Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAccepted-AOC | ₹1.8 Cr | L1 | Accepted-AOC Lowest Amount Quoted BY B BALASUBRAMANI (17701443.79) accepted |
| 2 | L2₹2.0 Cr+₹25.1 L (14.2%)Rejected-Finance | ₹2.0 Cr+₹25.1 L (14.2%) | L2 | Rejected-Finance Above Estimate Rate |
| 3 | L3₹2.0 Cr+₹25.6 L (14.5%)Rejected-Finance 40 JAGAJEEVANRAM STREET MINJUR 601 203 | MINJUR | THIRUVALLUR | TAMIL NADU | 601203 | ₹2.0 Cr+₹25.6 L (14.5%) | L3 | Rejected-Finance Above Estimate Rate |
| 4 | L4₹2.1 Cr+₹29.5 L (16.6%)Rejected-Finance | ₹2.1 Cr+₹29.5 L (16.6%) | L4 | Rejected-Finance Above Estimate Rate |
| 5 | L5₹2.1 Cr+₹31.3 L (17.7%)Rejected-Finance 1 1 PANJETTY PANJETTY POST TIRUVALLUR TAMIL NADU 601204 | THIRUVALLUR | TAMIL NADU | 601204 | ₹2.1 Cr+₹31.3 L (17.7%) | L5 | Rejected-Finance Above Estimate Rate |
Tender Value
₹2.1 Cr
EMD Value
₹2.1 L
Closing Date
19 May 2023, 3:00 pmClosed
Collector / Chairman
Collector / Chairman DRDA Tiruvallur
STRENGTHENING OF BT ROAD IN PATTUPALLI TO UMIPEDU COLONY ROAD at SEGANYAM PANCHAYAT IN MINJUR PANCHAYAT UNION PAK MJR74
2023_RDTN_311031_1
DIPR/2142/TENDER/2023
Open Tender
Civil Works - Roads
Item Rate
180 days
BDO Office minjur
Class I and Above
5 documents required · 5 mandatory
₹0
₹2.1 L
Yes
DRDA Tiruvallur
14 Jul 2023
5 May 2023
19 May 2023
5 May 2023
19 May 2023
9 May 2023
9 May 2023
Amount
1. STRENGTHENING OF BT ROAD IN PATTUPALLI TO UMIPEDU COLONY ROAD @ SEGANYAM PANCHAYAT IN MINJUR PANCHAYAT UNION. KM 0/0 - 3/550 @ TIRUVALLUR DISTRICT UNDER MGSMT - 2022 - 2023
Picking the Worn-out BT Surface including incidential charges and cleaning of all labour charges and machinery charges etc,..complete.
Clearing the Scrub jungle removing from away site including incidential charges and all labour charges with burning and ashes including all labour charges etc,..complete.
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying 50 MM Compacted thick Bituminous macadam using 26.5 - 11.2 mm graded metal and 0.10 cum of 13.20 - 2.6 mm graded metal and 0.10 cum of 2.36 mm and below with 49.50 kgs of buitumen for premixing per 10 sqm including cost and conveyance of materials to the work site and stacking them to the department metric gauge for premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in Mini Hot Mix plant for premix carpet only, rolling by 80-100 power roller for premix carpet and seal coat separately including labour charges for spreading the mix of premix carpet, application of bitumen for seal coat over premix carpet etc, including hire charges and fuel charges for Mini Hot Mix Plant, bitumen boiler, Power roller and all other tools and plants employed etc., complete as per clause 504 of MORTH specification.(50 mm thick)
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
collection and supply of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site anf labour charges etc.
Provision for KM Stone
Provision for HM Stone
Provision for Equilqteral Triangle Cautionary Sign Board
Road Marking With Hot Applied Thermoplastic compound with Reflectorising Glass Beads on Bituminous Surface
Road Marker /Road stud with lens Reflector
Provision for Name Board Cum Citizen Boar5d
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
For 1st Year
For 2nd Year
For 3rd Year
For 4th Year
For 5th Year
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
M.KAVITHA
GOWTHAM ENTERPRISES
VIJAY GOWTHAM ENGINEERING WORKS
BALAJI ENTERPRISES
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .