Tender Value
₹5 L
EMD Value
₹10,000
Closing Date
30 Sept 2026, 6:00 pm3d left
Block Development Officer
Rangli Rangliot Dev. Block, Takdah
Construction of Concrete Foothpath from 1) Mani Kumar Rai house to Suk Bahadur Rai house and 2) Nawla house to Dhobi Jhora, Singrimtam GP
2026_DMD_5074488_6
19/RR/BDO/MPLADS 18th L.S./2026-27 Date- 23/09/2026
Open Tender
CIVIL WORKS
Percentage
30 days
Singrimtam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹10,000
Yes
23 Sept 2026
23 Sept 2026
6 Oct 2026
24 Sept 2026
30 Sept 2026
24 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 141.15 | Cum | 119.27 | ₹16,834.96 |
| 2 | Earth work in filling in foundation trenches or plinth with good earth in layers not exceeding 150 mm. including watering and ramming etc.layer by layer complete .(payment to be made on the basis of measurement of finished quantity of work).(a) With earth obtained from excavation of foundation. | 141.15 | Cum | 77.54 | ₹10,944.77 |
| 3 | Laying 150 mm. to 200 mm. boulder soling including rough dressing hand packing and ramming down small pieces in the interstics without rolling but including ramming. | 352 | sqm | 50 | ₹17,600 |
| 4 | Cost of Boulder | 52.8 | Cum | 1,272 | ₹67,161.6 |
| 5 | Cement Concrete with 40mm down graded shingle excluding shuttering. In ground floor. a) 1:3:6 Proportion | 34.95 | Cum | 5,971.2 | ₹2,08,693.44 |
| 6 | Plum Concrete work with 40 % Cement Concrete with 30 mm down graded stone metal and 60% stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any.(i) (1:3:6) proportion. | 12 | Cum | 3,964.8 | ₹47,577.6 |
| 7 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)
(a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In- Charge. | 81 | Sqm | 334 | ₹27,054 |
| 8 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor). | 90 | Sqm | 211.2 | ₹19,008 |
| 9 | Neat cement punning about 1.5mm thick in wall, dado, windowsill, floor etc.NOTE:Cement 0.152 cu.m per100 sq.m. | 90 | Sqm | 40.8 | ₹3,672 |
| 10 | Unseen | 1 | l/s | 986.5 | ₹986.5 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.07 MB
SBD.pdf
Tender Documents • 0.39 MB
BOQ_5161564.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .