Superintending Engineer
Superintending Engineer Electricity Distribution Circle, Santkabirnagar
Work of shifting of electric poles/systems from NH road to Patkhauli road to connect it with two lanes of Sant Kabir Nagar district under Executive Engineer Electricity Distribution Division khalilabad
2024_PVVNV_936652_1
03/EDC(SKN)/2024-25
Open Tender
Electrical Works
Fixed-rate
90 days
Santkabirnagar
As Per Tender Specification
2 documents required · 2 mandatory
₹1,180
SE EDC SANT KABIR NAGAR
₹6,000
1 Aug 2024
8 Jul 2024
31 Jul 2024
8 Jul 2024
30 Jul 2024
8 Jul 2024
DECENTRALISED MATERIAL (INCLUDING GST)
STAY CLAMP
LOOP INSULATOR
F- BRACKET
T-OFF CHANNEL
TOP CHANNEL 100*50*2240MM
CLAMP FOR TOP CHANNEL
DROPPER CHANNEL 100*50*2000MM
CLAMP FOR DROPPER CHANNEL
S/S BASE ANGLE 75*75*6*2028MM WITH NUT BOLT
CLAMP WITH NUT BOLT
DEAD END CLAMP WITH EYE HOOK
SUSPENSION CLAMP WITH EYE HOOK
PIERCING CONNECTOR
LT XLPE 1*240SQMM
dk;Z dk fooj.k (Including GST)
Carriage of STP Poles from Store to Site (0-90KM)
Carriage of Line Material and Acessaries Items from Store to Site (0-90KM)
Grouting of pole with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost)
Grouting of stay sets including digging of pit with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms, fixing binding and nuzzling of stay wire. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost)
Shifting, loading, carriage& Erection of Single pole structure on 11 mtr. ST Pole including all works of excavation of pit, pole erection, back filling of earth, proper ramming & fitting of all accessories ('V' type cross arm clamps with bolt and nut, Channel-bracket, F-Bracket,Polymer Pin Insulator, Danger board with clamp, No. plate,earthing, painting of pole with paint, making of Plinth around ST Pole etc. complete).
Stringing & sagging of 3 phase 11 KV line upto proper sag including laying of ACSR Weasel Conductor, binding with insulators & jumpering
Hanging of ABC Cable with Dead End and Suspension Clamp with DB Box
Tree Cutting/Trimming Near Proposed Line
Installation of Distribution Transformer at Double Pole/Single Pole
Fixing of distribution box complete
Dismantalling of consumer cable and resetting after work.
Dismantalling of old conductor including complet work.
Line Dismantling Charge
Returing of old Material from Site to Store as per Received by JE's
TAG SYSTEMS
IKRAM ENGINEERING WORKS
ABHINANDA POWER DISTRIBUTION PRIVATE LIMITED
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .