| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-Finance | L1 | Accepted-Finance Fulfill all terms and condition | |
| 2 | L2₹1.6 L+₹7,272.50 (4.73%)Accepted-Finance BHAGATPUR SHIVPUR VARANASI | VARANASI | UTTAR PRADESH | 221001 | L2 | Accepted-Finance Fulfill all terms and condition | |
| 3 | L3₹1.7 L+₹12,612.50 (8.21%)Accepted-Finance | L3 | Accepted-Finance Fulfill all terms and condition |
Tender Value
₹1.5 L
EMD Value
₹2,000
Closing Date
16 Aug 2023, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SUPERINTENDING ENGINEER
SUPERINTENDING ENGINEER EDC SULTANPUR
AS PER NIT
2023_MVVNL_827067_1
41/EDC(S)/2023-24
Open Tender
Electrical Works
Lump-sum
90 days
SULTANPUR
AS PER BOQ
3 documents required · 3 mandatory
₹1,180
SUPERINTENDING ENGINEERS
₹2,000
19 Aug 2023
7 Aug 2023
16 Aug 2023
7 Aug 2023
16 Aug 2023
7 Aug 2023
Amount
Safe carriage/cartage of following items from Store Centre, Sultanpur to work site including loading, unloading and proper stacking (distance within 0-50 Km.)
PCC Pole 8.5 Mtr. Long
ACSR weasel conductor
LT Cable (3x95+1x95+1x16) sq.mm.
LT Cable 3.5x240 sq.mm.
AB Cable (1x16+1x25) sq.mm.
Other Line Materials
T/F 25 KVA
T/F 63 KVA
T/F 100 KVA
Dragging of PCC Pole from site to pit point
Fabrication & erection of single pole support on PCC pole including digging of pit & fixing of all accessories and clamps including grouting & earthing of pole as per RESPO norms.
Fabrication & erection of double pole support on PCC pole including digging of pit & fixing of all accessories and clamps including grouting & earthing of pole as per RESPO norms.
Mounting of 25 KVA T/F on double pole.
Construction of Plinth Suitable for 100 KVA T/F including Fencing of Transformer.
Installation of 63 KVA T/F due to increasing capacity from 25 KVA to 63 KVA along with earthing complete
Installation of 100 KVA T/F due to increasing capacity from 25 KVA to 100 KVA along with earthing complete
Laying of LT Cable (3x95+1x95+1x16) sq.mm.
Laying of LT Cable 3.5x240 sq.mm.
Laying of AB Cable (1x16+1x25) sq.mm.
Stay Complete
25 KVA T/F Received Back Material Form Site To Store Sultanpur
M/s Singh Traders
M/S DHARM ENTERPRAISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .