Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹28.2 L
EMD Value
₹56,433
Closing Date
2 Nov 2026, 5:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EE_COOCHBEHAR_IRRIGATION_DIVISION
EE_COOCHBEHAR_IRRIGATION_DIVISON_DEBIBARI_COOCH_BEHAR
Maintenance and repair to the type B ( 08 Nos) staff quarters at Rajbari Complex under Cooch Behar Irrigation Division within Cooch Behar Municipality ,PS-Kotowali, Dist-Cooch Behar .
2026_IWD_5079223_5
WBIW/EE/COB/e-NIT-13/2026-27
Open Tender
CIVIL WORKS
Percentage
90 days
COOCHBEHAR
REFERRED TO NIT
8 documents required · 8 mandatory
₹56,433
Yes
13 Oct 2026
13 Oct 2026
4 Nov 2026
13 Oct 2026
2 Nov 2026
13 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling artificial stone flooring up to 50 mm thick by carefully chiselling without damaging the base and removing rubbish as directed within a lead of 75 m a) In ground floor including roof. | 131.84 | Sqm | 59.59 | ₹7,856.35 |
| 1.01 | b) Extra for each addl. Floor over the rate of
gournd floor | 65.92 | Sqm | 7.15 | ₹471.33 |
| 2 | Dismantling Orissa pattern W.C. including taking out of base concrete, if necessary, complete. | 16 | Each | 53.63 | ₹858.08 |
| 3 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. In ground floor including roof. (a) upto 150 mm. thick | 4.8 | Cum | 1,119.1 | ₹5,371.68 |
| 3.01 | (c) Extra rate for each addl floor over the rate of ground floor. | 2.4 | Cum | 59.59 | ₹143.02 |
| 4 | Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m
a)In ground floor including roof. | 9.53 | Cum | 532.73 | ₹5,076.92 |
| 5 | Dismantling R.C. floor, roof, beams etc. including
cutting rods and removing rubbish as directed
within a lead of 75 m. including stacking of steel
bars a)In ground floor including roof. | 22.32 | Cum | 2,331.16 | ₹52,031.49 |
| 5.01 | (b) Extra rate for each addl floor over the rate of
ground floor. First floor | 10.03 | Cum | 59.59 | ₹597.69 |
| 6 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns,
lintels curved or straight including fitting, fixing and striking out aftercompletion of works (upto roof of ground floor)
When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht. shall be allowed under 12 (e) for every 4 m or part thereof) (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of
Engineer-In-Charge. | 161.76 | Sqm | 390.91 | ₹63,233.6 |
| 6.01 | d) Extra for works beyond the roof of ground floor per additional floor
(i) upto 4th (per floor) and in basement. | 71.88 | Sqm | 21.45 | ₹1,541.83 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.49 MB
2911_agreement.pdf
Tender Documents • 2.94 MB
BOQ_5181844.xls
BOQ • 0.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .