Loading…
Loading…
Tender Value
₹16.9 L
EMD Value
₹50,000
Closing Date
16 Oct 2024, 4:00 pmClosed
Bruhat Bengaluru Mahanagara Palike
Subramanya J V
9901754339
Landscape Development and Upgradation Rajarajeshwari Park (in Front of Zonal office) Part-3 Ward no 160
BBMP/2024-25/OW/WORK_INDENT4278
BBMP/2024-25/OW/WORK_INDENT4278
Open
Other Works
Two Tender Document System(Two Cover)
BBMP Senior Assistant Director of Horticulture Rajarajeshwari Nagar
4 documents required · 0 mandatory · 4 optional
Department Registration Details
Total value of civl engineering works executed and payments received in the last five years (year-wise)
List of existing commitments and ongoing work
List of works for which tenders already submitted
Banker Details
Valid ESI Certificate
₹500
₹50,000
8 Oct 2024
8 Oct 2024
17 Oct 2024
9 Oct 2024
Landscape Development and Upgradation Rajarajeshwari Park (in Front of Zonal office) Part-3 Ward no 160
SITE /JUNGLE CLEARENCE: Cutting and clearing thin jungle including removal of roots with a intitial lead of 50 m and life of 1.50 m and General Cleaning: Removal of dried leaves, solid waste and clea...
Planting of TreesDigging pits of size 0.75mx0.75mx0.75m and filling upto 50% of the pits with top excavated soil and remaining 50% with sand(0.035 Cum), Fym(0.070Cum), Red Earth(0.105Cum).(i.e, in th...
Cost of the Plant 5’ - 10' Height
Shrubs in Isolated Plants. Digging pits of size 0.45x0.45x0.45 filling up to 50% of the pits with top excavated soil and remaining 50% with the mixture of sand (0.007Cum) FYM (0.014), Red earth (0.02...
Cost of the Plant ( including Transportation and Handling Charges)
Shrubs in Groups Developing the area for shrubs by digging to a depth of 0.45m, filling 50% with sand [0,0375 Cum], FYM [0.075 Cum], Red earth [0.21], [I.e. in the proportion of 1:2:3] and planting w...
Cost of the Plant (8 Plants per Sqm) including Transportation and Handling Charges
Planting of Creepers Digging pits size 0.45m x 0.45m x 0.45 filling up to 50% the pits with top excavated soil and remaining 50% with the mixture of sand (0.007 Cum) Fym (0.014 Cum) red earth (0,021 C...
Cost of the Plant ( including Transportation and Handling Charges)
Planting of Ground Cover Plants Developing the area for ground cover pants by digging to a depth of 0.45m, filling 50% of the area with excavated top soil and remaining 50%with sand (0.0375 Cum), FYM...
Cost of the Plants (10 Plants per Sqm) including Transportation and Handling Charges
Mound Formation: Providing and forming mound using red earth by filling, spreading and leveling to the required grade s per design. (including scraping and removing top layer of soil,removing unwanted...
DEVELOPMENT OF LAWN SCRAPING AND REMOVING TOP SOIL Cleaning the site by scraping and removing top layer of soil, removing unwanted debris, grass, along with excavated earth to a distance of 500m f...
1st DIGGING FOR LAWN Earthwork digging including removing weeds. debris if any and breaking of clumps watering etc., to a depth of
2nd DIGGING FOR LAWN Digging for second time and removing weeds if any miner leveling to a depth of 0.45m
Soil Filling for Lawn Supply and stocking good quality red earth etc., for filling the top layer to a depth of 0.15m
Providing Sand FYM and Red earth in the ratio of 1 3 6 and spreading to a depth of 7 5 cm at the required site
Chemical Fertilizer Super Phospates
Supply of lawn grass Mexican grass Turf
Other Charge: cost towards dibbling laying of lawn inclusive of mixing of ingradients, application of manure and spreading (5x5 Cm)
Supplying of Red Soil New Earth Filling Supply of Good Quality Red Soil for Gardening and Growing of Plants, Shrubs, Etc Including the weightage given to B.B.M.P. Area.
Sprinkler System: Providing and fixing of sprinkler system with in the site by using 25mm/10kg,40mm/6kg, 50mm/6kg good quality PVC pipes,ISI marked sprinklers, control valves and fitiings etc, Includi...
development of Parks & Planting of specimen plants Digging pits size 0.75m x 0.75m x 0.75 filling up to 50% the pits with top excavated soil and remaining 50% with sand, Fym, Red earth (0,021 Cum) (...
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50% the pits with top excavated soil and remaining 50% with sand, Fym, Red earth (0,021 Cum) (i.e. in the proportion of 1:2:3) and planting of Roys...
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50% the pits with top excavated soil and remaining 50% with sand, Fym, Red earth (0,021 Cum) (i.e. in the proportion of 1:2:3) and planting of Cary...
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50% the pits with top excavated soil and remaining 50% with sand, Fym, Red earth (0,021 Cum) (i.e. in the proportion of 1:2:3) and planting of Cyca...
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50% the pits with top excavated soil and remaining 50% with sand, Fym, Red earth (0,021 Cum) (i.e. in the proportion of 1:2:3) and planting of Ficu...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
KW 1Part-3.docx
Tender Document • 0.11 MB
Notification Final (1).docx
Others - IFT NOTIFICATION • 0.03 MB
Corrigendum letter RR Nagar 2 work.docx
Tender Document • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].