Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.8 LAccepted-AOC 00 DEY ENTERPRISE SODEPUR 9 10 PITS COLLIERY ASANSOL BARDHAMAN WEST BENGAL 713372 | PASCHIM BARDHAMAN | WEST BENGAL | 713372 | L1 | Accepted-AOC L1 | |
| 2 | L2₹38.9 L+₹10,705 (0.28%)Rejected-Finance 17 1 ABHOY HALDER LANE KOLKATA | KOLKATA | L2 | Rejected-Finance L2 | |
| 3 | L3₹39.0 L+₹21,410 (0.55%)Rejected-Finance 18 DHRUBESH CHATTERJEE LANE UTTARPARA HOOGHLY 712258 | UTTARPARA | HOOGHLY | WEST BENGAL | 712258 | L3 | Rejected-Finance L3 | |
| 4 | L4₹39.2 L+₹32,115 (0.83%)Rejected-Finance 6 KRIPANATH DUTTA ROAD KOLKATA 700 002 | KOLKATA | KOLKATA | WEST BENGAL | 700002 | L4 | Rejected-Finance L4 |
Tender Value
Refer Docs
EMD Value
₹82,785
Closing Date
22 Jul 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Government of West Bengal Office of the Executive Engineer, Midnapore Mechanical Division P.H. Engineering Directorate Inda P.H.E. Complex, Kharagpur
Round the clock Operation and Guarding Arrangement of Low Lift, High lift and Gaseous Chlorination Pumping machineries with indoor and outdoor illumination system W.T.P under 31MLD Water based Piped Water Supply Scheme under Paskura Block-II under Mi
2022_PHED_389056_13
WBPHE/EE/MMD/NIeT-02OF2022-23
Open Tender
Electrical Work/ Equipment
Item Wise
180 days
Kharagpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹82,785
Yes
23 Sept 2022
8 Jul 2022
25 Jul 2022
9 Jul 2022
22 Jul 2022
9 Jul 2022
Amount
Daily labour charges with bonus once in a year for operation, guarding of 4 Nos. (2 Working + 2 Stand-by ) each of 75 KW vertical turbine pumping machinery (low lift pump), 6 Nos. (4 Working + 2 Stand-by ) each of 125 KW , 4 Nos. (2 Working + 2 Stand-by ) each of 90 KW centrifugal pump-motor sets respectively for Route-I & Route-II OHRs (High lift) & 2 nos 1.5 KW (1 Working +1 Stand By) De-watering pump-motor sets along with respective controlling devices, L.T. PDB panel cum MCC panels (low lift pump) , PDB panel, individual starter panels , electrical gadgets , actator operated butterfly valves, flow meters, level indicators etc. inside the low lift and high lift pumping station complete with all other electrical accessories and ancilliaries for supply of water by engaging skilled, semiskilled and unskilled personnel round the clock as per direction of E.I.C (w.e.f. 01-11-2022 to 31-10-2023)
Operation & guarding of gaseous chlorination system installed for post chlorination of drinking water for disinfection at WTP by engaging skilled and unskilled personnel (Chlorine Gas Dep’t. Supplied ) as per direcion of EIC. (w.e.f. 01-11-2022 to 31-10-2023)
Routine & Periodical inspection by electrical supervisor having valid suprevisor's certificate of competency from directorate of Electricity (Licensing board),govt. of West Bengal or under any other State Government of India along with Pump Technician / Supervisor / chlorine gas plant supervisor for checking of PDB panel, MCC/ Starter panels for low lift & high lift pumping machineries , valves with actuators along with all other mechanical installation e.g. level indicator, flow meter (Raw Water & clear water) to keep the system in healthy condition. Each Visit should be recorded in the log book (with date and time) to be supplied by the agency and kept in the pump house building . (w.e.f. 01-11-2022 to 31-10-2023)
Day to day maintenance for upkeepment of all electrical & mechanical installation/clorination system by engaging licensed electrician / machanic/ skilled/unskilled labour as and when required by providing all necessary material viz. gland packing for pumps and sluice valves, replacements of indicating lamp with holder, periodic lubrication of motor bearings, O ring/ rubber gasket of chlorination system etc. as per direction of E.I.C. with the all required tools tackles, measuring instruments etc. required to execute maintenance as well as guarding work. (w.e.f. 01-11-2022 to 31-10-2023)
Cleaning of Low lift Pump House, High lift Pump House, Gaseous chlorination plant and its surroundings by engaging sweeper in regular manner by providing all necessary material viz. cotton duster, broom sticks, batteries, carbolic acid, detergent soap, gloves, apron including all tools tackles, etc. required as per direction of E.I.C. (w.e.f. 01-11-2022 to 31-10-2023)
Day to day maintenance of yard lighting arrangement including indoor lighting and outdoor lighting of Raw water & clear water pump house, Sub-station building, chemical house, filter house , laboratory, chlorination room, office room , bungalow, etc including minor repairing by providing switches, Led lamps, wire, fuses, sockets, pvc insulation tapes, including dismantling & refitting fixing of light fixtures etc. as & when required for proper illumination arrangement of WTP as per direction of EIC. (w.e.f. 01-11-2022 to 31-10-2023) N.B- Estimated Rate is inclusive of Labour Cess @1% which will be deducted from Bill )
ORIENTAL ENGINEERING CO.
R.N.S.TRADING
B T PROJECTS PRIVATE LIMITED
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .