising the manhole with cement concrete 1:2:4 (one cement two sand and four aggregates ) 25 cm height including centering inside the manhole raising ,laying 15 cm tk cement concrete 1:2:4 with 20mm granite chips including finishing the top surface of manhole alround etc., complete., | 11 | No | 3,267.5 ₹35,942.5 Lowest | 3,417.8 ₹37,595.8 |
| 8.01 | Supply of FRC Manhole 600mm size dia cover with frame including cost of conveyance loading fixing the same etc complete | 8 | No | 2,674.6 ₹21,396.8 Lowest | 2,797.6 ₹22,380.8 |
| 9.01 | Add GST 18% | 1 | GST | 16,31,772.2 ₹16,31,772.2 Lowest | 17,06,833.7 ₹17,06,833.7 |
Tender Value
₹1.1 Cr
EMD Value
₹1.1 L
Closing Date
18 Jul 2025, 3:00 pmClosed
The Commissioner Madurai Corporation
Aringar Anna Maligai, Thallakulam, Madurai.
Providing of BT Surface Madakkulam Ration Shop Street- Road in Ward No-71.
2025_MAWS_578519_1
E1/008162/2025 GF package 6
Open Tender
Civil Works
Lump-sum
Madurai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.1 L
11 Sept 2025
7 Jul 2025
18 Jul 2025
7 Jul 2025
18 Jul 2025
7 Jul 2025
Amount
Earth work excavation in all kinds of soils except hard rock requiring blasting, inclusive of shoring, strutting and baling out water wherever necessary refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated depositing the surplus earth within compound in places as shown by the deptl.officers, clearing and leveling the site with initial lead of 10M and lift of 2M etc.Comp.SI.No.62-rate for 10m3 - For Entire Road Portion
Providing and laying, spreading and compacting 0.396m3 of 45-22.40mm & 0.528m3 of 22.40-2.36mm & 0.396m3 of 2.36mm and below metal graded stone aggregate to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in subbase/basecourse on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. MDU-CORP DATA-P-23 -SL No:8
Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev V Specifications MDU Road Data-2020-21-Pg - 21
Providing and laying tack coat of 2.5 kgs/10 sqm over the Prime surface treated with binder using 2.5 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev V Specifications MDU Road Data-2020-21-Pg - 21
Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25 cum of 13.20-2.36mm and 0.23 cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min. required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20- 30t CMP with bitumen boiler, tipper trucks, Paver Finisher /9m paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5
Providing and laying Bituminous Concrete to 30mm/40mm thick using 0.13 cum of 19.00 - 9.50mm, 0.17cum of 9.50 -2.36mm and 0.26cum of 2.36 and below with 50.30kgs of VG30 / VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5.
Raising the existing circular manholes in heavy type including removing the existing manhole cover with frame by dismantling the existing cement concrete and tar road surface alround the manhole raising the manhole with cement concrete 1:2:4 (one cement two sand and four aggregates ) 25 cm height including centering inside the manhole raising ,laying 15 cm tk cement concrete 1:2:4 with 20mm granite chips including finishing the top surface of manhole alround etc., complete.,
Supply of FRC Manhole 600mm size dia cover with frame including cost of conveyance loading fixing the same etc complete
Add GST 18%
M ARULRAJ (BID ID -1405909)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .