| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹59.5 LAdmitted-Finance | -4.04% | ₹59.5 L | L1 | Admitted-Finance |
| 2 | L2₹61.4 L+₹1.9 L (3.17%)Admitted-Finance BEENPUR KALAN DISTT KASGANJ | KASGANJ | UTTAR PRADESH | 207123 | -1.00% | ₹61.4 L+₹1.9 L (3.17%) | L2 | Admitted-Finance |
| 3 | L3₹62.0 L+₹2.5 L (4.20%)Admitted-Finance | -0.01% | ₹62.0 L+₹2.5 L (4.20%) | L3 | Admitted-Finance |
Tender Value
₹73.2 L
EMD Value
₹1.5 L
Closing Date
4 Aug 2026, 12:00 pmClosed
Superintending Engineer
Dhanipur block office ke pass near Canra bank training center S E RED Office Aligarh
Construction of Building at S T D M Inter college soron(kasganj)
2026_REDUP_1165692_1
455/red/ksj/file no 03/bond clerk/2026-27 dt 22-06-2026
Open Tender
Civil Works - Buildings
Percentage
365 days
kasganj
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,500
₹1.5 L
Yes
21 Sept 2026
4 Jul 2026
4 Aug 2026
4 Jul 2026
4 Aug 2026
4 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil as per SI.No. 2.8.1 | 191.92 | Cum | 185.46 | ₹35,593.48 |
| 2 | Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-termite treatment (excluding the cost of chemical emulsion) Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor: With Chlorpyriphos/Lindane E.C. 20% with 1% concentration as per SI.No. 2.35.3.1 | 337.5 | Sqm | 220.9 | ₹74,553.75 |
| 3 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. (Under Floor) as per SI.No. 2.25 (a) | 220.32 | cum | 499.09 | ₹1,09,959.51 |
| 4 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. as per SI no 2.27 | 33.75 | cum | 1,513.12 | ₹51,067.8 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-lll) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) As per SI no. 4.1.8 | 73.56 | cum | 4,853.39 | ₹3,57,015.37 |
| 6 | Brick work with common burnt clay (non modular) bricks of class -150 in foundation and plinth in Cement mortar 1:4 (1 cement : 4 coarse sand) as per SI No- 6.1.1 | 6.9 | cum | 5,251.41 | ₹36,234.73 |
| 7 | Brick work with common burnt clay (non modular) bricks of class -150 in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse sand) as per SI No- 6.1.2 | 122.97 | cum | 5,081.56 | ₹6,24,879.43 |
| 8 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level in :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) as SI No-5.1.2 | 9.99 | cum | 6,444.88 | ₹64,384.35 |
| 9 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 1:1.5:3 (1 cement : 1.5 coarse sand (zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) Upto Plinth Lvl as SI No-5.1.2 | 7.18 | cum | 6,444.88 | ₹46,274.24 |
| 10 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) Above Plinth Lvl as SI No-5.2.2 | 16.98 | cum | 7,732.47 | ₹1,31,297.34 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.17 MB
SBD.pdf
Tender Documents • 0.86 MB
BOQ_2186293.xls
BOQ • 0.37 MB
Corri.pdf
PDF • 0.11 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .