SE GONDA CIRCLE PWD GONDA
SE GONDA CIRCLE PWD GONDA
Construction of Vikash khand nawabganj gram mainpur dr mamta pandey house to darampurwa pakki sadak to ram lalit pandey house chadi bagiya via chotki dubauli akbarpur main road link road
2026_CEDPW_1186509_2
4008/98Com/Gonda Circle/26-27 Dt 25.08.2026
Open Tender
Civil Works
Percentage
150 days
GONDA
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,600
Yes
₹6.8 L
Yes
Gonda
16 Sept 2026
16 Sept 2026
30 Sept 2026
16 Sept 2026
30 Sept 2026
16 Sept 2026
17 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Embankment with Material Obtained from Borrow Pits / Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical
Specification Clause 301.5 | 6,219.38 | Cum | 100 | ₹6,21,938 |
| 2 | Granular Sub-base with Well Graded Material (Table 400.1) / (A) By Mix in Place Method / Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at
OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. / (i) For Grading I Material | 410 | Cum | 3,530 | ₹14,47,300 |
| 3 | Water Bound Macadam Sub-base/base / (3) WBM Grading 3/ Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand
packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. / (B) By Mechanical Means | 292.5 | Cum | 4,550 | ₹13,30,875 |
| 4 | Cement Concrete Pavement - Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a
prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse
aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron
thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with
shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints,
applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-
days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501. | 562.5 | Cum | 10,435 | ₹58,69,687.5 |
| 5 | Routine Maintenance of road after completion of work :- (A) Carriageway/ Pavement: (a) Potholes, cracks, other surface defects (SWMM & BC), (b) Repair of Edges, Rutting (BC) (B) Road, Embankment, Cutings, Shoulders, Trees & Plantation : (a) Road Maintained free of edge drop, inadequate cross fall, undulations, settlement, Ponding (E/W), (b) Deficent slopes, rain cuts in embankments (E/W), Vegetation growth, Loping of tree branches. (C) Bridges and Culverts: (a) De-Silting, (b) Clearing vegetation growth (Jungle Clearance), (c) Damaged/distrubed boulder pitching, breast/toe wall retaining wall, apron flooring, guide bunds (Boulder Apron), (d) Parapet, any damage to foundations, (e) Any defects in sub-strucures, (f) Any defects in superstructures, raillings, parapets. (g) Wearing coat, (h) Approach slab, (i) Painting & Lettering of No. plates, repair. (D) Repair of Roadside Drains: (a) Brick Work in 1:4, (b) Plaster, (c) CC- 1:2:4.(E) Road Furniture:(a) Cleaning, Painting & lettering of stones & sign boards, Replacement of damaged/ issing stone & sign boards. (b) 200 m Stones, (c) Km stones, (d) 5th km stones. Maintenance requriment as per above and Mentioned in Special Condition of Contract for Maintenance.Payment of Maintenance work as Percentage of final Civil Construction Cost : | 1 | Job | - | - |
| 5.1 | For 1st Year | 1 | Job | - | - |
| 5.2 | For 2nd Year | 1 | Job | 24,100 | ₹24,100 |
| 5.3 | For 3rd Year | 1 | Job | 48,200 | ₹48,200 |
| 5.4 | For 4rth Year | 1 | Job | 72,300 | ₹72,300 |
| 5.5 | For 5th Year | 1 | Job | 96,400 | ₹96,400 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.91 MB
BOQ_2233296.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .