Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.9 LAccepted-Finance | L1 | Accepted-Finance Being lowest | |
| 2 | L2₹19.6 L+₹69,316 (3.67%)Rejected-Finance | L2 | Rejected-Finance not being lowest | |
| 3 | L3₹20.8 L+₹1.9 L (9.86%)Rejected-Finance | L3 | Rejected-Finance not being lowest | |
| 4 | L4₹28.6 L+₹9.7 L (51.5%)Rejected-Finance HOUSE NO 206 GAIKWAD ALI NEAR DATTA CHOWK MUNDHWA PUNE 411036 | PUNE | MAHARASHTRA | 411036 | L4 | Rejected-Finance not being lowest |
Tender Value
₹35 L
EMD Value
₹70,000
Closing Date
15 Nov 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Garrison Engineer (CME) Khadki
Garrison Engineer (CME) Khadki, Phugewadi, Dapodi, Kendriya vidyalay Gate , beside Unlimited (Mega Mart) Mall, Pune - 411 012
Internal and external periodical services to MD and OTM accn at CME
2023_MES_624017_1
8460/E8
Open Tender
Paint / Enamel Works
Item Rate
180 days
Garrison Engineer (CME) Khadki
Class D, a(I)
7 documents required · 7 mandatory
₹500
Yes
Garrison Engineer (CME) Khadki
₹70,000
Yes
22 Nov 2023
19 Oct 2023
17 Nov 2023
19 Oct 2023
15 Nov 2023
2 Nov 2023
20 Oct 2023 - 1 Nov 2023
Amount
M & L for preparation of plastered or unplastered old decorated surfaces of walls including brooming down or scraping down with steel wire brushes of smoke spots, moulds, moss efflourescent, salts and treating oil and greasy spots and applying one coat of white (lime) wash complete all as specified and directed.
All as specified in Item No.1 above, but applying one coat of white wash on ceiling.
All as specified in item No.1 above, but applying one coat of Oil bound distemper on walls complete
All as specified in Item No.1 above, but applying 3mm thick Birla wall putty over plastered and other surfaces Note:- The rate quoted by the contractor shall deem to include for scaffolding to carry out the work for height of ten storey building (Ground+nine)
M & L Priming over ( plastered / unplastered / surface where 3mm wall care putty applied in item No. 4 ) and other surfaces with alkali resistant priming paint all as specified and directed.
M & L for complete scraping down of old decorative surface of walls with steel wire brushes of smoke spots, moulds, moss efflourescent salts, treating oils, greasy spots and applying two coats of Oil bound distemper over a coat of primer all as specified and directed. Note:- The rate quoted by the contractor shall deem to include for scaffolding to carry out the work for height of ten storey building (Ground+nine)
M & L for preparation of old surface of ceiling and applying one coat of oil bound distemper complete all as specified and directed.
M & L for complete removal of existing treatment from walls, filling the holes/cavities and plastering the surface required, cleaning and preparation of the surfaces and applying two coats of exterior emulsion paint 100% acrylic as per manufacturers instruction complete all specified and directed.
M & L for one coat of synthetic enamel paint over wooden surfaces including preparation of old surfaces over 10cm width or girth all as specified and directed
M & L for painting one coat synthetic enamel paint on steel surface including preparation of old surface of any description, over 10 cm width or girth not otherwise described all as specified and directed
Taking down cement plaster on brick or stone walls or concrete surface etc including raking out joints, hacking for key scrubbing down with water all as specified and directed.
M&L 15mm thick cement plastering on stone masonry surfaces in CM (1:6) finishing surfaces even and fair without using extra cement over and including 10mm thick dubbing out on irregular face of wall in CM 1: 6 complete all as specified and directed.
M&L rendering 5mm thick on concrete surfaces in CM 1:3 on ceiling, finished even and smooth with sagol all as specified and directed.
M&L preparing newly plastered surfaces of wall and applying complete wall with POP/Birla putty 3mm thick for making smooth surfaces and applying two coats of Oil bound distemper over a coat of primer all as specified and directed.
M & L for cleaning the Ashlar masonry, RR Masonry surface and removing dirt, dust, bird dropping, grease, oil, algae, fungus, monkey beats, vegetable growth etc., with the help of required scrubbers and also cleaning with machine operated water jet mixed with desired quantity of fine silica where ever required, without causing any scratching/ damage to the stone surface and finally washing the surface with clean water with the help of pressure jet machine, complete in all respect, including taking all precautions to safeguard ventilators, windows, doors etc. by suitable covering so as to avoid any damage to the building/structure, all as per direction of Engineer-in-charge Note:- The rate quoted by the contractor shall deem to include for scaffolding to carry out the work for height of ten storey building (Ground+nine)
Raking out joints of stone masonry surface to the required width and depth, with due care and precaution, by mechanical / manual means, including preparing and cleaning the surface for re-pointing/ refillingof joints, including disposal of rubbish to the dumping ground within 50 metre lead all as specified and directed. Note:- The rate quoted by the contractor shall deem to include for scaffolding to carry out the work for height of ten storey building (Ground+nine)
M & L for Ruled / Flush pointing on Ashlar masonry, Stone masonry surface with lime, surkhi and marble dust mortar in the ratio of 1:1.5:1/2 {One lime: 1.5 surkhi (50% red and 50% light yellow surkhi ) : 1/2 marble dust}. Note:- The rate quoted by the contractor shall deem to include for scaffolding to carry out the work for height of ten storey building (Ground+nine)
M&L for preparation of newly plastered surfaces ceiling and applying complete ceiling with 3mm POP/Birla putty and making smooth surface and applying three coats of white wash over a coat of POP/Birla putty all as specified and directed.
(Applicable for above all items)
Contrator has to employ skilled/unskilled tradesman with adequate experience & required documents to be submitted to office. The rate shall be quoted by the contractor including scaffolding to carry out the work for height more than 10.00 mtrs. (From item No.1 to 10)
Labour should wear contractors uniform with firm logo, failing which recovery should be made.
Contractor has to complte welcome maints in all aspect witin time limit as per Offcier Quarter allowtment letter, failing which recovery will be initiated
Minimum of 02 x teams of each trades shall be available for maint of urgent nature whenever called upon of any trade, failing which recovery will be initiated for not employing adequate labour at site.
Site clearance shall be done by contractor after finishing work and obtain the signature of occupant as the site clearance has done. The same shall be verified and put up before issue of completion certificate.
All Scarps will be done with mechanical scaper
Mechanical scaper should be deposited in our store at the time of sample approval
The rates includes (Ser No 1 to 3, 5) 3mm thick POP putty shall be done by contractor whereever required
A.S.ENTERPRISES
M/s G.N.Shah
AJINKYA VIKRAM GAIKWAD
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .