Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-Finance | ₹4.2 L | L1 | Accepted-Finance Success in Lottery |
| 2 | L3₹4.2 LSame as L1Accepted-Finance | ₹4.2 LSame as L1 | L3 | Accepted-Finance Not success in lottery |
| 3 | L3₹4.2 LSame as L1Rejected-Finance AT NEAR HANUMAN TEMPLE KAKARUDRAPUR PO BRAHMANSARANGI PS BALIANTA DIST KHURDHA | ₹4.2 LSame as L1 | L3 | Rejected-Finance Not success in lottery |
| 4 | L3₹4.2 LSame as L1Rejected-Finance | ₹4.2 LSame as L1 | L3 | Rejected-Finance Not success in lottery |
| 5 | L3₹4.2 LSame as L1Rejected-Finance AT PO DEULIDHARPUR PS BALIPATNA DIST KHURDHA | KHORDHA | ODISHA | 751001 | ₹4.2 LSame as L1 | L3 | Rejected-Finance Not success in lottery |
Tender Value
₹4.2 L
EMD Value
₹4,231
Closing Date
21 Jul 2026, 5:00 pmClosed
Divisional Officer
RURAL WORKS DIVISION, BHUBANESWAR
RI Office at Balianta_building
2026_CERWI_135701_1
Tender online Division BBSR-09
Open Tender
Civil Works - Buildings
Percentage
60 days
Khordha
2 documents required · 2 mandatory
₹2,000
₹4,231
Yes
5 Sept 2026
14 Jul 2026
22 Jul 2026
14 Jul 2026
21 Jul 2026
14 Jul 2026
14 Jul 2026 - 21 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation of foundation in hard soil within initial lead of 50 mtr and lift of 1.5 mtr etc including levelling and dressing the foundation trenches, stacking the excavated materials away from the work site etc as per the instruction of E.I.C. | 29.85 | Cum | 282.88 | ₹8,443.97 |
| 2 | Supplying, filling in foundation & plinth with well watered sand in layers not exceeding 150mm thick including watering and ramming with cost conveyance, royalities, taxes of all materials and labour with T&P required for the work etc. complete as per direction of the Engineer-in-charge. | 34.51 | Cum | 638.98 | ₹22,051.2 |
| 3 | Providing Cement concrete of proportion (1:3:6) in foundation and floors using 4cm size black broken granite stone aggregates of approved quality and from approved quarry including hoisting, lowering and laying concrete in layers not exceeding 15cm(6") thick to the required level ramming, watering, curing etc. complete including cost and conveyance royality taxes of all materials and labour with T&P required for the work etc. complete i as per direction of the Engineer-in-charge. | 4.44 | Cum | 6,379.73 | ₹28,326 |
| 4 | Brick work with Fly Ash brick in foundation & plinth using 25cmx12cmx8cm size bricks having crushing strength not less than 35kg./cm2 with dimensional to lerance 2% in c.c. (1:6) after immersing the bricks for six hours in water before use in foundation & plinth, basement & for ornametal flower heads plinth moulding & similar such type of works with all necessary projection, cutting, moulding, corebelling, chamfering, watering & curing including cost, conveyance, royalties & all type of taxes of all materials & labour, T&P required for the work etc. complete as per specification * direction of the E.I.C. | 6.9 | Cum | 5,924.19 | ₹40,876.91 |
| 5 | R.C.C M-30 grade with 20mm and down grade C.B. chips of approved quality from approved quarry including hoisting, laying hire charges of concrete mixture, vibrator, watering, curing and cost of all materials and labour,centering shuttering etc complete but excluding cost of reinforcement complete. (Item-4, AR-2006)
A) Column Base
B) Column | 4.36 | Cum | 7,133.58 | ₹31,102.41 |
| 5.1 | B) Column | 1.39 | Cum | 18,955.79 | ₹26,348.55 |
| 5.2 | C) Plinth band | 2.19 | Cum | 8,757.5 | ₹19,178.93 |
| 5.3 | D) Lintel | 1.1 | Cum | 11,380.83 | ₹12,518.91 |
| 5.4 | E) Chajja | 9.27 | Sqm | 1,285.44 | ₹11,916.03 |
| 6 | Supplying and straightening bent up or coiled rods cutting, bending, cranking, hooking, welding (if required) the M.S.Rods or Tor steel & binding and tying the grills, hoisting, lowering & placing in proper position as required for R.C.C. works with all cost, conveyance & taxes of M.S. rods or Tor steel & binding wires of 18 to 20 gauge & labour with all T&P required for the work etc. complete in all floors (weight of binding wires and laping of MS rod will not be considered for payment & payment will be made on weight of M.S.rods or Tor steel only).as per direction of the Engineer-in-charge. | 14.88 | Qntl | 9,539.8 | ₹1,41,952.22 |
stage.html
html • 0.09 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 2.46 MB
Tendernotice_1.pdf
PDF • 2.81 MB
BOQ_601351.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .