Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹4.2 L
EMD Value
₹8,341
Closing Date
13 Oct 2026, 3:00 pm4d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer Hort. Divn No.1, M.C., Chd.
Executive Engineer Hort. Divn No.1, M.C., Chd.
DEVELOPMENT OF PARK BY CONSTRUCTION TOE WALL IN VARIOUS PARKS SECTOR 37, CHANDIGARH, UNDER LANDSCAPING
2026_MCC_94615_3
MCC/H-1/133/2026
Open Tender
Civil Works
Percentage
60 days
DEVELOPMENT OF PARK BY CONSTRUCTION TOE WALL IN VA
Please refer tender documents
2 documents required · 2 mandatory
₹0
₹8,341
6 Oct 2026
6 Oct 2026
13 Oct 2026
6 Oct 2026
13 Oct 2026
6 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by Mechanical means (Hydraulic excavator) manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and remming of bottoms,lift upto 1.5 m,including getting out the excavated soil and disposal of surplus excavated soil as directed, within lead of 50m. All kinds of soil (DSR 2.8.1-2.36) | 20.97 | Cum. | 176 | ₹3,690.72 |
| 2 | Carriage of earth by mechanical transport including loading, unloading Lead of 2 km complete in all respect to the entire satisfaction of the Engineer-In-Charge. | 15.73 | Cum. | 113.29 | ₹1,782.05 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand (zone-III): 10 graded stone aggregate 40 mm nominal size) DSR 4.1.10 | 5.24 | Cum. | 4,212 | ₹22,070.88 |
| 4 | Brick work with F.P.S. bricks of class designation 75 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) (DSR 6.1.1) | 23.6 | Cum. | 7,188 | ₹1,69,636.8 |
| 5 | Providing and laying position cement concrete of specified grade excluding the cost of centring and shuttering , All work plinth level: - 1:2:4 (:1 cement : 2 coarse sand : 4 graded stone agg 12.5mm nominal size Complete in all respect to the entire satisfaction of the Engineer-In-Charge.(DSR 4.1.3) | 1.78 | Cum. | 6,006 | ₹10,690.68 |
| 6 | Dismantlling of existing M.S. flat railing on brick masonary toe wall or on ground and removing of CC 1:2;4 block of size 1'-0"x0'-9"x1'-0" complete in all respect to the entire satisfaction of Engineer-in-Charge. | 131.48 | Rmt. | 34 | ₹4,470.32 |
| 7 | Refixing of old MS flat railing on brick masonary toe wall by providing CC 1:2:4 block of size 1'-0"x0-9"x1'-0" including cost of applying coat of synthetic enamel paint of approved brand complete in all respect to the entire satisfaction of Engineer-in-Charge. | 131.48 | Rmt. | 202 | ₹26,558.96 |
| 8 | 15mm cement plaster of mix: 1:4 (1 cement: 4 coarse sand) to the entire satisfaction of Engineer-in-Charge. (DSR 13.5.1) | 118.39 | Sqm. | 282 | ₹33,385.98 |
| 9 | Pointing on brick work or brick flooring with cement mortar 1:3 (1 cement : 3 fine sand) Flush/ Ruled/ Struck or weathered pointing to the entire satisfaction of Engineer-in-Charge. (DSR 13.31.1) | 68.83 | Sqm. | 171 | ₹11,769.93 |
| 10 | Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. as required. (DSR 10.25.2) | 409.01 | Kg. | 138 | ₹56,443.38 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.69 MB
BOQ_117920.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .