| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹37.1 LAccepted-Finance SEETHA NILAYA MADYA SURATHKAL | DAKSHINA KANNADA | KARNATAKA | 574107 | ₹37.1 L | L-1 | Accepted-Finance Accepted by CA since the bidder is L-1 |
| 2 | L-2₹37.2 LRejected-Finance NO 1 57 CLIFFTHI COTTAGE NEAR KALLODI BAJPE MANGALURU 574 142 | DAKSHINA KANNADA | KARNATAKA | 574142 | ₹37.2 L | L-2 | Rejected-Finance Not the L-1 Hence not accepted by CA |
| 3 | L-3₹37.6 LRejected-Finance | ₹37.6 L | L-3 | Rejected-Finance Not the L-1 Hence not accepted by CA |
| 4 | L-4₹40.3 LRejected-Finance | ₹40.3 L | L-4 | Rejected-Finance Not the L-1 Hence not accepted by CA |
| 5 | L-5₹40.7 LRejected-Finance | ₹40.7 L | L-5 | Rejected-Finance Not the L-1 Hence not accepted by CA |
| Sl No | Description | Qty | Unit | CIS GLOBAL INFRATECH PVT LTD L11 | Mohammed Azmal L4 | DSOUZA ELECTRICALS L2 | SV ENGINEERING & CONSTRUCTION L10 | M N NAIDU CONSTRUCTIONS L9 | umar anees L3 | SHRADDHAM ASSOCIATES L7 | SUDHIR ELECTRICALS L1 | RAJESH L6 | VIJAY KUMAR G L5 | SPJANANI INFRACON PRIVATE LIMITED L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling & Demolition Work: Dismantling laterite stone work cm by manually/ by mechanical means including stacking of serviceable and disposal area as per direction of engineer-in-charge. | 170 | Cubic meter | 2,200 ₹3.7 L | 840 ₹1.4 L | 175 ₹29,750 | 1,700 ₹2.9 L | 850 ₹1.4 L | 400 ₹68,000 | 850 ₹1.4 L | 480 ₹81,600 | 765 ₹1.3 L | 848.35 ₹1.4 L | 500 ₹85,000 |
| 2.00 | Roofing works: Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of buildings & bridges and such similar works in all kinds of soils, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface levelled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. | 290 | Cubic meter | 500 ₹1.4 L | 203 ₹58,870 | 200 ₹58,000 | 400 ₹1.2 L | 250 ₹72,500 | 130 ₹37,700 | 220 ₹63,800 | 155 ₹44,950 | 240 ₹69,600 | 205.1 ₹59,479 | 240 ₹69,600 |
| 3.00 | Concrete works: Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) – Mix 1:3:6 Using 20 mm nominal size graded crushed coarse aggregates | 25 | Cubic meter | 8,800 ₹2.2 L | 5,222 ₹1.3 L | 4,500 ₹1.1 L | 5,100 ₹1.3 L | 8,500 ₹2.1 L | 4,750 ₹1.2 L | 5,800 ₹1.4 L | 3,895 ₹97,375 | 5,000 ₹1.3 L | 5,268.91 ₹1.3 L | 6,300 ₹1.6 L |
| 4.00 | Concrete works: Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification | 11 | Tonn | 1,00,000 ₹11 L | 66,369 ₹7.3 L | 59,000 ₹6.5 L | 90,000 ₹9.9 L | 95,000 ₹10.4 L | 70,000 ₹7.7 L | 72,000 ₹7.9 L | 67,000 ₹7.4 L | 62,727 ₹6.9 L | 75,000 ₹8.3 L | 90,000 ₹9.9 L |
| 5.00 | Concrete works: Providing and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but including the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M30 Grade | 50 | Cubic meter | 14,000 ₹7 L | 5,737 ₹2.9 L | 7,250 ₹3.6 L | 8,000 ₹4 L | 12,000 ₹6 L | 5,650 ₹2.8 L | 5,900 ₹3.0 L | 5,900 ₹3.0 L | 6,400 ₹3.2 L | 4,093.43 ₹2.0 L | 7,400 ₹3.7 L |
| 6.00 | Concrete works: Providing and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but including the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M30 Grade | 58 | Cubic meter | 15,000 ₹8.7 L | 9,470 ₹5.5 L | 10,000 ₹5.8 L | 12,600 ₹7.3 L | 12,000 ₹7.0 L | 9,500 ₹5.5 L | 9,800 ₹5.7 L | 8,700 ₹5.0 L | 10,327 ₹6.0 L | 9,554.72 ₹5.5 L | 8,000 ₹4.6 L |
| 7.00 | Masonry Works: Providing and constructing load bearing wall with Solid Concrete blocks of size 400x150x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications | 610 | Square meter | 1,200 ₹7.3 L | 1,034 ₹6.3 L | 900 ₹5.5 L | 1,720 ₹10.5 L | 1,300 ₹7.9 L | 1,100 ₹6.7 L | 950 ₹5.8 L | 995 ₹6.1 L | 1,068 ₹6.5 L | 1,043.27 ₹6.4 L | 1,400 ₹8.5 L |
| 8.00 | Finishing Works: Providing 20 mm cement plaster of mix :1:4 (1 cement: 4 fine sand) to brick/stone masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge | 1,850 | Square meter | 560 ₹10.4 L | 297 ₹5.5 L | 300 ₹5.5 L | 460 ₹8.5 L | 225 ₹4.2 L | 255 ₹4.7 L | 340 ₹6.3 L | 265 ₹4.9 L | 313.5 ₹5.8 L | 300.02 ₹5.6 L | 370 ₹6.8 L |
| 9.00 | Painting Works: Providing and applying two coat of exterior pant of Apex having anti fungus and water resistance character of approved colour and shade over a existing white wash/ colour wash by steel brushing/scalping, providing scaffolding, filling of cracks with putty where necessary complete. With primer. | 1,850 | Square meter | 200 ₹3.7 L | 115 ₹2.1 L | 80 ₹1.5 L | 110 ₹2.0 L | 150 ₹2.8 L | 60 ₹1.1 L | 100 ₹1.9 L | 80 ₹1.5 L | 97.8 ₹1.8 L | 116.11 ₹2.1 L | 189 ₹3.5 L |
| 10.00 | Steel and Aluminium Works: Fencing with G.I. barbed wire Angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used | 1,050 | Running meter | 180 ₹1.9 L | 15 ₹15,750 | 25 ₹26,250 | 45 ₹47,250 | 15 ₹15,750 | 14 ₹14,700 | 13 ₹13,650 | 16.5 ₹17,325 | 18 ₹18,900 | 15.26 ₹16,023 | 170 ₹1.8 L |
Tender Value
₹48.0 L
Closing Date
26 Nov 2025, 3:00 pmClosed
Dy Director NITK
NITK, Srinivas Nagar, Surathkal
Reconstruction of boundary compound wall from western of 5th Boys Hostel to Superintending Engineer Office, in NITK
2025_NITK_884797_1
Tender- 10 2nd call/2025-26/HD
Open Tender
Civil Works
60 days
NITK, SRINIVASNAGAR, SURATHKAL
As per Tender Doc
9 documents required · 9 mandatory
₹0
Exempted
5 Feb 2026
10 Nov 2025
27 Nov 2025
10 Nov 2025
26 Nov 2025
11 Nov 2025
Dismantling & Demolition Work: Dismantling laterite stone work cm by manually/ by mechanical means including stacking of serviceable and disposal area as per direction of engineer-in-charge.
Concrete works: Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) – Mix 1:3:6 Using 20 mm nominal size graded crushed coarse aggregates
Concrete works: Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification
Concrete works: Providing and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but including the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M30 Grade
Concrete works: Providing and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement (OPC) @ 75% & GGBS @ 25% proportion, admixtures to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but including the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer-in-charge. RMC M30 Grade
Masonry Works: Providing and constructing load bearing wall with Solid Concrete blocks of size 400x150x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications
Finishing Works: Providing 20 mm cement plaster of mix :1:4 (1 cement: 4 fine sand) to brick/stone masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge
Painting Works: Providing and applying two coat of exterior pant of Apex having anti fungus and water resistance character of approved colour and shade over a existing white wash/ colour wash by steel brushing/scalping, providing scaffolding, filling of cracks with putty where necessary complete. With primer.
Steel and Aluminium Works: Fencing with G.I. barbed wire Angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used
Steel and Aluminium Works: Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete.
Finishing Works: Painting with synthetic enamel paint of approved brand and manufacture to give an even shade: Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge
Finishing Works: Providing and finishing “NITK” Letter with 25mm cement plaster of mix :1:3 (1 cement : 3 fine sand) with letter size of 300mm x 300mm every span of 4m interval, including cost of painting, labour, material, mechanics, travel. Etc., complete as per the direction of Engineer in charge.
stage.html
html • 0.07 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
Tendernotice_2.pdf
PDF • 7.22 MB
BOQ_929989.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid